Haryana Urban Development Authority-HUDA has published Maintenance Of Master W S Scheme In U E Rewari Prov And Fixing 75 Kvar Apfc Panel And Power Cable Fully Automatic Cabling Connection Testing And Maintenance And Defect Liability One Year At Wtp Kalaka Rewari. Submission Date for this Tender is 19-11-2020. Electrification Work Tenders in Rewari Haryana. Bidders can get complete Tender details and download the document.
Name of work :- A/Mtc. of Master W/S Scheme in U/E Rewari. “Prov. and fixing 75 KVAR APFC panel and power fully authomatic, cabling, connection testing and maintenance and defect liability one year at W.T.P. Kalaka Rewari and all other works contingent thereto”. E/M Rs. 7400/- | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | A Cost of material \nMCCB (160 - 200 amp) L&T make.\n | BI01010001010000000000000515BI0100001113 | 1 | each |
2 | 2 | Spreader DNIT, DNZ 250 4 pole L&T make | BI01010001010000000000000515BI0100001114 | 2 | per set |
3 | 3 | Indication light 230 V. R,Y,B L&T make | BI01010001010000000000000515BI0100001115 | 3 | each |
4 | 4 | SP MCB 6 A L&T make | BI01010001010000000000000515BI0100001116 | 1 | each |
5 | 5 | APFC relay 8 step L&T make | BI01010001010000000000000515BI0100001117 | 1 | each |
6 | 6 | CT 100/5 AE make | BI01010001010000000000000515BI0100001118 | 1 | each |
7 | 7 | 3 phase LED volmeter L&T make | BI01010001010000000000000515BI0100001119 | 1 | each |
8 | 8 | 3 phase LED Ammeter L&T make | BI01010001010000000000000515BI0100001120 | 1 | each |
9 | 9 | ASS L&T make | BI01010001010000000000000515BI0100001121 | 1 | each |
10 | 10 | VSS L&T make | BI01010001010000000000000515BI0100001122 | 1 | each |
11 | 11 | 40A TP MCB L&T make | BI01010001010000000000000515BI0100001123 | 8 | each |
12 | 12 | Contactor MNX 32A L&T make | BI01010001010000000000000515BI0100001124 | 5 | each |
13 | 13 | A/M Selector switch L&T make | BI01010001010000000000000515BI0100001125 | 8 | each |
14 | 14 | ON Light L&T make | BI01010001010000000000000515BI0100001126 | 8 | each |
15 | 15 | 2 KVAR heavy duty cylindrical capacitor EPCOS make | BI01010001010000000000000515BI0100001127 | 1 | each |
16 | 16 | 3 KVAR heavy duty cylindrical capacitor EPCOS make | BI01010001010000000000000515BI0100001128 | 1 | each |
17 | 17 | 5 KVAR heavy duty cylindrical capacitor EPCOS make | BI01010001010000000000000515BI0100001129 | 1 | each |
18 | 18 | 10 KVAR heavy duty cylindrical capacitor EPCOS make | BI01010001010000000000000515BI0100001130 | 2 | each |
19 | 19 | 15 KVAR heavy duty cylindrical capacitor EPCOS make | BI01010001010000000000000515BI0100001131 | 3 | each |
20 | 20 | Contactor MNX 50A L&T make\n | BI01010001010000000000000515BI0100001132 | 3 | each |
21 | 21 | Panel box (800 x 975 x 400mm) | BI01010001010000000000000515BI0100001133 | 9.16 | per cubic ft |
22 | 22 | Main bus bar 100 amp | BI01010001010000000000000515BI0100001134 | 1 | each |
23 | 23 | Power wiring with thimble | BI01010001010000000000000515BI0100001135 | 1 | each |
24 | 24 | Control wiring with thimble | BI01010001010000000000000515BI0100001136 | 1 | each |
25 | 25 | Alluminium armoured cable 3.5 core HAVELLS make. | BI01010001010000000000000515BI0100001137 | 10 | per mtr |
26 | 26 | Cost of labour\nFixing of all above items i.e. wiring, power wiring connection and testing. | BI01010001010000000000000515BI0100001138 | 1 | per job |
27 | 27 | Transportation charges | BI01010001010000000000000515BI0100001139 | 1 | per job |
28 | 28 | Maintainence charges of APFC panel inlcuding replace damage materials and labour cost for one year to maintain the P.F. between 0.92 to 1.00 | BI01010001010000000000000515BI0100001140 | 12 | per month |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail