| 1 | 1 | Description of job | | | |
|---|
| 2 | 2 | A) 11 KV O/H Line, 3 wire, GT-1 Near Railway Bridge river side\nDismantling & re-jumphering after erection | | 6 | nos |
|---|
| 3 | 3 | Dismantling of Dog conductor 3 wire x 10 mtr = 30 mtr (as per SOR 12.40) | | 11.82 | Kg |
|---|
| 4 | 4 | Supply & fixing of 11 KV grade pin insulator (as per SOR 13.10) | | 2 | nos |
|---|
| 5 | 5 | Erection of Dog conductor (as per SOR 12.22) | | 11.82 | kg |
|---|
| 6 | 6 | B) 11 KV O/H Line near GT-2 Feeder\nDismantling of jumpher & re-jumphering after work | | 3 | nos |
|---|
| 7 | 7 | Supply & erection of HT Pin Insulator ( as per SOR 13.10) | | 2 | nos |
|---|
| 8 | 8 | C) 2.2 KV O/H Line, feeder no -3, near 10 Pit\nDismantling of jumpher & re-jumphering after work | | 3 | nos |
|---|
| 9 | 9 | Dismantling of HT cable from O/H Line | | 20 | mtr |
|---|
| 10 | 10 | New fresh cutting insulating of HT cable | | 1 | job |
|---|
| 11 | 11 | Erection of cable on O/H line | | 20 | mtr |
|---|
| 12 | 12 | D)2.2 KV O/H, Feeder No-3 &6\nTree branches cutting feeder no 3 & 6 | | 4 | head |
|---|
| 13 | 13 | Supply & erection of HT Pin Insulator ( as per SOR 13.10) | | 2 | nos |
|---|
| 14 | 14 | Dismantling of jumpher & re-jumphering after work | | 6 | nos |
|---|
| 15 | 15 | E) 11 KVO/H line, GT-1 Feeder at near railway bridge river side\nDismantling jumphering & re-jumphering after work | | 6 | nos |
|---|
| 16 | 16 | Dismantling of Dog conductor 3 wire x 10 mtr = 30 mtr (as per SOR 12.40) | | 11.82 | kg |
|---|
| 17 | 17 | Erection of Dog conductor (as per SOR 12.22) | | 11.82 | kg |
|---|
| 18 | 18 | F) 11 KV O/H line near East section\nDismantling of jumpher & re-jumphering after work | | 3 | nos |
|---|
| 19 | 19 | Meggering testing, insulating , pole mounting for 11 KV grade cable | | 1 | job |
|---|
| 20 | 20 | Dismantling of 11 KV cable incoming switch side and cleaning with CRC oil switch side with connection & insulating | | 1 | job |
|---|
| 21 | 21 | Repairing /overhauling of OCB and Bus coupler, cleaning with CRC oil with insulating materials sets for 11 KV switch | | 1 | job |
|---|
| 22 | 22 | G) 11 KV O/H line GT-1 feeder\nDismantling of jumpher & re-jumphering after work | | 3 | nos |
|---|
| 23 | 23 | Dismantling of Dog conductor 3 wire x 10 mtr = 30 mtr (as per SOR 12.40) | | 11.82 | Kg |
|---|
| 24 | 24 | Erection of Dog conductor (as per SOR 12.22) | | 11.82 | Kg |
|---|
| 25 | 25 | H) 11 KV O/H line, GT-2 feeder near 33 KV S/S\nDismantling of jumpher & re-jumphering after work | | 3 | nos |
|---|
| 26 | 26 | Dismantling of 11 KV grade cable | | 20 | mtr |
|---|
| 27 | 27 | Pole mounting of 11 KV grade cable 240 sq mm ( as per SOR 10.2.3) | | 1 | set |
|---|
| 28 | 28 | Erection of cable on O/H line | | 20 | mtr |
|---|
| 29 | 29 | I) 440 V, O/H lihgting line near Kusore east\nDismantling of jumpher & re-jumphering after work | | 4 | nos |
|---|
| 30 | 30 | Dismantling of damaged conductor ,40 mtr length ( as per SOR 12.40) | | 15.76 | Kg |
|---|
| 31 | 31 | Erection of Dog conductor (as per SOR 12.22) | | 15.76 | Kg |
|---|
| 32 | 32 | J)11 KV O/H line near east section 11 KV S/S\nDismantling of jumpher & re-jumphering after work | | 3 | nos |
|---|
| 33 | 33 | K)2.2 KV O/H line , Feeder no-6 from BNR Power House to 10 no S/S\nDismantling of jumpher & re-jumphering after work | | 6 | nos |
|---|
| 34 | 34 | Dismantling of damaged dog conductor ,9 span x1 wire x 50 mtr =450 mtr | | 177.3 | kg |
|---|
| 35 | 35 | Erection of repaired dog conductor ( as per SOR 12.22) | | 177.3 | Kg |
|---|
| 36 | 36 | L) 11 KV/11 0 V PT , GEC make\nOld burnt PT box complete dismantling & lowering 11 KV/110 V | | 2 | set |
|---|
| 37 | 37 | Old burnt PT coil dismantling to box | | 1 | set |
|---|
| 38 | 38 | Old PT bush Pors line insulator dismantling 11 KV | | 3 | set |
|---|
| 39 | 39 | PT box cleaning by kerosene oil | | 1 | job |
|---|
| 40 | 40 | New PT coil boxing insulating testing, mejoring, heating & new cork sheet fitting (11 KV/110V) | | 1 | set |
|---|
| 41 | 41 | New PT bush porceline insulator fitting with new cork sheet fitting | | 3 | set |
|---|
| 42 | 42 | HT fuse 11 KV for PT | | 3 | nos |
|---|
| 43 | 43 | Supply of cork sheet 3' x 2' | | 1 | nos |
|---|
| 44 | 44 | New PT installation 11KV/110V | | 1 | set |
|---|
| 45 | 45 | moulded connector | | 2 | nos |
|---|
| 46 | 46 | M)11 KV O/H line GT-2, near Kanta Ghar, Bhalgora S.S\nWolf conductor dismantling 1 wire x 2 span x 60 mtr x 1 wire = 120 mtr (as per SOR 12.40) | | 87.12 | Kg |
|---|
| 47 | 47 | Supply & fixing of Pin insulator (HT) (As per SOR 13.10) | | 1 | nos |
|---|
| 48 | 48 | Wolf conductor erection (as per SOR 12.22) | | 87.12 | Kg |
|---|
| 49 | 49 | Total impact of GST for the purpose of CTC | | 1 | eighteen percent |
|---|