| 1 | 1 | Annual Maintenance of Contract | | | |
|---|
| 2 | 1.01 | Annual Maintenance of 1.0 TR/1.5TR/2TR/2.5 TR Window /Split /Floor type Air Conditioner units comprising of periodical check, replacement of spares including labour charges , topping up of required refrigerant gas, cleaning of filters, servicing – Preventive Maintenance Four times in an year and breakdown services complete as required to make the unit functional. (Refer Terms and Conditions for details) | Job1.1 | 78 | Nos |
|---|
| 3 | 1.02 | Complete Gas charging of Windows/split/floor type AC including vacuuming, purging testing and commissioning etc. as required during the period of contract including all labour charges (1.0 TR) | Job1.2 | 1 | Nos |
|---|
| 4 | 1.03 | Complete Gas charging of Windows/split/floor type AC including vacuuming, purging testing and commissioning etc. as required during the period of contract including all labour charges (1.5 TR) | Job1.3 | 1 | Nos |
|---|
| 5 | 1.04 | Complete Gas charging of Windows/split/floor type AC including vacuuming, purging testing and commissioning etc. as required during the period of contract including all labour charges (2.0TR) | Job1.4 | 1 | Nos |
|---|
| 6 | 1.05 | Complete Gas charging of Windows/split/floor type AC including vacuuming, purging testing and commissioning etc. as required during the period of contract including all labour charges (2.5TR) | Job1.5 | 1 | Nos |
|---|
| 7 | 1.06 | Supply and fixing new rotary compressor unit suitable for following capacity window/split/floor AC Unit complete with connections including leak testing, gas charging etc. as required throughout the period of contract including all labour charges (incase of compressor replacement) Refer Technical Terms.(1.0 TR) | Job1.6 | 1 | Nos |
|---|
| 8 | 1.07 | Supply and fixing new rotary compressor unit suitable for following capacity window/split/floor AC Unit complete with connections including leak testing, gas charging etc. as required throughout the period of contract including all labour charges (incase of compressor replacement) Refer Technical Terms. (1.5 TR) | Job1.7 | 1 | Nos |
|---|
| 9 | 1.08 | Supply and fixing new rotary compressor unit suitable for following capacity window/split/floor AC Unit complete with connections including leak testing, gas charging etc. as required throughout the period of contract including all labour charges (incase of compressor replacement) Refer Technical Terms. (2.0 TR) | Job1.8 | 1 | Nos |
|---|
| 10 | 1.09 | Supply and fixing new rotary compressor unit suitable for following capacity window/split/floor AC Unit complete with connections including leak testing, gas charging etc. as required throughout the period of contract including all labour charges (incase of compressor replacement) Refer Technical Terms. (2.5 TR) | Job1.9 | 1 | Nos |
|---|
| 11 | 1.1 | Supply and fixing copper condenser unit (anti corrosive-blue fins/gold fins) suitable for following capacity split / floor AC units complete with connections including leak testing, gas charging etc as required through out the period of contract including all labour charges (incase of condensor replacement). (1.0 TR ) | Job1.10 | 1 | Nos |
|---|
| 12 | 1.11 | Supply and fixing copper condenser unit (anti corrosive-blue fins/gold fins) suitable for following capacity split / floor AC units complete with connections including leak testing, gas charging etc as required through out the period of contract including all labour charges (incase of condensor replacement). (1.5TR) | Job1.11 | 1 | Nos |
|---|
| 13 | 1.12 | Supply and fixing copper condenser unit (anti corrosive-blue fins/gold fins) suitable for following capacity split / floor AC units complete with connections including leak testing, gas charging etc as required through out the period of contract including all labour charges (incase of condensor replacement). (2.0TR) | Job1.12 | 1 | Nos |
|---|
| 14 | 1.13 | Supply and fixing copper condenser unit (anti corrosive-blue fins/gold fins) suitable for following capacity split / floor AC units complete with connections including leak testing, gas charging etc as required through out the period of contract including all labour charges (incase of condensor replacement). (2.5TR) | Job1.13 | 1 | Nos |
|---|