Construction Of Cause Way U/S Of Sultanpur Aqueduct At Km 26 . 795 Of M . G . C . Stage -Ii ., Chandpur-Uttar Pradesh

Irrigation Department has published Construction Of Cause Way U/S Of Sultanpur Aqueduct At Km 26 . 795 Of M . G . C . Stage -Ii .. Submission Date for this Tender is 02-12-2020. Causeway Tenders in Chandpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26089120
Construction Of Cause Way U/S Of Sultanpur Aqueduct At Km 26 . 795 Of M . G . C . Stage -Ii .
Open Tender
Indian
Uttar Pradesh
Chandpur
02-12-2020

Tender Details

Construction Of Cause Way U/S Of Sultanpur Aqueduct At Km 26 . 795 Of M . G . C . Stage -Ii .

Key Value

Document Fees
INR 354 /-
EMD
INR 55000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Const.of couse way U/S of Sultanpur Aqueduct at km 26.795 of (M.G.C STAGE -II).
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in Excavtion in foundation/ Cutting in all types of soil including all lead lifts and back filling with all labour and T&P etc .required for proper completion of work. 750
2 2 Earth work in lip cutting in all types of soil including all lead lifts and back filling with all labour and T&P etc .required for proper completion of work. 480
3 3 P/L gravel i/c cost of all materials labours T&P etc. 38
4 4 Form work for c:c work i/c cost of all materials labours T&P etc. 247 m2
5 5 Centering and shuttering for R.C.C work including cost of all material labour and T&P etc. 215 m2
6 6 C. C ( M-15 ) 1:2:4 in foundation i/c cost of all materials labours T&P etc. 165
7 7 Steel reinforcement in R.C.C.work i /c all cost of materials, cutting ,bending ,binding, placing& labours , t&p etc complete. 8 MT
8 8 R.C.C M-20(1:1.5:3) i/c cost of all material labour and T&P etc required for proper completion of work. 125
9 9 P.C.C M-20(1:1.5:3) i/c cost of all material labour and T&P etc required for proper completion of work. 46
10 10 Supplying and filling Sealing compound including making and filling of groove joints in lining with bitumen (80/100), fine sand and asbestos powder including all cost of material, labour and T&P etc complete. 140 R.M.
11 11 Dewatering i/c all cost of T&P ,fuel, labour etc. requires for proper completion of work. 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail