| 1 | 1 | Monthly Assured amount for lumpsum scope | BI01010001010000000000000515BI0100001113 | 24 | Month |
|---|
| 2 | 2 | Radiography of Welding Joint as per | BI01010001010000000000000515BI0100001114 | 30 | Per day |
|---|
| 3 | 3 | Dismantling & Lifting of LTSH Module | BI01010001010000000000000515BI0100001115 | 12 | NO |
|---|
| 4 | 4 | Dismantling & Lifting of Economiser | BI01010001010000000000000515BI0100001116 | 24 | NO |
|---|
| 5 | 5 | Stress Relieving as per Schedule | BI01010001010000000000000515BI0100001117 | 16 | Per day |
|---|
| 6 | 6 | Fins Fitting & Running Welding at new | BI01010001010000000000000515BI0100001118 | 400 | Meter |
|---|
| 7 | 7 | Rectification of Buck Stay at different | BI01010001010000000000000515BI0100001119 | 8 | NO |
|---|
| 8 | 8 | Welding of Economiser Tube (38.1X4 mm) | BI01010001010000000000000515BI0100001120 | 600 | NO |
|---|
| 9 | 9 | Welding of LTSH Tube (47.63X5 mm) | BI01010001010000000000000515BI0100001121 | 600 | NO |
|---|
| 10 | 10 | Welding of Water Wall Tube(63.5X5.6 and | BI01010001010000000000000515BI0100001122 | 100 | NO |
|---|
| 11 | 11 | Welding of Platen/FSH tube | BI01010001010000000000000515BI0100001123 | 100 | NO |
|---|
| 12 | 12 | Welding of Reheater Tube (63.5/57/54X4 | BI01010001010000000000000515BI0100001124 | 100 | NO |
|---|
| 13 | 13 | Repairing of Header by Build up | BI01010001010000000000000515BI0100001125 | 300 | Square Meter |
|---|
| 14 | 14 | High Pressure Welding of more than 63.5 | BI01010001010000000000000515BI0100001126 | 300 | NO |
|---|
| 15 | 15 | Fabrication of Different size bend | BI01010001010000000000000515BI0100001127 | 140 | NO |
|---|
| 16 | 16 | Boiler 2nd pass Water cleaning | BI01010001010000000000000515BI0100001128 | 16 | NO |
|---|
| 17 | 17 | Pent House cleaning | BI01010001010000000000000515BI0100001129 | 8 | NO |
|---|
| 18 | 18 | Replacement of HP valve size above 25 mm | BI01010001010000000000000515BI0100001130 | 20 | NO |
|---|
| 19 | 19 | Replacement of HP valve size above 50 mm | BI01010001010000000000000515BI0100001131 | 8 | NO |
|---|
| 20 | 20 | Replacement of HP valve size above 100 | BI01010001010000000000000515BI0100001132 | 2 | NO |
|---|
| 21 | 21 | Ex-BHEl Expert for safety valve | BI01010001010000000000000515BI0100001133 | 10 | Per day |
|---|
| 22 | 22 | Seat cutting expert along with seat | BI01010001010000000000000515BI0100001134 | 10 | Per day |
|---|
| 23 | 23 | De-insulation & Re-insulation of boiler | BI01010001010000000000000515BI0100001135 | 1200 | Square Meter |
|---|
| 24 | 24 | De-insulation and reinsulation of steam | BI01010001010000000000000515BI0100001136 | 600 | Square Meter |
|---|
| 25 | 25 | De-insulation and reinsulation of steam | BI01010001010000000000000515BI0100001137 | 600 | Square Meter |
|---|
| 26 | 26 | De-insulation & Re-insulation of valve | BI01010001010000000000000515BI0100001138 | 140 | NO |
|---|
| 27 | 27 | De-insulation & Re-insulation of valve | BI01010001010000000000000515BI0100001139 | 70 | NO |
|---|
| 28 | 28 | Removal and Re-application of refractory | BI01010001010000000000000515BI0100001140 | 14 | Ton |
|---|
| 29 | 29 | Ash cleaning work from boiler buckstay/ | BI01010001010000000000000515BI0100001141 | 60 | NO |
|---|
| 30 | 30 | Ash Cleaning works from PA Duct/FD Duct/ | BI01010001010000000000000515BI0100001142 | 80 | NO |
|---|
| 31 | 31 | High pr. Welding above 25 NB and upto 65 | BI01010001010000000000000515BI0100001143 | 120 | NO |
|---|
| 32 | 32 | High pr. Welding above 65 NB and upto 80 | BI01010001010000000000000515BI0100001144 | 40 | NO |
|---|
| 33 | 33 | High pr. Welding above 80 NB and upto | BI01010001010000000000000515BI0100001145 | 20 | NO |
|---|
| 34 | 34 | High pr. Welding above 100 NB and upto | BI01010001010000000000000515BI0100001146 | 20 | NO |
|---|
| 35 | 35 | High pr. Welding above 150 NB and upto | BI01010001010000000000000515BI0100001147 | 10 | NO |
|---|
| 36 | 36 | High pr. Welding above 200 NB and upto | BI01010001010000000000000515BI0100001148 | 10 | NO |
|---|
| 37 | 37 | High Pr. Valve replacement, upto 50 NB | BI01010001010000000000000515BI0100001149 | 40 | NO |
|---|
| 38 | 38 | High Pr. Valve replacement, 250 NB | BI01010001010000000000000515BI0100001150 | 6 | NO |
|---|
| 39 | 39 | Welding of turbine lub oil line upto | BI01010001010000000000000515BI0100001151 | 10 | NO |
|---|
| 40 | 40 | Welding of turbine lub oil line from 50 | BI01010001010000000000000515BI0100001152 | 10 | NO |
|---|
| 41 | 41 | Radiography of joint as per schedule | BI01010001010000000000000515BI0100001153 | 4 | Per day |
|---|
| 42 | 42 | Stress relieving as per schedule | BI01010001010000000000000515BI0100001154 | 4 | Per day |
|---|
| 43 | 43 | De-insulation and reinsulation of steam | BI01010001010000000000000515BI0100001155 | 500 | Square Meter |
|---|
| 44 | 44 | De-insulation and reinsulation of steam | BI01010001010000000000000515BI0100001156 | 560 | Square Meter |
|---|
| 45 | 45 | De-insulation & Re-insulation of valve | BI01010001010000000000000515BI0100001157 | 300 | NO |
|---|
| 46 | 46 | De-insulation & Re-insulation of valve | BI01010001010000000000000515BI0100001158 | 160 | NO |
|---|
| 47 | 47 | Boiler metal temp TC & mounting replace | BI01010001010000000000000515BI0100001159 | 20 | NO |
|---|
| 48 | 48 | Thermowell replace in high pr lines | BI01010001010000000000000515BI0100001160 | 20 | NO |
|---|
| 49 | 49 | Replace of High Pr. v/vabove 25 to 50 NB | BI01010001010000000000000515BI0100001161 | 40 | NO |
|---|
| 50 | 50 | Radiography of joint as per schedule | BI01010001010000000000000515BI0100001162 | 2 | Per day |
|---|
| 51 | 51 | Stress Relieving as per Schedule | BI01010001010000000000000515BI0100001163 | 2 | Per day |
|---|