Manning And Operation Of Mes Installations/Pump Houses ( Robert Line , New Shia Line , Old Race Course , Nehru Road And Carriappa Road ) In The Area Of Age E/M Ext ( Ws ) Under Ge E/M Lucknow

Tender Notice

26128400
Corrigendum : Manning And Operation Of Mes Installations/Pump Houses ( Robert Line , New Shia Line , Old Race Course , Nehru Road And Carriappa Road ) In The Area Of Age E/M Ext ( Ws ) Under Ge E/M Lucknow
Indian
Uttar Pradesh
05-12-2020
12-12-2020
14-12-2020

Tender Details

Manning And Operation Of Mes Installations/Pump Houses ( Robert Line , New Shia Line , Old Race Course , Nehru Road And Carriappa Road ) In The Area Of Age E/M Ext ( Ws ) Under Ge E/M Lucknow

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 03-Dec-202 Corrigendum Financial Bid 05-12-2020
2 05-Dec-202 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 12-12-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 85000.00 /-
Tender Value
Refer document

BOQ Items

Name of Work : MANNING AND OPERATION OF MES INSTALLATIONS/PUMP HOUSES (OLD RACE COURSE, CARRIAPPA ROAD, BASE HOSPITAL, ROBERT LINE AND SHIA LINE) IN THE AREA OF AGE E/M EXT (WS) UNDER GEE/MLUCKNOW.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Providing services for uninterrupted operation of pumping set installation with submersible/monoblock / centrifugal pump set, DG set (any capacity and type ) bleaching powder dozer and chloronome plant of any capacity and type situated at following locations by deploying one no of operator ( semi skilled ), in each installation for each shift of 8 ( eight ) hours for three shift (for duration of 24 Hrs i.e. in three shifts) at each installation including minor repair / maintenance of each installation ,complete all as specified and directed by Engineer- in- Charge . \n(a) Robert line Pump house (b) New shia line Pump House (c) Old race course Pump House (d) Nehru Road Pump House (e) Cariappa road Pump House..\nNote :Total man power (5X3) =15 Nos of Operator, one operator in each installation in each shift (Total three shift) having passed intermediate exam from recognized board and having 03 years experinence of external electric nature work. 5010 Per Shift
2 1.02 Notes :- Rates quoted by the contractor shall be inclusive for following item :- \n(i) Contractor shall provide tool kit comprising of following items - tongue testers/clamp meter -01 spanner set- 01 adjustable wrench-01, discharge rod -01, safety hand gloves , electric safety boots and provided necessary T & P for General Maintanace and opertation . \n(ii) Contractor shall provided two set of uniform, Shoe with Name Plate , Mobile connection , Etc \n(iii) The log sheets will be maintained by the contractor in each installations.Contractor shall provided Log book, Attendence Register,Plant running record book and rate quoted by the contractor shall deemed to included in his quoted rates . \n(iv) The site documents such as Log Sheet, Attendance etc will be checked daily by JE, weekly by Engineer-in-Charge and monthly by GE.\n(v)The contractor will be responsible for upkeep of the installations in neat and tidy conditions and in a presentable manner. The surrounding of the installation will also be maintained neat and clean by removing grasses and other vegetation.\n(vi) All plant and machinery equipment and other items belonging to installation including safety shall be responsibility of manpower employed by the contractor.\n
3 1.03 Notes contd/---\n(vii) Minor stores required should be provided by the contractor.\n(viii) Major stores required for ractification of complaint will be supplied by the demartment\n(ix) Contractor shall submit insurance cover of all the workers employed by him for 11 Month period.\n(x) The quoted rates shall include the upkeep of surrounding area of the plant out side pherifery upto 03 metre / installations including grass/shurb cutting & plantation of seasonal flowers to an area of entire installations and . In case the contractor fails to upkeep of the installations, he shall be liable to penalty @ Rs500/- per day for not upkeep of the installations.\n(xi) Contractor shall submit From 11 to establish the applicability of EPF of workmen duly signed by worker and contractor himself. EPF for all workers as applicable shall be taken into consideration and proper accounts for the same shall be opened and details of the payment of the contribution for the previous month shall be handed over to Engineer in Charge between 15th to 20thdays of the current month and also submit the details of return filed alongwith each RAR as applicable.\n(xii) ESTIMATE COST OF WORK HAS BEEN REVISED PLEASE REFER ERRATA IN THIS REGARD.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail