| 1 | 1 | SUPPLY | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | Carriage of material by road from departmental store to road site by truck including loading, unloading and safe stacking .(Distance 0-20 Km ) | BI01010001010000000000000515BI0100001112 | | |
|---|
| 3 | 3 | Supply of GI pipe. 125 mm dia (ISI Mark) Heavy duty. | BI01010001010000000000000515BI0100001115 | 216 | Mtr. |
|---|
| 4 | 4 | Supply of 110 mm HDPE pipe, PN6PE80 | BI01010001010000000000000515BI0100001115 | 2000 | Mtr. |
|---|
| 5 | 5 | Supply of LT Armoured 3.5x240 sqmm | BI01010001010000000000000515BI0100001123 | 2420 | Mtr. |
|---|
| 6 | 6 | Supply of Danger Board | BI01010001010000000000000515BI0100001113 | 29 | No. |
|---|
| 7 | 7 | Supply of holding Clamp with nut bolt for ST SP 55 Pole. | BI01010001010000000000000515BI0100001114 | 48 | No. |
|---|
| 8 | 8 | Supply of holding Clamp with nut bolt for ST SP 33 Pole. | BI01010001010000000000000515BI0100001115 | 10 | No. |
|---|
| 9 | 9 | Supply of PP & Clamp for ST SP-55 Pole. | BI01010001010000000000000515BI0100001120 | 48 | No. |
|---|
| 10 | 10 | Supply of PP & Clamp for ST SP-33 Pole. | BI01010001010000000000000515BI0100001122 | 10 | No. |
|---|
| 11 | 11 | Supply of Stay Clamp ST SP-55/33 Pole. | | 10 | No. |
|---|
| 12 | 12 | LT Insulator with N&B | | 58 | No. |
|---|
| 13 | 13 | LT Jointing Insulated sleeves. | | 125 | No. |
|---|
| 14 | 14 | LT Jointing Kit | | 60 | No. |
|---|
| 15 | 15 | LT T Connector Bus Bar. With Clamp. | | 60 | Set |
|---|
| 16 | 16 | Dead End Clamp with J-Hook | | 24 | No. |
|---|
| 17 | 17 | Suspension Clamp with J-Hook | | 58 | No. |
|---|
| 18 | 18 | 3 Phase Distribution Box | | 29 | No. |
|---|
| 19 | 19 | LT Pering Connector 3x120mm | | 116 | No. |
|---|
| 20 | 20 | LT Cable 1x16 sq.mm for energising the LT distribution box. | | 174 | Mtr. |
|---|
| 21 | 21 | Nut Bolt off Size | | 24 | Kg. |
|---|
| 22 | 22 | Providing of GI Pipe Clamps for Pipe. 4No. | | 240 | No. |
|---|
| 23 | 23 | LT Clamp for PCC/ST Pole | | 58 | No. |
|---|
| 24 | 24 | ERECTION | BI01010001010000000000000515BI0100001112 | | |
|---|
| 25 | 25 | SP-55 Pole | BI01010001010000000000000515BI0100001113 | 24 | No. |
|---|
| 26 | 26 | SP-33 Pole | BI01010001010000000000000515BI0100001113 | 5 | No. |
|---|
| 27 | 27 | Small Material | BI01010001010000000000000515BI0100001113 | 88 | Qtl. |
|---|
| 28 | 28 | Digging of Pit & Erection of Single Pole SP- 55 with fitting and Grouting complete for HT/LT Line. | BI01010001010000000000000515BI0100001113 | 24 | No. |
|---|
| 29 | 29 | Digging of Pit & Erection of Single Pole SP- 33 with fitting and Grouting complete for HT/LT Line. | BI01010001010000000000000515BI0100001113 | 5 | No. |
|---|
| 30 | 30 | Mounting & Fixing of T-off channel on Pole. | BI01010001010000000000000515BI0100001113 | 29 | No. |
|---|
| 31 | 31 | Erection of Stay Set complete. | BI01010001010000000000000515BI0100001113 | 10 | No. |
|---|
| 32 | 32 | Muffing of ST Pole complete. | BI01010001010000000000000515BI0100001113 | 29 | No. |
|---|
| 33 | 33 | Painting of ST Pole on newly erected Pole. | BI01010001010000000000000515BI0100001113 | 29 | No. |
|---|
| 34 | 34 | Fabrication of MS Angle/Channel | BI01010001010000000000000515BI0100001113 | 660 | Kg. |
|---|
| 35 | 35 | Earthing of pole by MS Earth Rod off size. | BI01010001010000000000000515BI0100001114 | 29 | No. |
|---|
| 36 | 36 | Fixing of GI pipe. | BI01010001010000000000000515BI0100001115 | 216 | Mtr. |
|---|
| 37 | 37 | Laying of LT Cable in 110mm HDPE Pipe at 900mm depth with open excavation method of earth & including laying in trench with fixing of 110mm HDPE pipe. | BI01010001010000000000000515BI0100001115 | 2000 | Mtr. |
|---|
| 38 | 38 | Making of road in original form before digging as per norms of PWD. | BI01010001010000000000000515BI0100001122 | 540 | per Sq. Mtr. |
|---|
| 39 | 39 | Interlocking tiles complete work | BI01010001010000000000000515BI0100001121 | 300 | R.Mtr. |
|---|
| 40 | 40 | Making of CC Road Complete work. | BI01010001010000000000000515BI0100001122 | 75 | R.Mtr. |
|---|
| 41 | 41 | Laying and erection of LT cable on pole with all supporting work. | BI01010001010000000000000515BI0100001121 | 220 | Mtr. |
|---|
| 42 | 42 | Dismentaling of LT overhead Line Double Circuit line & making of roll. | BI01010001010000000000000515BI0100001122 | 29 | Span |
|---|
| 43 | 43 | Disconnection & Reconnection of LT Service Cable of Consumers | BI01010001010000000000000515BI0100001123 | 80 | No. |
|---|
| 44 | 44 | Laying, Spreading, sagging of LT XLPE Cable 3x120+1x95 with LT Distribution Box as per RESPO. | BI01010001010000000000000515BI0100001125 | 7400 | Mtr. |
|---|
| 45 | 45 | Route Clerance by Cutting of Tree Branches | BI01010001010000000000000515BI0100001126 | 25 | Per Tree |
|---|
| 46 | 46 | Fixing of Danger Board with all Accessories | BI01010001010000000000000515BI0100001113 | 29 | No. |
|---|
| 47 | 47 | Fixing of holding Clamp with nut bolt for ST SP 55 Pole. | BI01010001010000000000000515BI0100001114 | 48 | No. |
|---|
| 48 | 48 | Fixing of holding Clamp with nut bolt for ST SP 33 Pole. | BI01010001010000000000000515BI0100001115 | 10 | No. |
|---|
| 49 | 49 | Fixing of PP & Clamp for ST SP-55 Pole. | BI01010001010000000000000515BI0100001120 | 48 | No. |
|---|
| 50 | 50 | Fixing of PP & Clamp for ST SP-33 Pole. | BI01010001010000000000000515BI0100001122 | 10 | No. |
|---|
| 51 | 51 | Fixing of Stay Clamp ST SP-55/33 Pole. | | 10 | No. |
|---|
| 52 | 52 | Fixing of LT Insulator with N&B | | 58 | No. |
|---|
| 53 | 53 | Fixing of LT Jointing Insulated sleeves. | | 125 | No. |
|---|
| 54 | 54 | Fixing of LT Jointing Kit | | 60 | No. |
|---|
| 55 | 55 | Fixing of LT T Connector Bus Bar. With Clamp. | | 60 | Set |
|---|
| 56 | 56 | Fixing of Dead End Clamp with J-Hook | | 24 | No. |
|---|
| 57 | 57 | Fixing of Suspension Clamp with J-Hook | | 58 | No. |
|---|
| 58 | 58 | Erection and fixing of 3 Phase Distribution Box in all respect | | 29 | No. |
|---|
| 59 | 59 | Fixing of LT Pering Connector 3x120mm | | 116 | No. |
|---|
| 60 | 60 | Laying of LT Cable 1x16 sq.mm for energising the LT distribution box. | | 174 | Mtr. |
|---|
| 61 | 61 | Fixing of GI Pipe Clamps for Pipe. 4No. | | 240 | No. |
|---|
| 62 | 62 | Fixing LT Clamp for PCC/ST Pole | | 58 | No. |
|---|