Construction Of Rcc Roof Cycle Stand In Odisha Adarsha Vidyalaya At Gahirapatuli Under Danagadi Block In The District Of Jajpur For The Year 2020-21 . Building Work
Tender Overview
Project Description
Construction Of Rcc Roof Cycle Stand In Odisha Adarsha Vidyalaya At Gahirapatuli Under Danagadi Block In The District Of Jajpur For The Year 2020-21 . Building Work
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Dec-2020 | Notice to bidders | Other | 04-Dec-2020 |
BOQ
| Name of Work: Construction of RCC Roof cycle stand in Odisha Adarsha Vidyalaya at Gahirapatuli under Danagadi block in the District of Jajpur for the year 2020-21. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Earth work in excavation all kinds of soil within 50m lead and 1.5m lift including rough dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge. | BI01010001010000000000000515BI0100001114 | 107.22 | Cum |
| 2 | 2 | Supplying, filling in foundation & plinth with sand in 23.5cm. (9”) thick layers including watering and ramming with the conveyance royalties, taxes of the materials and labour with T&P required for the work etc. complete(Measurement will be taken on finished compacted section only. | BI01010001010000000000000515BI0100001115 | 73.1 | Cum |
| 3 | 3 | Cement concrete of proporation (1:3:6) in foundation and plinth using 40mm size clean hard black broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm.(6”)thick to the required level ramming, watering, curing etc. complete including cost and conveyance of all materials with all taxes and royalties and all labour with T&P required for the work etc. complete, including dewatering if required as per direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001116 | 40.06 | Cum |
| 4 | 4 | Cement concrete of proporation (1:2:4) using 12mm size hard granite crusher broken chips of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers to the required level ramming, watering, curing etc. complete including cost and conveyance of all materials with all taxes and royalties and all labour with T&P required for the work etc. complete, including dewatering if required as per direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001117 | 19.36 | Cum |
| 5 | 5 | R.C.C. work of M- 20 grade (prop.1:1/2:3)having Minimum compressive strength (in work test) of 200Kgs/sqcm. Cubes at 28 days after mixing and test conducted in accordance with IS-456 and IS 516 using 12mm. To 20mm.(1/2” to ¾”) size (20mm not to exceed 25%) hard black crusher broken granite stone chips approved quality and from approved quarry including hoisting, lowering, laying concrete and compacting by using vibrators watering for 4 weeks including centering shuttering and finishing the exposed surface and providing grooves or beads where necessary including cost, conveyance, taxes and royalties of all materials and labour with T&P required for the work etc. complete in all respect but excluding cost of M.S.rod or Tor steel and binding wires of 18 to 20gauge and labour charges for straightening, cutting, bending, binding wires and tying the grills and placing in proper position including all other specification as per the direction of Engineer-in-charge.\nA) Column Base Footing\n | BI01010001010000000000000515BI0100001118 | 12.94 | Cum |
| 6 | 6 | B) Column super structure | BI01010001010000000000000515BI0100001119 | 4.2 | Cum |
| 7 | 7 | C) Plinth Band | BI01010001010000000000000515BI0100001120 | 7.76 | Cum |
| 8 | 8 | D) Lintel Band | BI01010001010000000000000515BI0100001121 | 6.48 | Cum |
| 9 | 9 | E) Floor Beam | BI01010001010000000000000515BI0100001122 | 9.26 | Cum |
| 10 | 10 | F) Roof Slab | BI01010001010000000000000515BI0100001123 | 27.48 | Cum |
| 11 | 11 | Straightening bent up or coiled rods cutting, bending, cranking, hooking, welding or jointing (if required)the M.S.rods or Tor steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for R.C.C. works and including cost, conveyance and taxes of M.S.rods or Tor steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc. complete in all floors(weight of binding wires/ over lapping/Wastage of rod will not be considered for payment and payment will be made on weight of M.S.Rods or Tor steels only) including all other specification as per the direction of the Engineer-in-Charge. | BI01010001010000000000000515BI0100001124 | 79.64 | Qtl |
| 12 | 12 | Fly ash brick 25cmx12cmx8cm masonry in cement mortar(1:6) after immersing bricks for six hours in water before use in Foundation & Plinth with all necessary projections using Bricks of 10” size having a crushing strength of not less than 75Kgs/Sqcm with dimensioinal tolerance +2 perceent including splays cutting, circular moulding, chamfering, corbelling and similar such types of works with all necessary projections watering and curing. complete including cost and conveyance, royality & taxes of all materials and labour with T&P required for the work with all etc. complete in all all respect in all floors with all other specifications as per the direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001125 | 25.58 | Cum |
| 13 | 13 | Fly ash brick 25cmx12cmx8cm masonry in cement mortar(1:6) after immersing bricks for six hours in water before use in Super Structure with all necessary projections using Bricks of 10” size having a crushing strength of not less than 75Kgs/Sqcm with dimensioinal tolerance +2 perceent including splays cutting, circular moulding, chamfering, corbelling and similar such types of works with all necessary projections watering and curing. complete including cost and conveyance, royality & taxes of all materials and labour with T&P required for the work with all etc. complete in all all respect in all floors with all other specifications as per the direction of Engineer-in-charge.\n | BI01010001010000000000000515BI0100001126 | 22.06 | Cum |
| 14 | 14 | 12mm.(1/2”) thick cement plaster (1:6) over brick work finished smooth to inside/ outside brick walls after raking out the joint including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete in all respect in all floors as per the direction of the Engineer-in-charge.\n | BI01010001010000000000000515BI0100001127 | 49.6 | Sqm |
| 15 | 15 | 16mm.(5/8”) thick cement plaster (1:6) over brick work finished smooth to inside surface of 9”/10” thick brick walls after raking out the joint including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete in all respect in all floors as per the direction of the Engineer-in-charge.\n | BI01010001010000000000000515BI0100001128 | 88.2 | Sqm |
| 16 | 16 | Priming one coat with wall primer water bond cement primer with brush to inside/ outside wall surface after cleaning surface including cost of primer watering and curing cost conveyance and taxes of all materials and labour with T&P required for the work etc. complete as per the direction of the Engineer-in-charge. | BI01010001010000000000000515BI0100001129 | 147.4 | Sqm |
| 17 | 17 | Distempering two coats to walls with distemper of approved shade on new work to give an ven shade including cost of distemper including watering and curing cost conveyance and taxes of all materials and labour with T&P required for the work etc. complete. | BI01010001010000000000000515BI0100001130 | 97.8 | Sqm |
| 18 | 18 | Wall painting 2 (Two) coats with any approved Weather Coat paint over a coat of primer with brush to outside wall surface after cleaning surface including cost of paint and primer, watering and curing cost conveyance and taxes of all materials and labour with T&P required for the work etc. complete. | BI01010001010000000000000515BI0100001131 | 49.6 | Sqm |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender