Under Water/Yearly Routine Of Hc-546 Under Water/Yearly Routine Of Harbour Craft-546
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Dec 2020
0 days left
EMD
27000
Bank guarantee accepted
Document Fee
100
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Auction
Location / State
CGDHQ-14 Port blair → Andaman And Nicobar Islands
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Under Water/Yearly Routine Of Hc-546 Under Water/Yearly Routine Of Harbour Craft-546
BOQ
| Name of Work: Under Water & Yearly Routines of Harbour Craft HC-546 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item No. | Quantity | Units | |
| 1 | 1 | HULL | |||
| 2 | 1.1 | HA-1001\nUNDER WATER ROUTINES- Craft pulled/slipped upon slipway for carrying out under water work package and making sure that bearing surfaces are adequately cushioned. | item 1 | 1 | repairs |
| 3 | 1.2 | HA-1002\nImmediately after docking, clean the marine growth with wooden scraper. Carry out cleaning with emery paper and fresh water hydro jet washing of complete under water appendages and rub with grade 120-150 emery papers and smoothen the surfaces. Clean with mild detergent in warm water and smoothen the surface and inspect for cracks and peeling off gel coat layer and FRP. Laminate and repair it if necessary. Clean all sea suction scoops and inspect for cracks. Overhaul and pressure testing of the underwater valves and cocks including painting of valves. Carry out joint inspection after cleaning of complete under water hull including propellers, shafts, Rudders and measure and record the clearance of stern & ‘A’ bracket bushes, Anodes and Rudder Jumping Collar by class/IRS Surveyor, firm representative, DHQ-14 staff and submit report for the necessary action. Change the Sacrificial anodes if necessary. Material yard supply. All in way jobs included. | item 2 | 1 | repairs |
| 4 | 1.3 | HA-1003\nSurface preparation and painting of entire under water hull (including boot top) and all under water appendages. Remove, clean, examine and paint all under water gratings (inlet and discharge tube) and area adjacent to them. Scope of work are as follows:-\n(I) Remove all existing coating, up to gel coat.\n(ii) Remove the gel coat layer with sandpaper with grit 120-150 micron dft.\n(iii) Apply gelshield 200, recommended thickness is 270 micron dft\n(iv) Apply antifouling as mentioned coating scheme “csj-5”.) Total\nArea 80 sq meters. Qty of paint-105 ltrs approx.\nNote: - Paint yard Supply. The CG approved scheme of any one of the three firm’s viz. M/s Akzo Noble, M/s Sigma (PPG) and M/s Jotun can be followed. Existing scheme M/s Akzo Noble. All paint to be applied in presence of paint rep and report to be submitted. | item 3 | 1 | repairs |
| 5 | 1.4 | Clean the bilges and thoroughly inspect the structure of Main Engine foundation (supports) for distortion, cracks and delamination. Check the foundation bolts of all auxiliary machineries if found deteriorated to be renewed as per sample. All under water bilge area to be painted on e final coat post examination and cleaning as per approved paint scheme. Total area 15.5 SQ Mtrs and Paint 05 Ltrs | item 4 | 1 | repairs |
| 6 | 1.5 | HA-1005\nSUPER STRUCTURE- Entire superstructure including area above water line to be painted as per approved paint scheme. Stickering works of CG emblem, Name of the craft and Ship’s Band on both ship’s side as per format using Navy blue colour after painting.\nSuper structure area Approx. 180 Sq mtrs. Paint and Materials Yard Supply. All in way jobs included. All painting removal/application jobs to be done under supervision of paint Rep. Qty of Paint – 28 Ltrs approx | item 5 | 1 | repairs |
| 7 | 1.6 | HA-1006\nMARINE TOILET-. (Make: - Jabsco)\n(a) Overhaul suction and discharge valves. (b) Overhaul hand pump. All flexible pipelines of sanitary system found deteriorated with securing clamp to be renewed as per sample | item 6 | 1 | repairs |
| 8 | 2 | ENGINEERING | |||
| 9 | 2.1 | EA-3001\nGEAR BOX(02 Nos)-(Make: Twin Disc , Model: MG 5082A, Ratio: 2.05:1)\nRetightening of all bolts connection accessible from all sides.\nCheck ahead/astern shift position.\nCheck the condition of zinc anode at inlet & outlet head of the heat exchanger. Replace if consume more than 50%. Material yard supply. All in way jobs included. | item 9 | 1 | repairs |
| 10 | 2.2 | EA-3002\nDIESEL ALTERNATOR- (Make: FISCHER PANDA; 12000NE PMS;12KVA/10.2Kw)\n(a) Check valve clearance and adjust if necessary. Renewal of all flexible hoses.\n(b) Replace radiator hoses and clamp bands.\n(c) Replace fuel hoses and clamp bands.\n(d) Change radiator coolant and Replace intake air line if necessary.\nMaterial yard supply. All in way jobs included. | item 10 | 1 | repairs |
| 11 | 2.3 | EA-3003\nMAJOR FIRE FIGHTING SYSTEM (FM-200)- (Make: M/s ZEAL Marketing Pvt. Ltd, Model: FM 200)\n(a) Calibrate all pressure devices & gauges and calibration certificate to be produced.\n(b) Blow out distribution piping and certificate to be produced.\n | item 11 | 1 | repairs |
| 12 | 2.4 | EA-3004\nF/W SYSTEM & HYDROPHORE PUMP- (Make: VETUS, Model: 4365501).\n(a) Overhaul motor and pump (Motor: 0.15 Kw, Pump: 1 TPH, Monoblock).\n(b) Renew PVC pipes (Dia: 1”, Length: 07 Mtr, Dia: 2”, Length: 02 Mtr).\n(c) Renew PVC cock valve-01 No, Stainless steel water tap- 03 Nos & Wash room water tap with hose-01 No\nMaterial yard supply. All in way jobs included.\n | item 12 | 1 | repairs |
| 13 | 2.5 | EA-3005\nS/W SYSTEM- (Make: M/s TDPL).\nFollowing sea water system pipelines to be chemically cleaned and pressure tested up to 5 Kg.\n(a) Main and auxiliary machineries- Length: 08 Mtrs, Dia: 3’’.\n(b) General sea water system- Length: 02 Mtrs, Dia: 3’’.\n | item 13 | 1 | repairs |
| 14 | 2.6 | EA-3006\nFUEL OIL TANKS (02 Nos)- (Make: M/s TDPL, Cap-400 Ltrs Each)\n(a) Empty the tank and ventilate for 24 hours.\n(b) Clean, inspect the tank and renew the manhole cover gasket.\n(c) Paint the tank externally using heat resistant brown paint.\nMaterial yard supply. All in way jobs included. | item 14 | 1 | repairs |
| 15 | 2.7 | EA-3007\nMOTOR DRIVEN FIRE PUMP- ( Make: M/s Flow Chem, Model: FPE SJ 40/110)\nOverhaul the motor and pump. | item 15 | 1 | repairs |
| 16 | 2.8 | EA-3008\nValves ( 14 Nos)-\nThe following valves to be overhaul and pressure tested up to 5 Kg.\n(a) M/E Sea chest valves (02 Nos ,SDNR, 80 MM)\n(b) M/E sea chest interconnecting valve (01 No, SDNR, 80 MM)\n(c) D/A Sea chest valve ( 01 No, Cock valve, 25 MM)\n(d) A/C sea chest valves ( 02 No, Cock valve, 25 MM)\n(e) Bilge sea chest valve( 01 No, SDNR, 40 MM)\n(f) Bilge system interconnecting valve (03 No, Ball valve, 40MM)\n(g) Emergency cooling valve for Stbd engine (03 No, Gate valve, 40MM)\n(h) Bilge pump overboard valve (01 No, SDNR, 40 MM)\nAll in way jobs included.\n | item 16 | 1 | repairs |
| 17 | 3 | ELECTRICAL | |||
| 18 | 3.1 | LA-5001\nMAIN SWITCH BOARDS (04 Nos)- ( Make: M/s TDPL, 230 V AC- 01 No & 24 V DC- 03 Nos)\nClean all contacts with CTC and overhaul the complete Main switch boards (general and navigational) including 03 Nos control panel of AC plants and renew all contactor kits irrespective of their condition and defective components. Full performance checks to be carried out post overhauling.\nCalibrate all meters and produce calibration certificate. Replace the same if found defective. . Material yard supply. All in way jobs included. | item 17 | 1 | repairs |
| 19 | 3.2 | LA-5002\nEXHAUST FANS (03 Nos)- { Make: Crompton Greaves, Model: CGFA23-3514-S3 -02 Nos, 0.75 Kw & CGFA23-2014-S1- 01 No, 1.0 Kw }\nOverhaul the motors and replace bearings. Material yard supply. All in way jobs included. | item 18 | 1 | repairs |
| 20 | 3.3 | LA-5003\nSEARCH LIGHT & FLOOD LIGHT ( 01 Each)- (Make: GO Light, Model: Go Stryker)\nOverhaul the complete system and prove the operation in all modes including combined operation from both remote panels. Renew the watertight rubber gaskets. Check & prove gear assemblies for Up-Down & for transverse movements. . Material yard supply. All in way jobs included. | item 19 | 1 | repairs |
| 21 | 3.4 | LA-5004\nWINDOW WIPER (03 Nos)- (Make: M/S Almighty auto ancillary Pvt. Ltd., Thane)\nOverhaul the window wiper motor and gear assembly. Replace the bearings. Replace the blade assembly and prove it for smooth operation after overhauling. . Material yard supply. All in way jobs included. | item 20 | 1 | repairs |
| 22 | 3.5 | FIRE DETECTION SYSTEM- (Make: Zeal marketing Pvt. Ltd., Mumbai) (a) Overhaul the main unit.\n(b) Calibrate all sensors and prove the system (Heat detector-03 Nos, Smoke detector-02 Nos. Manual call point-01 No, Hooter-02Nos).\n(c) To be produced calibration certificate.\n | item 21 | 1 | repairs |
| 23 | 3.6 | LB-5006\nSPEED LOG-(Make: Navico, Model: IS 20)\nOverhaul the complete system and full performance check is to be carried out post overhauling. | item 22 | 1 | repairs |
AI Tender Summary
Tender Timeline
Nov 26, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedDec 11, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 14, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender