Outsourcing Services For Operation Of Electric Supply Installations At Vayu Shakti Nagar Chiloda , Provisioning Of Skilled Electrician For Management Of Take Over Point , Main Receiving Station And Sub-Station No . 01 At Hq Swac Chiloda Comprising Of All Incoming And Outgoing 11 Kv Ht Electric Supply System And Lt Distribution System From Mrs And S/Stn No . 1 , 11 Kv 2/4 Pole Structure With Gods , Vcb Panels , Rmus , Step Down Transformers , Voltage Stabilizer , Change-Over Switches , Apfc Panel , Power Disturibution Board Etc . Installed At Different Locations Feeded From Mrs And S/Stn No . 1For Round The Clock ( 03 Shifts For 08 Hrs Each ) At Vayu Shakti Nagar Chiloda Complete All As Specified And Directed By Eng-In-Charge , Provisioning Of Skilled Electrician For Management Of E/S Sub-Station No . 02 And E/S Sub Stn At Centralised Ac Plant At Hq Swac Comprising Of All Incoming And Outgoing 11 Kv Ht Electric Supply System And Lt Distribution System From S/Stn No . 2 , 11 Kv 2/4 Pole Structure With Gods , Vcb Panel , Step Down Transformers , Voltage Stabilizer , Change-Over Switches , Apfc Panel , Power Disturibution Board Etc . Installed At Different Locations Near Swac Hq Pump House Feeded From Sub Stn No . 2 And E/S Sub Stn At Cent Ac Plant Hq Swac For Round The Clock ( 03 Shifts For 08 Hrs Each ) At Vayu Shakti Nagar Chiloda Complete All As Specified And Directed By Eng-In-Charge , Provisioning Of Skilled Electrician For Management Of E/S Sub-Station No . 03 , 04 And 05 At Stp , Type-Ii And Type-Iii Qtrs And Dsc/Nces Bldg Comprising Of All Incoming And Out Going Ht/ Lt Electric Supply , 11 Kv 2/4 Pole Structure With Gods , Vcb Panels , Step Down Transformers , Voltage Stabilizer , Change-Over Switches , Operating The Rmus , Apfc Panel , Power Disturibution Boards Feeded From Sub Stn No . 3 , 4 And 5 For Round The Clock ( 03 Shifts For 08 Hrs Each ) At Vayu Shakti Nagar Chiloda Complete All As Specified And Directed By Eng-In-Charge , All As Per Item No 3 . 00 Above , But For Management Of 11 Kv Electric Supply Installation At Mrs Incoming From Torrent Supply And E/S Sub-Stations No . 1 , 2 , 3 And 4 Of Map-Ii Pocket-1&2 At Vsn Chiloda For Three Shifts ( Each Shift Of 08 Hours ) Complete All As Specified And Directed By Eng-In-Charge , Provisioning Of Skilled Electrician For Management Of Security Lights Comprising Of Perimeter Security Lights And All The Street Lights Across The Campus Located Over The Area Of 88 Acres Of Vsn Including Power Distribution System To All Security And Street Lights , Control Panels , Manual On/Off , Timer Setting Of Light Panels And Maintaining The Condition Of All Control Panels Of Security Lights For Two Shifts Of 08 Hours Each Complete All As Specified And Directed By Eng-In-Charge , Rate Required To Be Quoted For Executing The Work As Described In Serial No . 1 . 00 To 5 . 00 Here-In-Before:- , Workers Wage ( Basic ) Per Person As Per Latest Mol&E Rates/ Existing Rules . , Employees Provident Fund As Mentioned In The Tender Documents ( Epf ) . , Employees State Insurance Contribution As Mentioned In The Tender Documents ( Esic ) . , Contribution Of Bounus As Mentioned In The Tender Documents . , Over Head & Profit On Serial No . 6 . 01 To 6 . 04 . , Lwc As Mentioned In The Tender Documents ( Labour Welfare Cess ) . , Gst As Mentioned In The Tender Documents . , Note For Sch `A Item No 6 . 01 . 00 To 6 . 07 Above:- , The Bidders Are Requested To Refer The Clause 28 . 00 To 41 . 00 Of Schedule A ( Boq ) Notes On Serial Page No 13 . 00 To 15 . 00 Of Tender Documents Before Quoting The Rates For Above Items . , Notes For Sch `A Item No 1 . 00 To 5 . 00 Above:- , The Bidders Are Requested To Refer The E-In-Cs Policy No 66546/Manual/M&O Tender/64/E8 Dated 20 Aug 2020 . Contractor Has To Submit The Valid Labour Licence From Labour Comissioner Within 15 Days Of Commencement Of Work . If The Contractor Fails To Submit The Same Within The Stipulated Period , The Contract Shall Be Liable To Be Cancelled And The Performance Security Of The Firm Shall Be Forfeited Accordingly . , ( I ) Electrician Hand Tools , Tester , Meggar , Test Lamp , Safety Shoes , Helmet And Hand Gloves , Instulation Tape , Cotton Waste And All Tools Do Rod , Spanner Set , Tool Kit , Tool Bag Etc . Hand Gloves Suitable For Working Pressure 11000 Volts And Tested Up To 22000 Volts And Pressure Guage Clamp Meter Will Be Provided By The Contractor Without Any Extra Cost . , ( Ii ) The Contractor Should Always Keep In Mind That It Is Only The Services Of These Contract Labours Is Outsourced & Not Manpower . So Providing Reliever Will Be Sole Responsibility Of Contractor . , ( Iii ) Dhpp For Running Of Dg Set Shall Be Issued By Department All As Directed By Engineer - In - Charge . , ( Iv ) Rates Quoted Shall Be Including Minor Repair As Per Daily Weekly Or Monthly Check . , ( V ) Electrcity As Required Shall Be Made Available To The Contractor Free Of Cost By Department . , ( Vi ) Contractor Shall Maintain The Shut Down Register And Log Books For Running Pump Sets As Per Format And All As Specified And Directed By Engineer In Charge . , ( Vii ) Cleaning Of Substation/Pump House Premises And Surrounding The Area Inside Fence/Compound Wall Complete All Responsibility Of Contractor . , ( Viii ) Emergency Light Will Be Provided By The Contractor During Night Hours Without Any Extra Cost . , ( Ix ) All Safety Precautions As Per Ie Rules Should Be Strictly Followed By Contracted Employees & Department Shall Not Be Held Responsible For Any Untowards Incident . , ( X ) Attendence Register Of Staff Employed Will Be Maintained By Je E/M . If Any Labour Found Absent , Necessary Penalty/Recovery Will Be Made By Engineer-In-Charge As Per Ca Clause . , ( Xi ) The Contractor Should Always Keep In Mind That It Is Only The Services Of These Contract Labours Is Outsourced & Not Manpower . So Providing Reliever Will Be Sole Responsibility Of Contractor . , ( Xii ) Qualification & Experience Certificate Of Contracted Labours Should Be Produced By Contractor . ( I ) Electrician ( Skilled ) Should Have Minimum Qualification Iti Or 4 Years Experiance . ( A ) One Electrician Per Shift For Three Shifts In A Day Shall Be Required To Maintain /Checking The Installations Etc All As Directed And Specified By Eng In Charge ( B ) The Electrician Personal Shall Be Provided With Protective Clothing & Shall Wear Them While Operating The Plant . In Case Of Any Accident /Injury , Fatal Or Partial Disability , The Cotractor Shall Be Solely Responsible For Setting All Claims/Compensation . Department Will Have A Right To Recover Any Sum Indicated /Claimed By Labour Commissioner/Court Directive . Ge Will However Ensure That Contractor Has Provided All Adequate & Required Means To The Workmen And Contractor Shall Get His Personnel Insured . , ( Xiii ) Contractor Has To Produce Photo Id Of The Staff Employed With Security Pass Number Issued By Main Guard Air Force Station . ( Xiv ) Staff Employed Will Be Given 2 Sets Of Uniform . ( Xv ) Gst / Epf Paid Certificate Should Be Enclosed With Rar . ( Xvi ) It Should Be Ensured By Contractor That Minimum Labour Charges Are Paid As Per The Minimum Fare Wages Act And Wages Register Duly Signed By Concerned Labour Will Be Produced Alongwith Rar By The Contractor . If Rates Quoted By The L1 Bidder Are Less Than Schedule Of Minimum Fare Wages , Then That Bidder Will Not Be Considered Bonafide And Action Will Be Taken As Per The Instructions Of Accepting Officer . ( Xvii ) The Payment To Every Staff Employed On Work Shall Be Made In The Aadhaar Linked Bank Account Through Account Payee Cheque Only .