Construction Of Shed At Amtal Braham Tola Kali Mandir ( 2 ) Pcc Road From Kali Mandir Huchukdih Going Road ( 3 ) Pcc Road At Pradhankhanta Barwadih Toal ( 4 ) Pcc Road From Durga Mandir Huchuktand Going Road . Construction Of Shed At Amtal Braham T
Tender Overview
Project Description
Construction Of Shed At Amtal Braham Tola Kali Mandir ( 2 ) Pcc Road From Kali Mandir Huchukdih Going Road ( 3 ) Pcc Road At Pradhankhanta Barwadih Toal ( 4 ) Pcc Road From Durga Mandir Huchuktand Going Road . Construction Of Shed At Amtal Braham Tola Kali Mandir ( 2 ) Pcc Road From Kali Mandir Huchuktand Going Road ( 3 ) Pcc Road At Pradhankhanta Barwadih Toal ( 4 ) Pcc Road From Durga Mandir Huchukdih Going Road .
BOQ
| Name of Work: Construction of Shed at Amtal Braham tola Kali Mandir (2) PCC road from Kali Mandir Huchukdih going road (3) PCC road at Pradhankhanta Barwadih toal (4) PCC road from Durga Mandir Huchukdih going road under Baliapur Block. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | (1) Shed at Brahman tola Kali Mandir\nLabour for site clearance and bush cutting all complete job as per specification and direction of E/I all complete job. | 5 | Each | |
| 2 | 2 | Earth work excavation in foundation tranches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. Extra for earth work in hard soil as per specification and direction of E/I. (Vide classification of soil item B) 5.1.1+5.1.2 | 11.09 | /M3 | |
| 3 | 3 | Filling in fundation trenches and plinth in layers not exceeding 150mm thick well watered, reammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift of 1.5m all competed as per building specification and direction of E/I. (5.1.7)\nFoundation 1/3 of item No. 2 | 21.85 | /M3 | |
| 4 | 4 | Providing coarse clean sand filing in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) (5.1.10) | 9.01 | /M3 | |
| 5 | 5 | Providing designation 75B one brick flat soling joints with local sand including cost of watering taxes, royalty all complete as per specification and direction of E/I. 5.6.3 | 70.28 | /M2 | |
| 6 | 6 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | 7.29 | /M3 | |
| 7 | 7 | Providing PCC M-150 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating striking, curing, taxes and royalty all complete jon as per building specification and direction of E/I. (5.3.5) | 4.3 | /M3 | |
| 8 | 8 | Providing Tor steel reinforcement as per approved design and drawing excluding carraige of bars to work site, cutting, bending, and binding with annealeed wire with cost of rust, placing the rods in position all complete as per building specification and direction of E/I. (5.5.5+5.5.4) | 0.66 | /MT | |
| 9 | 9 | Structural steel work reveted bolted or welded in built up sections trusses and formed work including cutting hosting fixing in position and applying a primary cost of approved steel primer all complete job. (10.16.1) | 663.66 | /M2 | |
| 10 | 10 | Providing and fixing mild steel round holding down bolt with nut and washer plates complete job. (10.19DSR) | 88.26 | /Kg | |
| 11 | 11 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed all complete job. (12.1.3) | 65.33 | /M3 | |
| 12 | 12 | Providing 75B work in CM(1:6) in foundation and Plinth with approved quality of clean coarse sand of F.M 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per specification and direction of E/I all complete job. (5.2.6) | 5.08 | /M3 | |
| 13 | 13 | Provding dges on helps of ridth 60 cm over width plased GCI sheet fixed with Polymen coated J and L holder Bolts and nuts 8mm GCI Sheet | 9.75 | /M | |
| 14 | 14 | Providing 12mm thick cement plaster (1:6) with clean coarse sand of FM 1.5 including screening, curing with all leads and lifts of water scaffolding taxes and royalty as per building specification and direction of E/I. (5.7.3) | 28.62 | /M2 | |
| 15 | 15 | Providing and laying Vitrified Floor Tiles in different in walls over 12mm size (thickness to be specified by the manufacturer with wather absorption less than 0.08% and conforming to IS : 15622 of approved make in all coour and shade, lad on 20mm thick cement mortar (1:3) jointing with grey cement slurry @ 3.3 Kg/sqm including grouting the joints with white cement and mathing pigment etc. (5.6.23) | 55.82 | /M2 | |
| 16 | 16 | Carriage of Materials\nSand (Lead 15 KM) | 15.02 | /M3 | |
| 17 | 17 | Brick (Av. Lead 8 KM) | 2.503 | ‰ | |
| 18 | 18 | Stone chips (Lead 25 KM) | 10.43 | /M3 | |
| 19 | 19 | Cement + Rod (Av. Lead 8 KM) | 5.72 | ‰ | |
| 20 | 20 | (2) PCC Road at Lal Bandh Huchuktand Kali Mandir going road\nLabour for clearing the surface all complete job as per specification and direction of E/I all complete job. | 10 | /MD | |
| 21 | 21 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | 10.28 | /M3 | |
| 22 | 22 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | 2.05 | /M3 | |
| 23 | 23 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | 10.62 | /M3 | |
| 24 | 24 | Earth work filing in flanks in road fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | 5 | Each | |
| 25 | 25 | Carriage of Materials\nStone Metal (Lead 25 KM) | 12.2 | /M3 | |
| 26 | 26 | Sand (Lead 30 KM) | 6.59 | /M3 | |
| 27 | 27 | Stone Chips( Lead 25 KM) | 9.55 | /M3 | |
| 28 | 28 | Gaurdwall\nEarth work in excavation in foundation tranches in ordinary soil (vide clasification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lits, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I. Extra for earth work in hard soil as per specification and direction of E/I. (Vide classification of soil item B) (5.1.1+ 5.1.2) | 35.375 | /M3 | |
| 29 | 29 | Providing coarse clean sand filing in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurment compacted volume) (5.1.10) | 1.77 | /M3 | |
| 30 | 30 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | 5.305 | /M3 | |
| 31 | 31 | Providing Random Rubble Stone Masonary in CM (1:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.2.28) | 12.38 | /M3 | |
| 32 | 32 | Providing Random Rubble Stone Masonary in CM (1:4) in Superstructure with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.2.31) | 18.305 | /M3 | |
| 33 | 33 | Providing PCC M-150 with nominal mix of (1:2:4) in top of gaurd wall in various component with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.19) | 0.265 | /M3 | |
| 34 | 34 | Providing Tuck pointing in S/M (1:3) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lift of water scaffolding taxes and royalty all complete as per building specification and direction of E/I. (5.7.10) | 34.885 | M2 | |
| 35 | 35 | Earth work filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, reamed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift of 1.5m all competed as per building specification and direction of E/I. (5.1.8) | 23.58 | /M3 | |
| 36 | 36 | Providing Weep Hole all complete as per building specification and direction of E/I. | 5 | Each | |
| 37 | 37 | Carriage of Materials\nSand (Lead 30 KM) | 17.675 | /M3 | |
| 38 | 38 | Stone chips(Lead 28 KM) | 0.24 | /M3 | |
| 39 | 39 | Stone Metal (Lead 25 KM) | 4.985 | /M3 | |
| 40 | 40 | Stone Boulder (Lead 25 KM) | 30.685 | /M3 | |
| 41 | 41 | Cement (Lead 5 KM) | 6.185 | /MT | |
| 42 | 42 | (3) PCC Road at Pradhankhanta Barwadih tola\nLabour for clearing the surface all complete job as per specification and direction of E/I all complete job. | 20 | /MD | |
| 43 | 43 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | 20.56 | /M3 | |
| 44 | 44 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | 4.1 | /M3 | |
| 45 | 45 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | 21.24 | /M3 | |
| 46 | 46 | Earth work filing in flanks in road fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | 10 | Each | |
| 47 | 47 | Carriage of Materials\nStone Metal (Lead 25 KM) | 24.4 | /M3 | |
| 48 | 48 | Sand (Lead 30 KM) | 13.18 | /M3 | |
| 49 | 49 | Stone Chips( Lead 25 KM) | 19.1 | /M3 | |
| 50 | 50 | (2) PCC Road at Lal Bandh Huchuktand Durga Mandir going road\nLabour for clearing the surface all complete job as per specification and direction of E/I all complete job. | 20 | /MD | |
| 51 | 51 | Supplying and laying good quality of Stone Metal Packing filter (20mm to 63mm size) in the rock toe, heel trenches, toe drain as per design and drawing including the cost of material, royalty all taxes etc but excluding the cost of carriage all complete job as per specification and direction of E/I all complete job. (8.6.3) | 20.56 | /M3 | |
| 52 | 52 | Providing PCC M-100 with nominal mix of (1:3:6) in Foundation with approved quality of stone metal grade-III (50mm to 25mm size) clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.3) | 4.1 | /M3 | |
| 53 | 53 | Providing PCC M-150 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone Chips (20mm to 6mm size graded and clean coarse sand of F.M 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete job as per specification and direction of E/I. (5.3.2) | 21.24 | /M3 | |
| 54 | 54 | Earth work filing in flanks in road fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5 all complete job as per specification and direction of E/I all complete job. | 10 | Each | |
| 55 | 55 | Carriage of Materials\nStone Metal (Lead 25 KM) | 24.4 | /M3 | |
| 56 | 56 | Sand (Lead 30 KM) | 13.18 | /M3 | |
| 57 | 57 | Stone Chips( Lead 25 KM) | 19.1 | /M3 | |
| 58 | 58 | Add Cost of Signboard and Photographs | 4 | Each | |
| 59 | 59 | Goods & Service Tax (G.S.T.) - | BI01010001010000000000000515BI0100001150 | 1.03922e+06 | Rs. |
| 60 | 60 | Labour Cess - | BI01010001010000000000000515BI0100001151 | 1.16393e+06 | Rs. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender