Supply , Delivery , Installation , Testing And Commissioning Of Take Home Ration Production Units Along With Annual Maintenance Support In Identified Blocks Of Uttar Pradesh Supply , Delivery , Installation , Testing And Commissioning Of Take Ho
Tender Overview
Project Description
Supply , Delivery , Installation , Testing And Commissioning Of Take Home Ration Production Units Along With Annual Maintenance Support In Identified Blocks Of Uttar Pradesh Supply , Delivery , Installation , Testing And Commissioning Of Take Home Ration Production Units Along With Annual Maintenance Support In Identified Blocks Of Uttar Pradesh , Work Description , Cost Of Destoner , Cost Of Roaster , Cost Of Continuous Cooling Machine / Cabinet Or Chamber , Cost Of Storage Silos / Collection Bins , Automatic Weighing System With Hopper And Load Cells Panel , Cost Of Pulverizer / Hammer Mill With Blower , Cost Of Sifter , Cost Of Blender , Cost Of Bucket Elevators , Cost Of Conveyers , Cost Of Automatic Packaging Machine , Cost Of Main Electric Control , Any Other Components ( Any Other Component Needed For Effective Functioning Of The Set Up Should Be Specified Separately With Cost Element For Each Component ) , Transportation , Installation And Commissioning Of The Equipments , Training ( To Be Provided To Mill Staff Or Shg Member ) On Operation Of Each Equipments , Annual Maintenance Or Corrective Service Charges For A Period Of 1 Year ( Valid After The Completion Of 3 Years Amc Provided At The Time Of Procurement )
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Nov-2020 | CORRIGENDUM PRE-BID MEETING LINK | Other | 17-Dec-2020 |
BOQ
| Name of Work:Supply, Delivery, Installation, Testing & Commissioning of Take Home Ration Production Units Along with annual maintenance supportin identified Blocks of Uttar Pradesh | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Work Description | |||
| 2 | 1.01 | Cost of Destoner | 1 | Nos | |
| 3 | 1.02 | Cost of Roaster | 1 | Nos | |
| 4 | 1.03 | Cost of Continuous cooling machine / cabinet or chamber | 1 | Nos | |
| 5 | 1.04 | Cost of storage silos / collection bins | 1 | Nos | |
| 6 | 1.05 | Automatic weighing system with hopper and load cells panel | 1 | Nos | |
| 7 | 1.06 | Cost of Pulverizer / hammer mill with blower | 1 | Nos | |
| 8 | 1.08 | Cost of Sifter | 1 | Nos | |
| 9 | 1.09 | Cost of Blender | 1 | Nos | |
| 10 | 2 | Cost of Bucket Elevators | 1 | Nos | |
| 11 | 2.01 | Cost of Conveyers | 1 | Nos | |
| 12 | 2.02 | Cost of Automatic Packaging Machine | 1 | Nos | |
| 13 | 2.03 | Cost of Main Electric Control | 1 | Nos | |
| 14 | 2.04 | Any other components (any other component needed for effective functioning of the set up should be specified separately with cost element for each component) | 1 | Nos | |
| 15 | 2.05 | Transportation | 1 | Nos | |
| 16 | 2.06 | Installation and Commissioning of the equipments | 1 | Nos | |
| 17 | 2.07 | Training (to be provided to mill staff or SHG member) on operation of each equipments | 1 | Nos | |
| 18 | 2.08 | Annual maintenance or corrective service charges for a period of 1 year (valid after the completion of 3 years AMC provided at the time of procurement) | 1 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender