Defence Government Departments Closing in 0 days TDR #26106310

Repairs Rate Contract For Removal And Re-Fitment Of Main Engineering Equipment Including Main Engines, Diesel Alternators , Ac Plants And Gear Box Onboard In Ships

Issued by Government Departments · NAVAL SHIP REPAIR YARD, PORT BLAIR, Andaman And Nicobar Islands
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Dec 2020
0 days left
EMD
3.47 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
NAVAL SHIP REPAIR YARD, PORT BLAIR → Andaman And Nicobar Islands
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Repairs Rate Contract For Removal And Re-Fitment Of Main Engineering Equipment Including Main Engines, Diesel Alternators , Ac Plants And Gear Box Onboard In Ships-3 Degutting & Regutting Of Hp Air Compressor 4 Decouple Of Compressor Motor 5 Dgutting & Regutting Of Sysytem Pipe Lines 6 Degutting & Regutting Of Compressor Foundation 7 Degutting & Regutting Hp Air Compressor 8 Hp Air Compressor Shifting From Ship To Jetty And Jetty To Nsry 9 Loading And Unloading Assistance From Nsry To Jetty And Jetty To Ship 10 Foundation Fitment On Primary Foundation Onboard 11 Hp Air Compressor Fitment On Foundation 12 Degutting & Regutting Of Ac Compressor 13 Decouple Of Compressor Motor 14 Degutting & Regutting Of System Gas, Cooling Water Pipe Lines. 15 Degutting & Regutting Of Compressor Foundation 16 Degutting & Regutting Ac Compressor 17 Ac Compressor Shifting Ship To Jetty And Jetty To Nsry 18 Loading And Unloading Assistance From Nsry To Jetty And Jetty To Ship 19 Foundation Fitment On Primary Foundation Onboard 20 Ac Compressor Fitment On Foundation 21 Degutting & Regutting Of Dd Compressor & Engine 22 Degutting & Regutting Of Dd Compressor & Engine 23 Dd Hp Air Compressor Shifting From Ship To Jetty And Jetty To Nsry. 24 Loading And Unloading Assistance From Nsry To Jetty And Jetty To Ship 25 Degutting & Regutting Of Emergency Da 26 Decoupling Of Engine & Alternator 27 Alternator Foundation Nut & Bolts Removing 28 Removal Of Diesel Alternator 29 Shifting Of Alternator From Engine Room To Jetty ( Crane Assistance Will Be Provided By Yard ) 30 Removal Of Sv Mounts From Engine And Securing Engine On The Stand With Phosphate Ms Fasteners Of Appropriate Dimensions 31 Loading And Unloading Assistance To Be Provided To Ship For Trans-Shipment Ship To Jetty To Ship 32 Degutting & Regutting Of All Control Cables From Engines To Local Control Panel And From Engine Room To The Remote Control Panel In Mcr 33 Removal And Refitment Of Local Control Panels From Engine Room To The Jetty 34 Refitment Of Diesel Alternator 35 Renewal Of Fasteners And Nut & Bolts 36 Degutting & Regutting Of Hot Lagging ( Material Yard Supply ) 37 Degutting & Regutting Scillincer 38 Degutting & Regutting Of Gear Box 39 Degutting & Regutting Of Volkin Coupling 40 Making Arrangement For Positive Locking Of The Shafts Prior Decoupling From Gear Boxes. 41 Decoupling Of Gear Box From Shaft 42 Manufacturing Of The Stands For Gear Box 43 Removal & Refitment Of All Cables From Gear Box 44 Removing & Refitment Of Gear Box From The Foundation 45 Shifting Of Gear Box From Engine Room To Jetty. ( Crane Assistance Will Be Provided By Yard ) . 46 Loading Of Unloading Assistance To Be Provided To Ship For Trans-Shipment Of Engine 47 Refitment Of Gear Box To Shaft 48 Renewal Of Nut & Bolts, Packing Sets. 49 Degutting & Regutting Of System Pipe Lines 50 Degutting & Regutting Of Steering Gear 51 Degutting Of Steering System Hydraulic Pipe Lines On Rudder Compartment 52 Dismantling Of Hydraulic Motor Of Rudder 53 Degutting Of Steering Gear Pump & Motor 54 Dismantling Of Hand Pump 55 Loading And Unloading Assistance To Be Provided To Ship For Trans – Shipment Of These Equipment. 56 Refitment Of Steering System Hydraulic Pipe Lines On Rudder Compartment. 57 Refitment Of Hydraulic Motor Of Rudder 58 Refitment Of Pumps And Motor 59 Refitment Of Hand Pump 60 Renewal Of Fateners Nut & Bolts, Packing Sets. 61 Degutting & Regutting Of Propeller Shaft & Propeller , Yard Crafts 62 De Coupling Of Gear Box And Propeller Shaft Coupling 63 Removing Of Shaft Locking And Shaft Turning Attachment 64 Removal Of Propeller Lock Nut 65 Dropping Of Propeller, Shifting To Jetty And Handing Over To Ship Staff ( Crane Assistance Would Be Provided By The Yard ) 66 Dismantling Of Glands 67 Removal Of Coupling From Shaft 68 Dismantling Of Bulkhead Glands 69 Dismantling Of Plummer Block And Bearing 70 Eye Hooks Manufacturing And Welding On Under Water Hull 71 Withdrawal Of Shaft From The Ship And Shifting On Dock Space ( Crane Assistance Would Be Provided By The Yard ) 72 Loading And Unloading Assistance To Be Provided To Ship For Transport / Shipment Of Shaft Dry Dock To Jetty And Jetty To Nsry. 73 After Repairing The Shaft Loading And Unloading Assistance To Be Provided To Ship For Transport / Shipmentof Shaft From Nsry To Jetty And Jetty To Dry Dock 74 Refitment Of Propeller Shaft And Gland Rope & Gland Coupling 75 Refitment Of Proplar Shaft Coupling 76 Refitment Of Bulkhead Glands 77 Refitment Of Plummer Block Bearing And Shft Turning Attachment / Shaft Locking System On Shafts. 78 Refitment Of Propeller And Propeller Lock Nut 79 Degutting & Regutting Of Air Bottles 80 Degutting Of Delivery Pipe From Air Bottles 81 Removal Of Air Bottles From The Base. Shifting From Ship To Jetty 82 Refitment Of Air Bottles From The Base. Shifting From Jetty To Ship 83 Regutting Of Delivery Pipe From Air Bottle. 84 Degutting & Regutting Of Hydrophore Tank 85 Removal Of Hydrophore Tank Pipe Line 86 Removal Of Hydrophore Tank Pipe Line 87 Shifting Of Hydrophore Tank From Ship To Jetty And From Jetty To Ship ( Crane Assistance Would Be Provided By The Yard ) 88 Refitment Of Hydrophore Tank 89 Refitment Of Hydrophore Tank Pipeline 90 Renewal Of Fasteners, Nut & Bolts And Packing Sets 91 Degutting & Regutting Of Diesel Alternator 92 Decoupling Of Engine & Alternator 93 Degutting & Regutting Of Diesel Engine 94 Degutting & Regutting Of Alternator 95 Degutting & Regutting Of Engine & Alternator And Shifting From Engine Room To Jetty. ( Crane Assistance Will Be Provided By Yard ) 96 Removal & Refitment Of ‘ Sv Mounts From Engine Foundation 97 Loading And Unloading Assistance To Be Provided To Ship For Trans- Shipments Jetty To Nsry And Nsry To Jetty. 98 Re Fitment Of Diesel Alternator 99 Renewal Of Fasteners, Nut & Bolts & Packing Sets 100 Degutting & Regutting Of Rudder & Rudder Stock 101 Dismantling Of Sicanising Arm 102 Rudder Motor Seal Cover Removing 103 Steering Motor Top Cover Removing 104 Piston Lock Pin Removing 105 Tiller Lift For Degutting Of Piston 106 Degutting Of Piston From Tiller 107 Eye Hooks Manufacturing And Welding On Under Water Hull 108 Degutting & Regutting Of Rudder Shaft & Rudder Stock 109 Losing If Tiller Arm Nut For Removal Of Tiller Arm 110 Lifting And Removal Of Tiller Arm 111 Assembly Of Rudder Stock And Tiller Arm 112 Renewal Of Rudder Gland And Gland Cup Fitting. 113 Spares 114 Degutting & Regutting Of Hp Air Compressor 115 Degutting & Regutting Hp Air Compressor 116 Degutting & Regutting Of Ac Compressor 117 Degutting & Regutting Ac Compressor 118 Renewal Of Fasteners And Nut & Bolts 119 Degutting & Regutting Of Gear Box 120 Renewal Of Nut & Bolts, Packing Sets. 121 Degutting & Regutting Of Steering Gear 122 Renewal Of Fateners Nut & Bolts, Packing Sets. 123 Degutting & Regutting Of Propeller Shaft & Propeller , Yard Crafts 124 Eye Hooks Manufacturing And Welding On Under Water Hull 125 Degutting & Regutting Of Hydrophore Tank 126 Renewal Of Fasteners, Nut & Bolts And Packing Sets 127 Degutting & Regutting Of Diesel Alternator 128 Renewal Of Fasteners, Nut & Bolts & Packing Sets 129 Degutting & Regutting Of Rudder & Rudder Stock 130 Eye Hooks Manufacturing And Welding On Under Water Hull

BOQ

Name of Work: REPAIRS RATE CONTRACT FOR REMOVAL AND RE-FITMENT OF MAIN ENGINEERING EQUIPMENT INCLUDING MAIN ENGINES, DIESEL ALTERNATORS , AC PLANTS AND GEAR BOX ONBOARD IN SHIPS
Sl.No.Description of Service / SpareHSN/ SAC CodeQuantityUnits
10.1Note: Bidders are requested to quote GST in terms of % only. Example If GST is 18% fill 0.18 in the GST column
21SERVICES
31.01Degutting & Regutting of HP Air Compressor
41.02Decouple of compressor motor12Nos.
51.03Dgutting & regutting of sysytem pipe lines12Nos.
61.04Degutting & regutting of compressor foundation12Nos.
71.05Degutting & regutting HP air compressor12Nos.
81.06HP air compressor shifting from ship to jetty and jetty to NSRY12Nos.
91.07Loading and unloading assistance from NSRY to jetty and jetty to ship12Nos.
101.08Foundation fitment on primary foundation onboard12Nos.
111.09HP air compressor fitment on foundation12Nos.
121.1Degutting & Regutting of AC Compressor
131.11Decouple of compressor motor12Nos.
141.12Degutting & Regutting of system gas, cooling water pipe lines.12Nos.
151.13Degutting & Regutting of compressor foundation12Nos.
161.14Degutting & Regutting AC compressor12Nos.
171.15AC compressor shifting ship to jetty and jetty to NSRY12Nos.
181.16Loading and unloading assistance from NSRY to jetty and jetty to ship12Nos.
191.17Foundation fitment on primary foundation onboard12Nos.
201.18AC Compressor fitment on foundation12Nos.
211.19Degutting & Regutting of DD Compressor & Engine
221.2Degutting & regutting of DD Compressor & Engine12Nos.
231.21DD HP air compressor shifting from ship to jetty and jetty to NSRY.12Nos.
241.22Loading and unloading assistance from NSRY to jetty and jetty to ship12Nos.
251.23Degutting & Regutting of Emergency DA
261.24Decoupling of Engine & Alternator12Nos.
271.25Alternator foundation Nut & Bolts removing12Nos.
281.26Removal of Diesel Alternator12Nos.
291.27Shifting of Alternator from engine room to jetty (crane assistance will be provided by Yard)12Nos.
301.28Removal of SV Mounts from engine and securing engine on the stand with phosphate MS fasteners of appropriate dimensions12Nos.
311.29Loading and unloading assistance to be provided to ship for trans-shipment ship to jetty to ship12Nos.
321.3Degutting & regutting of all control cables from engines to local control panel and from engine room to the remote control panel in MCR12Nos.
331.31Removal and refitment of local control panels from engine room to the jetty12Nos.
341.32Refitment of diesel alternator12Nos.
351.33Renewal of fasteners and Nut & Bolts12Nos.
361.34Degutting & Regutting of Hot lagging (Material Yard supply)12Nos.
371.35Degutting & regutting Scillincer12Nos.
381.36Degutting & Regutting of Gear box
391.37Degutting & Regutting of volkin coupling12Nos.
401.38Making arrangement for positive locking of the shafts prior decoupling from gear boxes.12Nos.
411.39Decoupling of gear box from shaft12Nos.
421.4Manufacturing of the stands for gear box12Nos.
431.41Removal & refitment of all cables from gear box12Nos.
441.42Removing & refitment of gear box from the foundation12Nos.
451.43Shifting of gear box from engine room to jetty. (crane assistance will be provided by yard).12Nos.
461.44Loading of unloading assistance to be provided to ship for trans-shipment of engine12Nos.
471.45Refitment of gear box to shaft12Nos.
481.46Renewal of nut & bolts, packing sets.12Nos.
491.47Degutting & Regutting of system pipe lines12Nos.
501.48Degutting & Regutting of Steering Gear
511.49Degutting of steering system hydraulic pipe lines on rudder compartment12Nos.
521.5Dismantling of hydraulic motor of rudder12Nos.
531.51Degutting of steering gear pump & motor12Nos.
541.52Dismantling of hand pump12Nos.
551.53Loading and unloading assistance to be provided to ship for trans – shipment of these equipment.12Nos.
561.54Refitment of steering system hydraulic pipe lines on rudder compartment.12Nos.
571.55Refitment of hydraulic motor of rudder12Nos.
581.56Refitment of pumps and motor12Nos.
591.57Refitment of hand pump12Nos.
601.58Renewal of fateners nut & bolts, packing sets.12Nos.
611.59Degutting & Regutting of Propeller Shaft & Propeller ,Yard Crafts
621.6De coupling of gear box and propeller shaft coupling12Nos.
631.61Removing of shaft locking and shaft turning attachment12Nos.
641.62Removal of propeller lock nut12Nos.
651.63Dropping of propeller, shifting to jetty and handing over to ship staff (crane assistance would be provided by the yard)12Nos.
661.64Dismantling of glands12Nos.
671.65Removal of coupling from shaft12Nos.
681.66Dismantling of bulkhead glands12Nos.
691.67Dismantling of plummer block and bearing12Nos.
701.68Eye hooks manufacturing and welding on under water hull12Nos.
711.69Withdrawal of shaft from the ship and shifting on dock space (crane assistance would be provided by the yard)12Nos.
721.7Loading and unloading assistance to be provided to ship for transport / shipment of shaft dry dock to jetty and jetty to NSRY.12Nos.
731.71After repairing the shaft loading and unloading assistance to be provided to ship for transport / shipmentof shaft from NSRY to jetty and jetty to dry dock12Nos.
741.72Refitment of propeller shaft and gland rope & gland coupling12Nos.
751.73Refitment of proplar shaft coupling12Nos.
761.74Refitment of bulkhead glands12Nos.
771.75Refitment of plummer block bearing and shft turning attachment /shaft locking system on shafts.12Nos.
781.76Refitment of propeller and propeller lock nut12Nos.
791.77Degutting & Regutting of Air Bottles
801.78Degutting of delivery pipe from air bottles12Nos.
811.79Removal of air bottles from the base. shifting from ship to jetty12Nos.
821.8Refitment of air bottles from the base. Shifting from jetty to ship12Nos.
831.81Regutting of delivery pipe from air bottle.12Nos.
841.82Degutting & Regutting of Hydrophore Tank
851.83Removal of hydrophore tank pipe line12Nos.
861.84Removal of hydrophore tank pipe line12Nos.
871.85Shifting of hydrophore tank from ship to jetty and from jetty to ship (Crane assistance would be provided by the Yard)12Nos.
881.86Refitment of hydrophore tank12Nos.
891.87Refitment of hydrophore tank pipeline12Nos.
901.88Renewal of fasteners, nut & bolts and packing sets12Nos.
911.89Degutting & Regutting of Diesel Alternator
921.9Decoupling of Engine & Alternator12Nos.
931.91Degutting & regutting of Diesel Engine12Nos.
941.92Degutting & regutting of Alternator12Nos.
951.93Degutting & regutting of engine & alternator and shifting from engine room to jetty.(Crane assistance will be provided by Yard)12Nos.
961.94Removal & refitment of ‘ SV mounts from engine foundation12Nos.
971.95Loading and unloading assistance to be provided to ship for trans- shipments jetty to NSRY and NSRY to jetty.12Nos.
981.96Re fitment of diesel alternator12Nos.
991.97Renewal of fasteners, nut & bolts & packing sets12Nos.
1001.98Degutting & Regutting of Rudder & Rudder Stock
1011.99Dismantling of sicanising Arm12Nos.
1022Rudder motor seal cover removing12Nos.
1032.01Steering motor top cover removing12Nos.
1042.02Piston lock pin removing12Nos.
1052.03Tiller lift for degutting of piston12Nos.
1062.04Degutting of piston from tiller12Nos.
1072.05Eye hooks manufacturing and welding on under water hull12Nos.
1082.06Degutting & regutting of rudder shaft & rudder stock12Nos.
1092.07Losing if tiller arm nut for removal of tiller arm12Nos.
1102.08Lifting and removal of tiller arm12Nos.
1112.09Assembly of rudder stock and tiller arm12Nos.
1122.1Renewal of rudder gland and gland cup fitting.12Nos.
1133SPARES
1143.01Degutting & Regutting of HP Air Compressor
1153.02Degutting & regutting HP air compressor12Nos.
1163.03Degutting & Regutting of AC Compressor
1173.04Degutting & Regutting AC compressor12Nos.
1183.05Renewal of fasteners and Nut & Bolts12Nos.
1193.06Degutting & Regutting of Gear box
1203.07Renewal of nut & bolts, packing sets.12Nos.
1213.08Degutting & Regutting of Steering Gear
1223.09Renewal of fateners nut & bolts, packing sets.12Nos.
1233.1Degutting & Regutting of Propeller Shaft & Propeller ,Yard Crafts
1243.11Eye hooks manufacturing and welding on under water hull12Nos.
1253.12Degutting & Regutting of Hydrophore Tank
1263.13Renewal of fasteners, nut & bolts and packing sets12Nos.
1273.14Degutting & Regutting of Diesel Alternator
1283.15Renewal of fasteners, nut & bolts & packing sets12Nos.
1293.16Degutting & Regutting of Rudder & Rudder Stock
1303.17Eye hooks manufacturing and welding on under water hull12Nos.

AI Tender Summary

OUR REF NO 26106310
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-12-2020
Authority
Authority Name Integrated Defence Staff
Work Description Repairs Rate Contract For Removal And Re-Fitment Of Main Engineering Equipment Including Main Engines, Diesel Alternators , Ac Plants And Gear Box Onboard In Ships-3 Degutting & Regutting Of Hp Air Compressor 4 Decouple Of Compressor Motor 5 Dgutting & Regutting Of Sysytem Pipe Lines 6 Degutting & Regutting Of Compressor Foundation 7 Degutting & Regutting Hp Air Compressor 8 Hp Air Compressor Shifting From Ship To Jetty And Jetty To Nsry 9 Loading And Unloading Assistance From Nsry To Jetty And Jetty To Ship 10 Foundation Fitment On Primary Foundation Onboard 11 Hp Air Compressor Fitment On Foundation 12 Degutting & Regutting Of Ac Compressor 13 Decouple Of Compressor Motor 14 Degutting & Regutting Of System Gas, Cooling Water Pipe Lines. 15 Degutting & Regutting Of Compressor Foundation 16 Degutting & Regutting Ac Compressor 17 Ac Compressor Shifting Ship To Jetty And Jetty To Nsry 18 Loading And Unloading Assistance From Nsry To Jetty And Jetty To Ship 19 Foundation Fitment On Primary Foundation Onboard 20 Ac Compressor Fitment On Foundation 21 Degutting & Regutting Of Dd Compressor & Engine 22 Degutting & Regutting Of Dd Compressor & Engine 23 Dd Hp Air Compressor Shifting From Ship To Jetty And Jetty To Nsry. 24 Loading And Unloading Assistance From Nsry To Jetty And Jetty To Ship 25 Degutting & Regutting Of Emergency Da 26 Decoupling Of Engine & Alternator 27 Alternator Foundation Nut & Bolts Removing 28 Removal Of Diesel Alternator 29 Shifting Of Alternator From Engine Room To Jetty ( Crane Assistance Will Be Provided By Yard ) 30 Removal Of Sv Mounts From Engine And Securing Engine On The Stand With Phosphate Ms Fasteners Of Appropriate Dimensions 31 Loading And Unloading Assistance To Be Provided To Ship For Trans-Shipment Ship To Jetty To Ship 32 Degutting & Regutting Of All Control Cables From Engines To Local Control Panel And From Engine Room To The Remote Control Panel In Mcr 33 Removal And Refitment Of Local Control Panels From Engine Room To The Jetty 34 Refitment Of Diesel Alternator 35 Renewal Of Fasteners And Nut & Bolts 36 Degutting & Regutting Of Hot Lagging ( Material Yard Supply ) 37 Degutting & Regutting Scillincer 38 Degutting & Regutting Of Gear Box 39 Degutting & Regutting Of Volkin Coupling 40 Making Arrangement For Positive Locking Of The Shafts Prior Decoupling From Gear Boxes. 41 Decoupling Of Gear Box From Shaft 42 Manufacturing Of The Stands For Gear Box 43 Removal & Refitment Of All Cables From Gear Box 44 Removing & Refitment Of Gear Box From The Foundation 45 Shifting Of Gear Box From Engine Room To Jetty. ( Crane Assistance Will Be Provided By Yard ) . 46 Loading Of Unloading Assistance To Be Provided To Ship For Trans-Shipment Of Engine 47 Refitment Of Gear Box To Shaft 48 Renewal Of Nut & Bolts, Packing Sets. 49 Degutting & Regutting Of System Pipe Lines 50 Degutting & Regutting Of Steering Gear 51 Degutting Of Steering System Hydraulic Pipe Lines On Rudder Compartment 52 Dismantling Of Hydraulic Motor Of Rudder 53 Degutting Of Steering Gear Pump & Motor 54 Dismantling Of Hand Pump 55 Loading And Unloading Assistance To Be Provided To Ship For Trans – Shipment Of These Equipment. 56 Refitment Of Steering System Hydraulic Pipe Lines On Rudder Compartment. 57 Refitment Of Hydraulic Motor Of Rudder 58 Refitment Of Pumps And Motor 59 Refitment Of Hand Pump 60 Renewal Of Fateners Nut & Bolts, Packing Sets. 61 Degutting & Regutting Of Propeller Shaft & Propeller , Yard Crafts 62 De Coupling Of Gear Box And Propeller Shaft Coupling 63 Removing Of Shaft Locking And Shaft Turning Attachment 64 Removal Of Propeller Lock Nut 65 Dropping Of Propeller, Shifting To Jetty And Handing Over To Ship Staff ( Crane Assistance Would Be Provided By The Yard ) 66 Dismantling Of Glands 67 Removal Of Coupling From Shaft 68 Dismantling Of Bulkhead Glands 69 Dismantling Of Plummer Block And Bearing 70 Eye Hooks Manufacturing And Welding On Under Water Hull 71 Withdrawal Of Shaft From The Ship And Shifting On Dock Space ( Crane Assistance Would Be Provided By The Yard ) 72 Loading And Unloading Assistance To Be Provided To Ship For Transport / Shipment Of Shaft Dry Dock To Jetty And Jetty To Nsry. 73 After Repairing The Shaft Loading And Unloading Assistance To Be Provided To Ship For Transport / Shipmentof Shaft From Nsry To Jetty And Jetty To Dry Dock 74 Refitment Of Propeller Shaft And Gland Rope & Gland Coupling 75 Refitment Of Proplar Shaft Coupling 76 Refitment Of Bulkhead Glands 77 Refitment Of Plummer Block Bearing And Shft Turning Attachment / Shaft Locking System On Shafts. 78 Refitment Of Propeller And Propeller Lock Nut 79 Degutting & Regutting Of Air Bottles 80 Degutting Of Delivery Pipe From Air Bottles 81 Removal Of Air Bottles From The Base. Shifting From Ship To Jetty 82 Refitment Of Air Bottles From The Base. Shifting From Jetty To Ship 83 Regutting Of Delivery Pipe From Air Bottle. 84 Degutting & Regutting Of Hydrophore Tank 85 Removal Of Hydrophore Tank Pipe Line 86 Removal Of Hydrophore Tank Pipe Line 87 Shifting Of Hydrophore Tank From Ship To Jetty And From Jetty To Ship ( Crane Assistance Would Be Provided By The Yard ) 88 Refitment Of Hydrophore Tank 89 Refitment Of Hydrophore Tank Pipeline 90 Renewal Of Fasteners, Nut & Bolts And Packing Sets 91 Degutting & Regutting Of Diesel Alternator 92 Decoupling Of Engine & Alternator 93 Degutting & Regutting Of Diesel Engine 94 Degutting & Regutting Of Alternator 95 Degutting & Regutting Of Engine & Alternator And Shifting From Engine Room To Jetty. ( Crane Assistance Will Be Provided By Yard ) 96 Removal & Refitment Of ‘ Sv Mounts From Engine Foundation 97 Loading And Unloading Assistance To Be Provided To Ship For Trans- Shipments Jetty To Nsry And Nsry To Jetty. 98 Re Fitment Of Diesel Alternator 99 Renewal Of Fasteners, Nut & Bolts & Packing Sets 100 Degutting & Regutting Of Rudder & Rudder Stock 101 Dismantling Of Sicanising Arm 102 Rudder Motor Seal Cover Removing 103 Steering Motor Top Cover Removing 104 Piston Lock Pin Removing 105 Tiller Lift For Degutting Of Piston 106 Degutting Of Piston From Tiller 107 Eye Hooks Manufacturing And Welding On Under Water Hull 108 Degutting & Regutting Of Rudder Shaft & Rudder Stock 109 Losing If Tiller Arm Nut For Removal Of Tiller Arm 110 Lifting And Removal Of Tiller Arm 111 Assembly Of Rudder Stock And Tiller Arm 112 Renewal Of Rudder Gland And Gland Cup Fitting. 113 Spares 114 Degutting & Regutting Of Hp Air Compressor 115 Degutting & Regutting Hp Air Compressor 116 Degutting & Regutting Of Ac Compressor 117 Degutting & Regutting Ac Compressor 118 Renewal Of Fasteners And Nut & Bolts 119 Degutting & Regutting Of Gear Box 120 Renewal Of Nut & Bolts, Packing Sets. 121 Degutting & Regutting Of Steering Gear 122 Renewal Of Fateners Nut & Bolts, Packing Sets. 123 Degutting & Regutting Of Propeller Shaft & Propeller , Yard Crafts 124 Eye Hooks Manufacturing And Welding On Under Water Hull 125 Degutting & Regutting Of Hydrophore Tank 126 Renewal Of Fasteners, Nut & Bolts And Packing Sets 127 Degutting & Regutting Of Diesel Alternator 128 Renewal Of Fasteners, Nut & Bolts & Packing Sets 129 Degutting & Regutting Of Rudder & Rudder Stock 130 Eye Hooks Manufacturing And Welding On Under Water Hull
Basic Detail
Tender No NSRY/COM/112 (C) 2 (b)/RRC/CID-2031
Bidding Type Tender
Location
City NAVAL SHIP REPAIR YARD, PORT BLAIR
State Andaman And Nicobar Islands
Key Dates
Publish Date 26 Nov 2020
Submission Date 17 Dec 2020
Open Date 18 Dec 2020
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3.47 Lakhs
Exemption Not Available
Document List
Tendernotice_1.pdf
48E3F5FA-DAF6-4CAC-9058-E92EB3BF94C0.html
BOQ_629715.xls
RFP.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 26, 2020
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 17, 2020
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 18, 2020

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

html

48E3F5FA-DAF6-4CAC-9058-E92EB3BF94C0.html

xls

BOQ_629715.xls

pdf

RFP.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders