Name of Work: Silt clearance along the Berthing side of Breakwater at Androth.
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Silt clearance from the berthing side of Beakwater by using floating grab dredger and dumping the dredged materials directly to the top of wharf excluding cost of hire charges of dredger with operator which will be provided by the department on free of hire charges, but including cost of all labour charges, anchoring charges, minor tools, cost of POL, watch and ward to dredger unit etc., complete.
BI01010001010000000000000515BI0100001113
1500
Cum
2
2
Transportation / shifting of dredging sea sand from wharf to sea shore line and filling the same to soil eroded area and leveling with required gradient etc., with in a lead of 2 km including cost of all labour charges for loading in to truck unloading, loading etc., hire charges of truck, minor tools etc., complete.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.