}

Miscellaneous Hot Insulation Works Inside Factory For A Period Of 1 Year, THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL-Kerala

Travancore Cochin Chemicals Limited has published Miscellaneous Hot Insulation Works Inside Factory For A Period Of 1 Year. Submission Date for this Tender is 07-12-2020. Insulation work Tenders in THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

25972918
Corrigendum : Miscellaneous Hot Insulation Works Inside Factory For A Period Of 1 Year
Open Tender
Indian
Kerala
THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL
07-12-2020

Tender Details

Miscellaneous Hot Insulation Works Inside Factory For A Period Of 1 Year

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 26-Nov-2020 Date Date 07-12-2020

Key Value

Document Fees
INR 107 /-
EMD
INR 21580.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Miscellaneous Hot Insulation work inside the factory for a period of 1 year.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Dismantling 22g carbon steel sheet cladding by unscrewing the fixed sheets without damages from all elevations and locations, fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete, BI01010001010000000000000515BI0100001113 375 Sq.m
2 2 Dismantling the 50mm/75mm thick hot insulation from the existing position to facilitate the carrying out the maintenance works from all elevations and locations fitted on pipe lines, vessels, tanks etc including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete., BI01010001010000000000000515BI0100001114 25 Sq.m
3 3 Dismantling 100/120mm thick hot insulation from the existing position at all elevations and locations fitted on pipe lines, vessels, tanks etc, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete BI01010001010000000000000515BI0100001115 50 Sq.m
4 4 Dismantling 150/200mm thick hot insulation from the existing position to facilitate the carrying out of the maintenance works at all elevations and locations fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete BI01010001010000000000000515BI0100001116 300 Sq.m
5 5 Fixing back 50mm/75mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost). BI01010001010000000000000515BI0100001117 25 Sq.m
6 6 Fixing back the 100/120mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost). BI01010001010000000000000515BI0100001118 50 Sq.m
7 7 Fixing back the 150/200mm thick insulation in position after the maitnenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding charges, all safety protection works to men and machineries etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost). BI01010001010000000000000515BI0100001119 300 Sq.m
8 8 Fixing back 22g carbon steel cladding by using new/ old screws to pipe lines, vessels and tanks at all elevations and locations, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required used/new carbon steel sheet will be issued by TCC at free of cost). BI01010001010000000000000515BI0100001120 375 Sq.m
9 9 Engaging Insulation Workers for executing miscellaneous works at all elevations and locations, including all labour charges, hire for tools, ESI, PF and all other benefits payable, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete BI01010001010000000000000515BI0100001121 30 Day
10 10 Providing 22g aluminium sheet cladding to process tanks, equipments, pipe lines as per standard practices and instructions at all elevations and locations upto 15M from finished floor level for all sizes, including cost of aluminium sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost, approved by TCC, all hire for hand cart/tempo van/lorry etc., complete BI01010001010000000000000515BI0100001122 20 Sq.m
11 11 Providing 22g carbon steel sheets hot galvanized with a zinc coat of approximate 0.275kg/m2 for new cladding as per standard practices and instructions at all locations and elevations to pipe lines, vessels, tanks etc, including cost of treated sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding charges, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete BI01010001010000000000000515BI0100001123 25 Sq.m
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail