Secunderabad Division - Proposed Third Line Between Kazipet- Vijayawada Stations Kazipet - Warangal Stations - Proposed Construction Of Earthwork In Formation, Cutting And Blanketing To The Standard Of Ge-14, Minor Bridges, Retaining Wall, Platform Walls,-Telangana

South Central Railway has published Secunderabad Division - Proposed Third Line Between Kazipet- Vijayawada Stations Kazipet - Warangal Stations - Proposed Construction Of Earthwork In Formation, Cutting And Blanketing To The Standard Of Ge-14, Minor Bridges, Retaining Wall, Platform Walls,. Submission Date for this Tender is 18-12-2020. Bridge Work Tenders in Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

26016768
Secunderabad Division - Proposed Third Line Between Kazipet- Vijayawada Stations Kazipet - Warangal Stations - Proposed Construction Of Earthwork In Formation, Cutting And Blanketing To The Standard Of Ge-14, Minor Bridges, Retaining Wall, Platform Walls,
Open Tender
Indian
Telangana
18-12-2020

Tender Details

Secunderabad Division - Proposed Third Line Between Kazipet- Vijayawada Stations Kazipet - Warangal Stations - Proposed Construction Of Earthwork In Formation, Cutting And Blanketing To The Standard Of Ge-14, Minor Bridges, Retaining Wall, Platform Walls, Bed Strengthening And Connected Miscellaneous Works Between Kazipet And Warangal Stations.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 47.66 Crore /-

BOQ Items

0 1 2 3 4 5 6 7 8
0 S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding\rUnit
1 Schedule A-IRUSSOR-2019 Items for Earth Work 68501765.95 Above/\rBelow/Par
2 1 011011 172500.00 cum 131.37 22661325.00 AT Par 22661325.00
3 Description:- Earthwork in cutting (classified) in formation, trolley refuges, side drains, level crossing approaches,\rplatforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat\rappearance to standard profile inclusive of all labour, machine & materials and removing & leading all cut spoils\reither to make spoil dumps beyond 10m from cutting edge or for filling in embankment with leads within 2 km on\reither side of cutting edge, lifts, ascent, descent, loading, unloading, all taxes / royalty, clearance of site and all\rincidental charges, bailing & pumping out water, if required, etc. complete as per directions of the Engineer-in-\rCharge. The work is to be executed as per latest / updated edition of "Guidelines for Earthwork in Railway\rProjects" issued by RDSO, Lucknow. Cut trees shall be property of Railways and to be deposited in the railway\rgodown unless specified otherwise in the Special Conditions of Contract. {Note - (i) All usable earth arising from\rcut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked (ii) All hard rock /and\rboulders not fit for filling will be stacked by the contractor and will be property of the Railways.} In all conditions\rand classifications of soil except rock
4 2 011012 1150.00 cum 291.03 334684.50 AT Par 334684.50
5 Description:- Earthwork in cutting (classified) in formation, trolley refuges, side drains, level crossing approaches,\rplatforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat\rappearance to standard profile inclusive of all labour, machine & materials and removing & leading all cut spoils\reither to make spoil dumps beyond 10m from cutting edge or for filling in embankment with leads within 2 km on\reither side of cutting edge, lifts, ascent, descent, loading, unloading, all taxes / royalty, clearance of site and all\rincidental charges, bailing & pumping out water, if required, etc. complete as per directions of the Engineer-in-\rCharge. The work is to be executed as per latest / updated edition of "Guidelines for Earthwork in Railway\rProjects" issued by RDSO, Lucknow. Cut trees shall be property of Railways and to be deposited in the railway\rgodown unless specified otherwise in the Special Conditions of Contract. {Note - (i) All usable earth arising from\rcut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked (ii) All hard rock /and\rboulders not fit for filling will be stacked by the contractor and will be property of the Railways.} Soft rock not\rrequiring blasting in all conditions
6 011013 1150.00 cum 468.81 539131.50 AT Par 539131.50
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail