}

Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal From Xi/Xii , Ix/X , Viii C , Viii B , Viii A And V/Vi/Vii ( Combined ) Seams At Ashakothi Patch , Phularitand Section Of Amalgamated Muraidih- Phularitand Colliery , Barora, CMC DEPARTMENT,BCCL HQ-Jharkhand

Bharat Coking Coal Limited-BCCL has published Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal From Xi/Xii , Ix/X , Viii C , Viii B , Viii A And V/Vi/Vii ( Combined ) Seams At Ashakothi Patch , Phularitand Section Of Amalgamated Muraidih- Phularitand Colliery , Barora. Submission Date for this Tender is 10-12-2020. Road Cargo Transport Tenders in CMC DEPARTMENT,BCCL HQ Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

26070949
Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal From Xi/Xii , Ix/X , Viii C , Viii B , Viii A And V/Vi/Vii ( Combined ) Seams At Ashakothi Patch , Phularitand Section Of Amalgamated Muraidih- Phularitand Colliery , Barora
Open Tender
Indian
Jharkhand
CMC DEPARTMENT,BCCL HQ
10-12-2020

Tender Details

Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal From Xi/Xii , Ix/X , Viii C , Viii B , Viii A And V/Vi/Vii ( Combined ) Seams At Ashakothi Patch , Phularitand Section Of Amalgamated Muraidih- Phularitand Colliery , Barora Area , Bccl . , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Area Surface/ In-Pit Ob Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading , And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Carriage Lead: ( 0-1 ) Km From Face To Surface/In-Pit Ob Dump . , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Areasurface/ In-Pit Ob Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading , And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Carriage Lead: ( 1-2 ) Km From Face Tosurface/ In-Pit Ob Dump . , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Area Surface/In-Pit Ob Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading , And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Carriage Lead: ( 2-3 ) Km From Face To Surface/ In-Pit Ob Dump . , Excavation In Benches ( In-Situ ) By Mechanical Means At Any Depth In All Kinds Of Soil , Rock , Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite / Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud And Slurry As Required , Loading , Transporting And Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Area Surface Ob Dump In Proper Manner Including Spreading , Dozing , Lighting , Water Sprinkling , Grading , And Other Ancillary Mining Activities Etc . All Complete As Per Instructions/Directions Of Engineer-In-Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost . ) Carriage Lead: ( 3-4 ) Km From Face To Surfaceob Dump . , Removal Of Dumped Loose Overburden By Mechanical Means In All Kinds Of Soil , Rock Including Mixed Soil , Mixed Hard Soil I . E . Clay Soils Mixed With Pebbles / Laterite/ Stone Boulders , Soft Or Hard Rock Etc . , Removal Of Slushy Earth , Mud & Slurry As Required , Loading , Transporting & Unloading The Excavated Materials Mechanically And Disposed Off Outside The Working Zone At Surface Ob Dump In Proper Manner On The Dumping Yard Including Spreading , Dozing , Lighting , Water Sprinkling , Grading & Other Ancillary Mining Activities Etc . , All Complete As Per Instructions/Directions Of Engineer- In Charge . The Job Involves Making Access Trench/Haul Roads , Dozing , Grading As Required For Excavation Operation And For Transportation Of Excavated Materials Etc . , All Complete . Carriage Lead: ( 1-2 ) Km From Face To Surface Ob Dump . , Winning / Extraction Of Coal In Benches From Available Coal Seams At Any Depth , Blasting ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost ) Including Mechanical Loading Of Coal Free From Extraneous Materials Into Tippers/ Dumpers , Water Sprinkling , Dozing , Lighting , Grading And Other Ancillary Mining Activities And Transportation Of Coal From Face To Surface Coal Dump No . 18/14E Etc . Complete Job As Per Instructions/Directions Of Engineer-In-Charge . The Above Job Also Involves Making And Maintenance Of Access Trench / Haul Road , Dozing , Grading And All Other Allied Jobs Required To Accomplish The Entire Operation Of Winning / Extraction And Transportation Of Coal . Carriage Lead: ( 2-3 ) Km From Face To Surface Coal Dump No . 18/14E . , Winning / Extraction Of Coal In Benches From Available Coal Seams At Any Depth , Blasting ( Blasting Shall Be Done By Department Free Of Cost , As And When Required . Supply Of Explosives , Detonators And Related Materials Will Be Made Available By Bccl And The Services Of Statutory Supervisory Personnel As Required For The Work Will Be Provided As And When Considered Necessary By The Management Free Of Cost ) Including Mechanical Loading Of Coal Free From Extraneous Materials Into Tippers/ Dumpers , Water Sprinkling , Dozing , Lighting , Grading And Other Ancillary Mining Activities And Transportation Of Coal From Face To Surface Coal Dump No . 18/ 14E Etc . Complete Job As Per Instructions/Directions Of Engineer-In-Charge . The Above Job Also Involves Making And Maintenance Of Access Trench / Haul Road , Dozing , Grading And All Other Allied Jobs Req

Key Value

Document Fees
Refer document
EMD
INR 5000000.0 /-
Tender Value
INR 534.03 Crore /-

BOQ Items

Name of Work:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface/ in-pit OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nCarriage Lead: (0-1) KM from face to surface/in-pit OB dump.\n ITEM 1 6.83e+06 Cum
2 1.1 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working areasurface/ in-pit OB dump in proper manner including spreading, dozing, lighting,water sprinkling, grading, and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nCarriage Lead: (1-2) KM from face tosurface/ in-pit OB dump.\n ITEM 2 1.3e+07 Cum
3 1.2 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface/in-pit OB dump in proper manner including spreading, dozing, lighting,water sprinkling, grading, and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\n\nCarriage Lead: (2-3) KM from face to surface/ In-pit OB dump.\n ITEM 3 9.6e+06 Cum
4 1.3 Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nCarriage Lead: (3-4) KM from face to surfaceOB dump.\n ITEM 4 2.7e+06 Cum
5 2 Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone at surface OB dump in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nCarriage Lead:(1-2) KM from face to Surface OB dump.\n ITEM 5 190000 Cum
6 3 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to surface coal dump no. 18/14E etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nCarriage Lead: (2-3) KM from face to surface coal dump no. 18/14E.\n ITEM 6 200000 MT
7 3.1 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to surface coal dump no. 18/ 14E etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nCarriage Lead: (3-4) KM from face to surface coal dump no. 18/ 14E.\n ITEM 7 500000 MT
8 3.2 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to Phularitand Feeder breakers etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportationof coal. \nCarriage Lead: (2-3) KM from face to Phularitand Feeder Breakers.\n ITEM 8 2.25e+06 MT
9 3.3 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to Phularitand Feeder breakers etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nCarriage Lead: (3-4) KM from face to Phularitand Feeder Breakers.\n ITEM 9 4.5e+06 MT
10 3.4 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to Phularitand Feeder breakers etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nCarriage Lead: (4-5) KM from face to Phularitand Feeder Breakers.\n ITEM 10 638000 MT
11 3.5 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to receiving hopper of Mahespur Rapid Loading System via proposed weigh bridge including weighment charges etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nCarriage Lead: (2-3) KM from face to receiving hopper of Mahespur Rapid Loading System via proposed weigh bridge.\n ITEM 11 300000 MT
12 3.6 Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to receiving hopper of Mahespur Rapid Loading System via proposed weigh bridge including weighment charges etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nCarriage Lead: (3-4) KM from face to receiving hopper of Mahespur Rapid Loading System via proposed weigh bridge.\n ITEM 12 1.1e+06 MT
13 3.7 Transportation of Coal from Phularitand Feeder Breaker chute to KKC (Link) siding at a lead slab (0-1)KM and loading of coal into wagon by payloader at siding including cost of all materials, labor and ancillary works etc. complete job as per instructions/directions of Engineer-in-charge. ITEM 13 4.35e+06 MT
14 3.8 .Transportation of Coal from Phularitand Feeder Breaker chute to receiving hopper of MCW(New) via weigh bridge at a lead slab (4-5)KM including weighment charges & including cost of all materials, labor and ancillary works etc. complete job as per instructions/directions of Engineer-in-charge. ITEM 14 3.038e+06 MT
15 4 Drilling in Coal and OB by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil or hard rock, coal etc. water sprinkling, dozing and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. ITEM 15 3.09393e+06 Mtr
16 5 Total impact of GST for the purpose of CTC ITEM 16 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail