| 1 | 1.01 | De–Launching | | | |
|---|
| 2 | 1.02 | Beldar are required for De-launching of Pantoon Bridge in proper position and alignment. | | 1000 | day |
|---|
| 3 | 1.03 | Carpenter are required for De-launching of pantoon bridge in proper position and alignment. | | 58 | Day |
|---|
| 4 | 1.04 | Black Smith are required for 12 days for launching of pantoon bridge in proper position and alignment. | | 40 | Day |
|---|
| 5 | 1.05 | Tractor on hire for carriage of sleepers roadways , planks, wheel, guard pieces, R.S joists, pins, wire rope etc | | 432 | Hour |
|---|
| 6 | 1.06 | J.C,B on Hire for leveling material and carriage of material at pantoon bridge | | 296 | Hour |
|---|
| 7 | 1.07 | Crane (8 tonnes ) on hire charges for fixing of pontoon bridge | | 294 | Hour |
|---|
| 8 | 1.08 | Launching | | | |
|---|
| 9 | 1.09 | Beldar are required for De-launching of Pantoon Bridge in proper position and alignment. | | 1000 | day |
|---|
| 10 | 1.1 | Carpenter are required for De-launching of pantoon bridge in proper position and alignment. | | 58 | Day |
|---|
| 11 | 1.11 | Black Smith are required for 12 days for launching of pantoon bridge in proper position and alignment. | | 40 | Day |
|---|
| 12 | 1.12 | Tractor on hire for carriage of sleepers roadways , planks, wheel, guard pieces, R.S joists, pins, wire rope etc | | 432 | Hour |
|---|
| 13 | 1.13 | J.C,B on Hire for leveling material and carriage of material at pantoon bridge | | 296 | Hour |
|---|
| 14 | 1.14 | Crane (8 tonnes ) on hire charges for fixing of pontoon bridge | | 294 | Hour |
|---|
| 15 | 1.15 | Yearly Maintenance | | | |
|---|
| 16 | 1.16 | Filling cement bags with sand sewing and laying in position within\n30 ms in water including cost of E.C. bag & strings. (CSR 23.27) | | 4300 | Each |
|---|
| 17 | 1.17 | Sal wood wrought, panelled and fixed in position for decking (CSR 17.6) | | 14.44 | Cum |
|---|
| 18 | 1.18 | Supply of Iron Gullas and key L/S | | 433 | Each |
|---|
| 19 | 1.19 | Supply of Nuts and Bolts | | 113 | Per kg |
|---|
| 20 | 1.2 | Supply of washels size 3” x 5” complete in all respects | | 45 | per kg |
|---|
| 21 | 1.21 | Hiring of Boatman | | 244 | Day |
|---|
| 22 | 1.22 | Providing & laying Earth both sides of Pantoon Bridge | | 1271.89 | Per Cum |
|---|
| 23 | 1.23 | Construction of Granular Sub-Base by prodiding close graded material Grading-I, Spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clouse 401 of MORT&H Specifications. | | 165.38 | Per Cum |
|---|
| 24 | 1.24 | Repair of Pantoons | | 11 | Each |
|---|
| 25 | 1.25 | Repair of R.S Joist | | 30 | Each |
|---|
| 26 | 1.26 | Iron Clamps For Anchoring Of Wire Ropes Including Concreting 8' X 8' X 8' Size | | 2 | Each |
|---|
| 27 | 1.27 | Hirning of Chowkida | | 642 | Per Day |
|---|
| 28 | 1.28 | Maintenance of Approaches due to flood/heavy rain fall | | | |
|---|
| 29 | 1.29 | Tractor on hire for carriage of sleepers roadways , planks, wheel, guard pieces, R.S joists, pins, wire rope etc | | 145 | Per Hrs |
|---|
| 30 | 1.3 | J.C,B on Hire for leveling material and carriage of material at pantoon bridge | | 129 | Per Hrs |
|---|
| 31 | 1.31 | Credit of wooden sleeper removed from bridge being damaged | | 138.92 | Per Qt. |
|---|