Mi Class Ii Improvements Of Irrigation Facilities To Velikkattu Ela And Construction Of Vcb Across Thottuvayal Thode In Thrikkaruva Grama Panchayath
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Nov 2020
0 days left
EMD
40200
Bank guarantee accepted
Document Fee
2625
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thrikkaruva → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Mi Class Ii Improvements Of Irrigation Facilities To Velikkattu Ela And Construction Of Vcb Across Thottuvayal Thode In Thrikkaruva Grama Panchayath
BOQ
| Work Name:MI Class II:-Improvements of irrigation facilities to Velikkattu ela and construction of VCB across Thottuvayal thode in Thrikkaruva Grama panchayath | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Detailed Estimate | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.01 | 15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) etc complete as per direction of Departmental Officers at site. | BI01010001010000000000000515BI0100001114 | 3.825 | cum |
| 3 | 1.02 | 60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001115 | 6 | metre |
| 4 | 1.03 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001116 | 78 | hour |
| 5 | 1.04 | 60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001117 | 18 | metre |
| 6 | 1.05 | 60.64.4 : Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001118 | 18 | metre |
| 7 | 1.06 | 60.2.7 : BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001119 | 18 | Day |
| 8 | 1.07 | 15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001120 | 5.25 | cum |
| 9 | 1.08 | 60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.etc complete as per direction of Departmental Officers at site. | BI01010001010000000000000515BI0100001121 | 19.25 | cum |
| 10 | 1.09 | 60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001122 | 13.86 | cum |
| 11 | 1.1 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001123 | 222.877 | cum |
| 12 | 1.11 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001124 | 102.54 | cum |
| 13 | 1.12 | 7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001125 | 52.9 | cum |
| 14 | 1.13 | 60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | BI01010001010000000000000515BI0100001126 | 7.05 | cum |
| 15 | 1.14 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001127 | 43.845 | sqm |
| 16 | 1.15 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001128 | 13.293 | cum |
| 17 | 1.16 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001129 | 6.552 | cum |
| 18 | 1.17 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001130 | 17.325 | cum |
| 19 | 1.18 | 4.3.3 : Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001131 | 29.4 | sqm |
| 20 | 1.19 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001132 | 1678.5 | kilogram |
| 21 | 1.2 | 4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001133 | 111.12 | sqm |
| 22 | 1.21 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001134 | 11.088 | cum |
| 23 | 1.22 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001135 | 6.02 | cum |
| 24 | 1.23 | 13.1.2 : 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand) etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001136 | 41.36 | sqm |
| 25 | 1.24 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001137 | 1.02 | cum |
| 26 | 1.25 | 10.2 : Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001138 | 692.1 | kg |
| 27 | 1.26 | 85.112 : Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350microns over the grit blasted and cleaned surface to class A standard of IS 14177 including cost of all materials , labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc complete as per the direction of departmental officer at site | BI01010001010000000000000515BI0100001139 | 16 | sqm |
| 28 | 1.27 | od13992/2020_2021/IA : Supply of 56 mm EN -8 screw rod for hoisting unit including cost of all materials, labour and conveyance etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001140 | 2.5 | metre |
| 29 | 1.28 | od13993/2020_2021/IA : 56 mm EN -8 screw rod for hoisting unit including cost of all materials, labour and conveyance (Levelling,shaping,Cutting to size and Threading) etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001141 | 2.5 | metre |
| 30 | 1.29 | 85.116 : Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001142 | 4.8 | metre |
| 31 | 1.3 | od13994/2020_2021/IA : Erection of the shutter [size 1.8 x1.5] in correct alignment at proper position safely in grooves using Crain etc. including hire charge of crane, labour etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001143 | 1 | each |
| 32 | 1.31 | od13995/2020_2021/IA : Supply and fixing of base plate, nut, thrust bearing, steering wheel etc including cost of all materials, conveyance and labour etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001144 | 1 | each |
| 33 | 1.32 | od13996/2020_2021/IA : Hire charges of temporary platform etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001145 | 10 | Day |
| 34 | 1.33 | od13997/2020_2021/IA : Trials run the shutter including greasing, lubricating including cost of all materials, conveyance, labour etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001146 | 1 | each |
| 35 | 1.34 | 13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001147 | 1.76 | sqm |
| 36 | 1.35 | 10.20 : Providing and fixing bolts including nuts and washers etc complete as per direction of Departmental Officers at site | BI01010001010000000000000515BI0100001148 | 10 | kg |
AI Tender Summary
Tender Timeline
Nov 04, 2020
11:30 IST
Tender Published
Tender notice published.
CompletedNov 13, 2020
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 18, 2020
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender