}

Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Silchar In The State Of Assam Under Bharatmala Pariyojana ., Assam-Assam

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Silchar In The State Of Assam Under Bharatmala Pariyojana .. Submission Date for this Tender is 21-12-2020. Detail Project Report Tenders in Assam Assam. Bidders can get complete Tender details and download the document.




Tender Notice

26112549
Corrigendum : Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Silchar In The State Of Assam Under Bharatmala Pariyojana .
Open Tender
Indian
Assam
Assam
21-12-2020

Tender Details

Consultancy Services For Preparation Of Inception Report And Detailed Project Report ( Dpr ) For Development Of Multi Modal Logistics Park At Silchar In The State Of Assam Under Bharatmala Pariyojana . , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader , Logistics Park Planner , Warehousing Expert , Freight Transport Planner , Financial Cum Market Analyst , Environment Cum Social Expert , Rail Engineer , Road Engineer , Hydrographic Expert , Sub-Professional Staff , Assistant Logistics Park Planner , Assistant Warehousing Expert , Assistant Freight Transport Planner , Assistant Financial Cum Market Analyst , Assistant Environment Cum Social Expert , Assistant Rail Engineer , Assistant Road Engineer , Assistant Hydrographic Expert , Cost Towards Preparation Of Inception Report For Mmlp At Silchar , Complete In All Aspects . , Cost Towards Dpr Preparation Of External Road Trunk Connectivity Infrastructure For The Mmlp , Complete In All Aspects ( Preparation Of Dpr For External Road / S Connectivity Complete In All Respect Including Incidental To The Work ) . , Cost Towards Dpr Preparation Of External Rail Trunk Connectivity Infrastructure For The Mmlp , Complete In All Aspects ( Preparation Of Dpr For External Rail Connectivity Complete In All Respect Including Incidental To The Work ) . , Cost Towards Dpr Preparation Of Inland Water Transport ( Iwt ) Terminal Complete In All Respect Including Incidental To The Work . , Other Overheads ( Fixed Cost ) , Overheads Such As Transportation Cost , Office Rent , Office Supplies , Communications , Furniture , Equipment , And Other Overheads Incidental To The Work . , Reports , Document Printing , 3D Model And Graphic Video , Inception Report Including Proposed Connectivity For External Trunk Infrastructure In A Set Containing 5 ( Five ) Hard Copies + 1 ( One Soft Copy ) , Trunk Infrastructure Gap Assessment With Draft Market Overview Report For Finalisation And Approval Of Suitable Site For Mmlp In A Set Containing 5 ( Five ) Hard Copies + 1 ( One Soft Copy ) , ( I ) Submission Of Alternatives For Concept Master Plan And Engineering Designs And Plans For The Selected Site And Detailed Master Plan Options For Mmlp With Preliminary Financial Case Assessment . ( Ii ) Submission Of All Statutory Documents For Clearances Related To Land Acquisition Such As 3A , 3A , 3D And 3G Notifications , Forest Clearance Stage 1 And Draft Environment Impact Assessment Report ( Eia ) Clearance , Social Impact Assessment ( Sia ) And Documents Related To Other Clearances Required . ( Iii ) Assessment Of Shifting Of Utilities Required And Providing Road And Rail Connectivity With Requisite Land Parcel ( Iv ) Draft Feasibility Report Of External Road And Rail Trunk Connectivity Infrastructure . All Submissions At ( I ) To ( Iv ) Above Shall Be In A Set Containing 5 ( Five ) Hard Copies + 1 ( One Soft Copy ) , Finalization Of Master Plan And Basic Architecture Design ( 2D And 3D ) And Plans After Due Consultation With Client And Relevant Stakeholders And Final Feasibility Report Of Mmlp And External Road And Rail Trunk Connectivity Infrastructure In A Set Containing 5 ( Five ) Hard Copies + 1 ( One ) Soft Copy . , ( I ) Draft Detailed Project Report For Mmlp Including Eia Report , Emp And Social Impact Assessment ( Sia ) Report Detailed Economic Analysis , Financial Feasibility And Project Structuring Aspects Etc . ( Ii ) Draft Detailed Project Report For External Rail And Road Connectivity Infrastructure . All Submissions At ( I ) & ( Ii ) Above Shall Be In A Set Containing 5 ( Five ) Hard Copies + 1 ( One ) Soft Copy . , ( I ) Final Detailed Project Report For Mmlp After Incorporating Comments And Observations Of Nhidcl And Other Competent Authorities Including Submission Of Bid Documents Including Draft Consession Agreement And Technical Schedule For Selection Of Developing Agency . Submission Of Physical 3D Model And Simulation Graphic Video With Voice Over . ( Ii ) Final Detailed Project Report For External Rail And Road Trunk Connectivity Infrastructure And Including Submission Of Bid Document Including Draft Ca And Ts For Selection Of Developing Agency . All Submissions At ( I ) & ( Ii ) Above Shall Be In A Set Containing 5 ( Five ) Hard Copies + 1 ( One ) Soft Copy . , ( I ) Obtaining Eia Clearance , Stage 1 Forest Clearance And Obtaining Other Final Statutory Clearances; ( Ii ) 3G Notification Related To Land Acquisition As Per La Act . ( Iii ) Obtaining Final Estimates For Utility Shifting And Requisite Utilities Required For Multi-Modal Logistics Park From The Concerned Agencies And Submission To Client . All Submissions At ( I ) & ( Iii ) Above Shall Be In A Set Containing 5 ( Five ) Hard Copies + 1 ( One ) Soft Copy . , 3D Model , Simulation Graphic Video With Voice Over , Survey And Investigation Related To Land Parcel Of Mmlp , Topograhical Survey ( Fixed Rate ) : Topograhic Survey Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc . Inclusive Of Cost Of Materials , Labourer . , Topograhical Survey ( Fixed Rate ) : Detailed Topograhic Survey Using Mobile / Aerial Lidar Or Equivalent Technology . , Gpr For Mapping Utilities , Other Engineering Investigation ( Fixed Cost )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Dec-2020 Reply to Pre Bid Queries Other 14-12-2020
2 14-Dec-2020 Amendment No. 2 Date 21-12-2020

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per Diem allowance) BI01010001010000000000000515BI0100001112
2 1.1 Team Leader BI01010001010000000000000515BI0100001113 4 Months
3 1.2 Logistics Park Planner\n BI01010001010000000000000515BI0100001114 4 Months
4 1.3 Warehousing Expert 4 Months
5 1.4 Freight Transport Planner 4 Months
6 1.5 Financial cum Market Analyst 4 Months
7 1.6 Environment cum Social Expert 4 Months
8 1.7 Rail Engineer 4 Months
9 1.8 Road Engineer 4 Months
10 1.9 Hydrographic Expert 4 Months
11 2 Sub-Professional Staff
12 2.1 Assistant Logistics Park Planner\n 6 Months
13 2.2 Assistant Warehousing Expert 6 Months
14 2.3 Assistant Freight Transport Planner 6 Months
15 2.4 Assistant Financial cum Market Analyst 6 Months
16 2.5 Assistant Environment cum Social Expert 6 Months
17 2.6 Assistant Rail Engineer 6 Months
18 2.7 Assistant Road Engineer 6 Months
19 2.8 Assistant Hydrographic Expert 6 Months
20 3 Cost towards preparation of Inception Report for MMLP at Silchar, complete in all aspects.\n 1 LumpSum
21 4 Cost towards DPR preparation of External Road Trunk Connectivity Infrastructure for the MMLP, Complete in all aspects (Preparation of DPR for external road/s connectivity complete in all respect including incidental to the work).\n 1 LumpSum
22 5 Cost towards DPR preparation of External Rail Trunk Connectivity Infrastructure for the MMLP, Complete in all aspects (Preparation of DPR for external rail connectivity complete in all respect including incidental to the work).\n 1 LumpSum
23 6 Cost towards DPR preparation of Inland Water Transport (IWT) Terminal complete in all respect including incidental to the work.\n 1 LumpSum
24 7 Other Overheads (Fixed Cost)
25 7.1 Overheads such as Transportation cost, office rent, office supplies, communications, furniture, equipment, and other overheads incidental to the work. 1 LumpSum
26 8 Reports, Document Printing, 3D Model and Graphic video
27 8.1 Inception Report including proposed connectivity for external trunk infrastructure in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)\n 1 Set
28 8.2 Trunk infrastructure gap assessment with draft market overview report for finalisation and approval of suitable site for MMLP in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy) 1 Set
29 8.3 (i) Submission of alternatives for concept Master plan and engineering designs and plans for the selected site and detailed Master plan options for MMLP with preliminary financial case assessment.\n(ii) Submission of all statutory documents for clearances related to Land Acquisition such as 3a, 3A, 3D and 3G notifications, forest clearance stage 1 and draft environment impact assessment report (EIA) clearance, Social Impact Assessment (SIA) and documents related to other clearances required.\n(iii) Assessment of shifting of utilities required and providing road and rail connectivity with requisite land parcel \n(iv) Draft Feasibility Report of External Road and Rail Trunk Connectivity Infrastructure.\nAll submissions at (i) to (iv) above shall be in a set containing 5 (Five) Hard Copies + 1 (One Soft Copy)\n 1 Set
30 8.4 Finalization of Master plan and Basic Architecture design (2D and 3D) and plans after due consultation with client and relevant stakeholders and Final Feasibility Report of MMLP and External Road and Rail Trunk Connectivity Infrastructure in a set containing 5 (five) Hard Copies + 1 (One) Soft Copy. \n\n 1 Set
31 8.5 (i) Draft Detailed Project Report for MMLP including EIA report, EMP and Social Impact Assessment (SIA) report detailed Economic Analysis, Financial Feasibility and Project Structuring aspects etc.\n(ii) Draft Detailed Project Report for External Rail and Road Connectivity Infrastructure.\nAll submissions at (i) & (ii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy. 1 Set
32 8.6 (i) Final Detailed Project Report for MMLP after incorporating comments and observations of NHIDCL and other Competent Authorities including submission of bid documents including draft Consession Agreement and technical schedule for selection of developing agency. Submission of physical 3D model and simulation graphic video with voice over.\n(ii) Final Detailed Project Report for External Rail and Road Trunk connectivity infrastructure and including submission of bid document including draft CA and TS for selection of developing agency.\nAll submissions at (i) & (ii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy. 1 Set
33 8.7 (i) Obtaining EIA clearance, Stage 1 Forest Clearance and obtaining other final statutory clearances;\n(ii) 3G notification related to land acquisition as per LA Act.\n(iii) Obtaining final estimates for Utility shifting and requisite utilities required for Multi-Modal Logistics Park from the concerned agencies and submission to client.\nAll submissions at (i) & (iii) above shall be in a set containing 5 (Five) Hard Copies + 1 (One) soft copy. 1 Set
34 8.8 3D model 1 Number
35 8.9 Simulation Graphic Video with voice over 1 Number
36 9 Survey and Investigation related to land parcel of MMLP Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
37 9.1 Topograhical Survey (Fixed Rate): Topograhic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. Inclusive of cost of materials, labourer. Surface defects detection and roughness measurement\nusing Network Survey Vehicle (80.638 kms x 8 times) 1 LumpSum
38 9.2 Topograhical Survey (Fixed Rate): Detailed topograhic survey using mobile/ aerial LiDAR or equivalent technology. Pavement strength measurement using FWD (80.638 kms x 4 times) 1 LumpSum
39 9.3 GPR for mapping utilities Bridge inspection using Mobile Bridge Inspection Unit (80.638 kms x 8 times) 1 LumpSum
40 9.4 Other Engineering Investigation (Fixed cost) Road signs inspection using Retro Reflectometer (80.638 kms x 8 times) 1 LumpSum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail