Public Works Department-PWD has published Providing And Laying Of 50Mm Thick Bm And 25Mm Thick Ogpc On 200 Bedded Hospital Gandhi Nagar Jammu Please Refer To Boq. Submission Date for this Tender is 04-12-2020. Road Work Tenders in 20 Bedded Hospital Gandhi Nagar Jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Dec-2020 | Nomenclature of work | Other | 04-12-2020 |
Name of Work :- Providing and laying of 50mm thick BM and 25mm thick OGPC on 200 Bedded Hospital Gandhi Nagar Jammu. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50meter and lift upto 1.5m, as directed by Engineer-in-Charge in all kinds of soil. | 183 | Sqm | |
2 | 2 | Providing and laying 50mm thick (Compacted) avg. premix bituminous macadam base course with stone aggregate of quality, size and grading as specified in latest MORT&H specifications and straight run bitumen of VG-30 @ 3.5% by weight of total mix including Hot mixing of stone aggregates and bitumen in Hot Mix Plant, Transporting mixed material to the site & laying with paver finisher as per required profile, including cost of priming coat / tack coat and Bituminous Macadam in required level and grade, rolling with roller 8 to 10 tonne capacity to achieve the required compaction and density all complete including cost of bitumen and all sort of taxes including all leads, lifts, carriage complete. | 32 | Cum | |
3 | 3 | 2.5 cm premix carpet surfacing with 3 cum of stone chippings 10 mm nominal size per 100 sqm and bitumen emulsion (medium setting min.65% bitumen contents) complying with IS: 8887, using 96 kg per cum of chippings of road surface including consolidation with road roller etc. complete including seal coat, tack coat including cost of bitumen and all sort of taxes including all leads, lifts, carriage complete. | 5520 | Sqm | |
4 | 4 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. | |||
5 | 4.1 | Disposal of excavated earth / mulba for an avg. lead of 10 Kms. | 22 | Cum |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail