Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Construction Of Protection Wall In Gandhinagar 110 Kv Ss Eedc Erode . ( Reach-Ii ) . Submission Date for this Tender is 08-12-2020. Wall construction Tenders in Gandhinagar 110 KV SS Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: Construction of protection wall in Gandhinagar 110 KV SS in EEDC, Erode. (REACH-II) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Clearing of juliflora jungle without uprooting using JCB machineries including lead lift and clearing away from the site. | item 1 | 4 | Hr |
2 | 2 | Earth work excavating and depositing on bank with initial lead of 10m and initial lifd of 2m in hard stiff clay. Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, as per standard specification, etc., complete. | item 2 | 28.35 | m3 |
3 | 3 | Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete. | item 3 | 12.15 | m3 |
4 | 4 | Plain cement concrete in CC 1:4:8, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | item 4 | 8.5 | m3 |
5 | 5 | Random rubble masonry in C.M.1:6 for foundation and basement including cost of all materials, lead, lifts, labour and curing charges etc., complete. | item 2 | 45.5 | m3 |
6 | 6 | Cement Solid Block in CM 1:5 using 15 cm cement Solid block for super structure and manhole including cost of all materials, labour charges, curing,scaffolding charges all leads and lifts etc., complete and as directed by Engineer. | item 3 | 22.5 | m3 |
7 | 7 | Wall Plastering with CM 1:5 12 mm thick for wall including cost of cement, labour, curing, all leads and lifts etc., complete as per standard specification.. | item 4 | 294 | m2 |
8 | 8 | Pointing with CM 1:3 for R.R. walls including cost of all materials, labour curing charges, all leads & lifts etc., complete. | item 13 | 80.5 | M2 |
9 | 9 | GST | item 44 | ||
10 | 9.01 | SGST For bidders within Tamilnadu | item 45 | 1 | percentage |
11 | 9.02 | CGST For Bidders within Tamilnadu | item 46 | 1 | percentage |
12 | 9.03 | IGST For Bidders outside of Tamilnadu | item 47 | 1 | percentage |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail