74/2020-21 Works Related To Repairing Of Leakage Under Jen Section Sheoganj
Tender Value
10 Lakhs
Estimated cost
Bid Submission
01 Dec 2020
0 days left
EMD
20000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sheoganj → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
74/2020-21 Works Related To Repairing Of Leakage Under Jen Section Sheoganj
BOQ
| Name of Work: “Works related to repairing of leakage under JEN Section Sheoganj\" | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Operation and Maintenance (Based on Jodhpur Region II District Sirohi BSR 2020) | |||
| 2 | 2 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) | |||
| 3 | 3 | In all type Soil AC/PVC/HDPE pipe | |||
| 4 | 4 | 50/63/75mm | 1 | Each | |
| 5 | 5 | 80/90mm | 1 | Each | |
| 6 | 6 | 100/110mm | 1 | Each | |
| 7 | 7 | 125/140mm | 1 | Each | |
| 8 | 8 | 150/160/180mm | 1 | Each | |
| 9 | 9 | 200/225mm | 1 | Each | |
| 10 | 10 | 250/280mm | 1 | Each | |
| 11 | 11 | 300/315mm | 1 | Each | |
| 12 | 12 | 350mm | 1 | Each | |
| 13 | 13 | 400mm | 1 | Each | |
| 14 | 14 | 450mm | 1 | Each | |
| 15 | 15 | 500mm | 1 | Each | |
| 16 | 16 | Add on above item no. 1.1.1 for B.T. Road | 1 | Each | |
| 17 | 17 | Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 18 | 18 | Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. | 1 | Each | |
| 19 | 19 | Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. | 1 | Each | |
| 20 | 20 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) | |||
| 21 | 21 | In all type Soil | |||
| 22 | 22 | 80mm | 1 | Each | |
| 23 | 23 | 100mm | 1 | Each | |
| 24 | 24 | 125mm | 1 | Each | |
| 25 | 25 | 150mm | 1 | Each | |
| 26 | 26 | 200mm | 1 | Each | |
| 27 | 27 | 250mm | 1 | Each | |
| 28 | 28 | 300mm | 1 | Each | |
| 29 | 29 | 350mm | 1 | Each | |
| 30 | 30 | 400mm | 1 | Each | |
| 31 | 31 | 450 mm | 1 | Each | |
| 32 | 32 | 500 mm | 1 | Each | |
| 33 | 33 | 600mm | 1 | Each | |
| 34 | 34 | Add on above item no. 1.2.1 for B.T. Road | 1 | Each | |
| 35 | 35 | Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 36 | 36 | Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. | 1 | Each | |
| 37 | 37 | Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. | 1 | Each | |
| 38 | 38 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) | |||
| 39 | 39 | In all type Soil | |||
| 40 | 40 | 50/63/75mm | 1 | Each | |
| 41 | 41 | 80/90mm | 1 | Each | |
| 42 | 42 | 100/110mm | 1 | Each | |
| 43 | 43 | 125/140mm | 1 | Each | |
| 44 | 44 | 150/160/180mm | 1 | Each | |
| 45 | 45 | 200/225mm | 1 | Each | |
| 46 | 46 | 250/280mm | 1 | Each | |
| 47 | 47 | 300/315mm | 1 | Each | |
| 48 | 48 | 350mm | 1 | Each | |
| 49 | 49 | 400mm | 1 | Each | |
| 50 | 50 | 450 mm | 1 | Each | |
| 51 | 51 | 500 mm | 1 | Each | |
| 52 | 52 | 600 mm | 1 | Each | |
| 53 | 53 | Add on above item no. 1.3.1 for B.T. Road | 1 | Each | |
| 54 | 54 | Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 55 | 55 | Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. | 1 | Each | |
| 56 | 56 | Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. | 1 | Each | |
| 57 | 57 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. | |||
| 58 | 58 | In all type Soil | |||
| 59 | 59 | 75 mm | 1 | Each | |
| 60 | 60 | 90/80 mm | 1 | Each | |
| 61 | 61 | 110/100 mm | 1 | Each | |
| 62 | 62 | 140/125 mm | 1 | Each | |
| 63 | 63 | 180/160/150 mm | 1 | Each | |
| 64 | 64 | 225/200 mm | 1 | Each | |
| 65 | 65 | 250 mm | 1 | Each | |
| 66 | 66 | 300 mm | 1 | Each | |
| 67 | 67 | Add on above item no. 1.5.1 for B.T. Road | 1 | Each | |
| 68 | 68 | Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 69 | 69 | Add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. | 1 | Each | |
| 70 | 70 | Add on above item no. 1.5.1 if depth of pipe line is above 3.0 mtr. | 1 | Each | |
| 71 | 71 | Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. | |||
| 72 | 72 | In all type Soil | |||
| 73 | 73 | 80 mm | 1 | Each | |
| 74 | 74 | 100 mm | 1 | Each | |
| 75 | 75 | 125 mm | 1 | Each | |
| 76 | 76 | 150 mm | 1 | Each | |
| 77 | 77 | 225/200 mm | 1 | Each | |
| 78 | 78 | 250 mm | 1 | Each | |
| 79 | 79 | 300 mm | 1 | Each | |
| 80 | 80 | Add on above item no. 1.6.1 for B.T. Road | 1 | Each | |
| 81 | 81 | Add on above item no. 1.6.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 82 | 82 | Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. | 1 | Each | |
| 83 | 83 | Add on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr | 1 | Each | |
| 84 | 84 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). | |||
| 85 | 85 | In all type Soil | |||
| 86 | 86 | 80 mm to 110 mm | 1 | Each | |
| 87 | 87 | 125 mm to 165 mm | 1 | Each | |
| 88 | 88 | 200 mm to 300 mm | 1 | Each | |
| 89 | 89 | Add on above item no. 1.9.1 for B.T. Road | 1 | Each | |
| 90 | 90 | Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 91 | 91 | Add on above item no.1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr | 1 | Each | |
| 92 | 92 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). | |||
| 93 | 93 | In all type Soil | |||
| 94 | 94 | 80 mm to 100 mm | 1 | Each | |
| 95 | 95 | 125 mm to 150 mm | 1 | Each | |
| 96 | 96 | 200 mm to 300 mm | 1 | Each | |
| 97 | 97 | 350 mm to 450 mm | 1 | Each | |
| 98 | 98 | 500 mm to 600 mm | 1 | Each | |
| 99 | 99 | Add on above item no.1.10.1 for B.T. Road | 1 | Each | |
| 100 | 100 | Add on above item no.1.10.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 101 | 101 | Add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr | 1 | Each | |
| 102 | 102 | Labour charges for removal of complaint of polluted water supply to the consumers | |||
| 103 | 103 | Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours | 1 | Each survey (One Km distance of mains) | |
| 104 | 104 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size | |||
| 105 | 105 | In all type Soil | |||
| 106 | 106 | 50 to 75 mm | 1 | EACH | |
| 107 | 107 | 80-110 mm | 1 | EACH | |
| 108 | 108 | 125 to 165 mm | 1 | EACH | |
| 109 | 109 | 200 to 300 mm | 1 | EACH | |
| 110 | 110 | 350 to 400 mm | 1 | EACH | |
| 111 | 111 | Add on above item no.1.12.1 for B.T. Road | 1 | EACH | |
| 112 | 112 | Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | EACH | |
| 113 | 113 | Add on above item no. 1.12.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. | 1 | EACH | |
| 114 | 114 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size | |||
| 115 | 115 | In all type Soil | |||
| 116 | 116 | 80-100 mm | 1 | Each | |
| 117 | 117 | 125 to 150 mm | 1 | Each | |
| 118 | 118 | 200 to 300 mm | 1 | Each | |
| 119 | 119 | 350 to 450 mm | 1 | Each | |
| 120 | 120 | Add on above item 1.13.1 for B.T. Road | 1 | Each | |
| 121 | 121 | Add on above item no. 1.13.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only. | 1 | Each | |
| 122 | 122 | Add on above item no.1.13.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. | 1 | Each | |
| 123 | 123 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. | 1 | Sqm | |
| 124 | 124 | Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. | 1 | Sqm |
AI Tender Summary
Tender Timeline
Nov 26, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedDec 01, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 02, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender