| 1 | 1 | Poles: Unloading of Steel Tubular / Cement Poles by Manual/Mechanical means | | | |
|---|
| 2 | 1.01 | S.T.Poles 8 mtr | item1.01 | 1 | Nos |
|---|
| 3 | 1.02 | S.T.Poles 9 mtr | item1.02 | 1 | Nos |
|---|
| 4 | 1.03 | S.T.Poles 11 mtr | item1.03 | 1 | Nos |
|---|
| 5 | 1.04 | S.T.Poles 13 mtr | item1.04 | 1 | Nos |
|---|
| 6 | 1.05 | P.C.C Poles 7.5 mtr | item1.05 | 1 | Nos |
|---|
| 7 | 1.06 | P.C.C. Pole 8 Mtr | item1.06 | 1 | Nos |
|---|
| 8 | 1.07 | P.C.C. Pole 9 Mtr | item1.07 | 1 | Nos |
|---|
| 9 | 2 | Poles: Dragging/Carriage of Steel Tubular / Cement Poles by Manual/Mechanical for first 100 mtrs | | | |
|---|
| 10 | 2.01 | S.T.Poles 8 mtr | item2.01 | 1 | Nos |
|---|
| 11 | 2.02 | S.T.Poles 9 mtr | item2.02 | 1 | Nos |
|---|
| 12 | 2.03 | S.T.Poles 11 mtr | item2.03 | 1 | Nos |
|---|
| 13 | 2.04 | S.T.Poles 13 mtr | item2.04 | 1 | Nos |
|---|
| 14 | 2.05 | P.C.C Poles 7.5 mtr | item2.05 | 1 | Nos |
|---|
| 15 | 2.06 | P.C.C. Pole 8 Mtr | item2.06 | 1 | Nos |
|---|
| 16 | 2.07 | P.C.C. Pole 9 Mtr | item2.07 | 1 | Nos |
|---|
| 17 | 3 | Poles: Dragging/Carriage of Steel Tubular / Cement Poles by Manual/Mechanical for every additional 50 mtrs after first 100 mtrs | | | |
|---|
| 18 | 3.01 | S.T.Poles 8 mtr | item3.01 | 1 | Nos |
|---|
| 19 | 3.02 | S.T.Poles 9 mtr | item3.02 | 1 | Nos |
|---|
| 20 | 3.03 | S.T.Poles 11 mtr | item3.03 | 1 | Nos |
|---|
| 21 | 3.04 | S.T.Poles 13 mtr | item3.04 | 1 | Nos |
|---|
| 22 | 3.05 | P.C.C Poles 7.5 mtr | item3.05 | 1 | Nos |
|---|
| 23 | 3.06 | P.C.C. Pole 8 Mtr | item3.06 | 1 | Nos |
|---|
| 24 | 3.07 | P.C.C. Pole 9 Mtr | item3.07 | 1 | Nos |
|---|
| 25 | 4 | Poles: Loading of Steel Tubular / Cement Poles by Manual/Mechanical means | | | |
|---|
| 26 | 4.01 | S.T.Poles 8 mtr | item4.01 | 1 | Nos |
|---|
| 27 | 4.02 | S.T.Poles 9 mtr | item4.02 | 1 | Nos |
|---|
| 28 | 4.03 | S.T.Poles 11 mtr | item4.03 | 1 | Nos |
|---|
| 29 | 4.04 | S.T.Poles 13 mtr | item4.04 | 1 | Nos |
|---|
| 30 | 4.05 | P.C.C Poles 7.5 mtr | item4.05 | 1 | Nos |
|---|
| 31 | 4.06 | P.C.C. Pole 8 Mtr | item4.06 | 1 | Nos |
|---|
| 32 | 4.07 | P.C.C. Pole 9 Mtr | item4.07 | 1 | Nos |
|---|
| 33 | 5 | Poles: Complete erection of Poles including digging of pits and collection of rocks/earth for back fill in hard rock soil and verification. | | | |
|---|
| 34 | 5.01 | S.T.Poles 8 mtr | item5.01 | 1 | Nos |
|---|
| 35 | 5.02 | S.T.Poles 9 mtr | item5.02 | 1 | Nos |
|---|
| 36 | 5.03 | S.T.Poles 11 mtr | item5.03 | 1 | Nos |
|---|
| 37 | 5.04 | S.T.Poles 13 mtr | item5.04 | 1 | Nos |
|---|
| 38 | 5.05 | P.C.C Poles 7.5 mtr | item5.05 | 1 | Nos |
|---|
| 39 | 5.06 | P.C.C. Pole 8 Mtr | item5.06 | 1 | Nos |
|---|
| 40 | 5.07 | P.C.C. Pole 9 Mtr | item5.07 | 1 | Nos |
|---|
| 41 | 6 | Poles: Dismantling of Poles complete Job | | | |
|---|
| 42 | 6.01 | S.T.Poles 8 mtr | item6.01 | 1 | Nos |
|---|
| 43 | 6.02 | S.T.Poles 9 mtr | item6.02 | 1 | Nos |
|---|
| 44 | 6.03 | S.T.Poles 11 mtr | item6.03 | 1 | Nos |
|---|
| 45 | 6.04 | S.T.Poles 13 mtr | item6.04 | 1 | Nos |
|---|
| 46 | 6.05 | P.C.C Poles 7.5 mtr | item6.05 | 1 | Nos |
|---|
| 47 | 6.06 | P.C.C. Pole 8 Mtr | item6.06 | 1 | Nos |
|---|
| 48 | 6.07 | P.C.C. Pole 9 Mtr | item6.07 | 1 | Nos |
|---|
| 49 | 7 | Poles: Cement bottoming 1:2:4 mix as per REC standards including plaster and curing of concrete in size of for Poles for refilling the pit (the leftover pit after concreting to be filled with soil and boulders)and verification\n (As per recommended IS/REC Standard) | item7 | 1 | Cum |
|---|
| 50 | 8 | Stay Set: Complete erection of Stay Set with Stay clamp, guy insulator(2Nos.), anchor plate, nut bolts, 2 Nos turn-buckles, solid stay rod and stranded wire at Tension points. (As per recommended IS/REC Standard) | | | |
|---|
| 51 | 8.01 | HT | item8.01 | 1 | Nos |
|---|
| 52 | 8.02 | LT | item8.02 | 1 | Nos |
|---|
| 53 | 9 | Survey and Route Clearance for HT Line | item9 | 1 | Kms |
|---|
| 54 | 10 | Survey and Route Clearance for LT Line | item10 | 1 | Kms |
|---|
| 55 | 11 | Branch Cutting of Trees | item11 | 1 | Kms |
|---|
| 56 | 12 | Route Cleaance for corridor of 5M | item12 | 1 | Kms |
|---|
| 57 | 13 | Conductor: Laying, Stringnig, Fixing, Binding and Jointing of Conductor. | | | |
|---|
| 58 | 13.01 | for Conductor Size of 0-50 mmsq (upto Rabbit) | item13.01 | 1 | Kms |
|---|
| 59 | 13.02 | for Conductor Size of 51-100 mmsq (Dog) | item13.02 | 1 | Kms |
|---|
| 60 | 13.03 | for Conductor Size above 100 mmsq | item13.03 | 1 | Kms |
|---|
| 61 | 14 | Conductor: Dismantling of Conductor. | | | |
|---|
| 62 | 14.01 | for Conductor Size of 0-50 mmsq (upto Rabbit) | item14.01 | 1 | Kms |
|---|
| 63 | 14.02 | for Conductor Size of 51-100 mmsq (Dog) | item14.02 | 1 | Kms |
|---|
| 64 | 14.03 | for Conductor Size above 100 mmsq | item14.03 | 1 | Kms |
|---|
| 65 | 15 | HT Cable 11 kV Grade PVC XLPE Overhead Cable: Laying, Stringnig, Fixing, Binding and Jointing | | | |
|---|
| 66 | 15.01 | for size 1-35 mmsq | item15.01 | 1 | Kms |
|---|
| 67 | 15.02 | for size 35-70 mmsq | item15.02 | 1 | Kms |
|---|
| 68 | 15.03 | for size 70-120 mmsq | item15.03 | 1 | Kms |
|---|
| 69 | 16 | LT Cable 3Ph4W 1kV Grade PVC XLPE Overhead Cable: Laying, Stringnig, Fixing, Binding and Jointing | | | |
|---|
| 70 | 16.01 | for size 1-35 mmsq | item16.01 | 1 | Kms |
|---|
| 71 | 16.02 | for size 35-70 mmsq | item16.02 | 1 | Kms |
|---|
| 72 | 16.03 | for size 70-120 mmsq | item16.03 | 1 | Kms |
|---|
| 73 | 17 | ABC Cable 3 Core with Messenger : Laying, Stringnig, Fixing, Binding and Jointing for phase cable size | | | |
|---|
| 74 | 17.01 | upto 35 mmsq | item17.01 | 1 | Kms |
|---|
| 75 | 17.02 | 35-70 mmsq | item17.02 | 1 | Kms |
|---|
| 76 | 17.03 | 70-150 mmsq | item17.03 | 1 | Kms |
|---|
| 77 | 18 | Fixing of Guard Netting complete with earthing connection on both sides using Cradle guard wire 8 SWG GI wire and lashing of 10 SWG GI wire including x-arms with clamps and braces, threaded eye bolts, turn buckles and binding wire, nut bolts etc. (As per recommended IS/REC Standard) | item18 | 1 | Spans |
|---|
| 78 | 19 | Installation and Fixing of Equipments | | | |
|---|
| 79 | 19.01 | L. A Set | item19.01 | 1 | Nos |
|---|
| 80 | 19.02 | D. O Set | item19.02 | 1 | Nos |
|---|
| 81 | 19.03 | Link Set | item19.03 | 1 | Nos |
|---|
| 82 | 19.04 | Double Breaker Isolator with Earthing Switch | item19.04 | 1 | Nos |
|---|
| 83 | 19.05 | G. O Set | item19.05 | 1 | Nos |
|---|
| 84 | 19.06 | Jumpering Sets for HT | item19.06 | 1 | Nos |
|---|
| 85 | 19.07 | Jumpering Sets for LT | item19.07 | 1 | Nos |
|---|
| 86 | 19.08 | 1 Phase Meter | item19.08 | 1 | Nos |
|---|
| 87 | 19.09 | 2 Phase Meter | item19.09 | 1 | Nos |
|---|
| 88 | 19.1 | 3 Phase Meter | item19.1 | 1 | Nos |
|---|
| 89 | 19.11 | Trivector Meter | item19.11 | 1 | Nos |
|---|
| 90 | 19.12 | Prodigy/Thread through Meter | item19.12 | 1 | Nos |
|---|
| 91 | 19.13 | MCCB Box Complete Job | item19.13 | 1 | Nos |
|---|
| 92 | 19.14 | CT-PT Unit Complete Job | item19.14 | 1 | Nos |
|---|
| 93 | 19.15 | LT Bus Bar/Fuse Set with Al Strip and BusBar Insulator | item19.15 | 1 | Nos |
|---|
| 94 | 19.16 | Mukky Clamps Complete | item19.16 | 1 | Nos |
|---|
| 95 | 19.17 | U Clamps Complete | item19.17 | 1 | Nos |
|---|
| 96 | 19.18 | Shakle Insulators | item19.18 | 1 | Nos |
|---|
| 97 | 19.19 | Pin Insulator with GI Pin | item19.19 | 1 | Nos |
|---|
| 98 | 19.2 | Disc Insulator with Fittings | item19.2 | 1 | Nos |
|---|
| 99 | 19.21 | PG Clamps | item19.21 | 1 | Nos |
|---|
| 100 | 19.22 | Wedge Connectors | item19.22 | 1 | Nos |
|---|
| 101 | 19.23 | LT Bimetallic Connectors | item19.23 | 1 | Nos |
|---|
| 102 | 19.24 | Cable Jointing Connectors | item19.24 | 1 | Nos |
|---|
| 103 | 19.25 | 11 kV Cable Termination Kits | item19.25 | 1 | Nos |
|---|
| 104 | 19.26 | Danger Plates | item19.26 | 1 | Nos |
|---|
| 105 | 19.27 | Anticlimbing Spike Devices | item19.27 | 1 | Nos |
|---|
| 106 | 19.28 | Anticlimbing Device with 2 Kg 12-SWG GI Barbed Wire | item19.28 | 1 | Nos |
|---|
| 107 | 19.29 | Bimetallic Connectors | item19.29 | 1 | Nos |
|---|
| 108 | 19.3 | Al Thimbles/ Lugs Cable Back Connectors | item19.3 | 1 | Nos |
|---|
| 109 | 19.31 | Cross Arm 0.35 M Long with Back Clamps | item19.31 | 1 | Nos |
|---|
| 110 | 19.32 | Cross Arm 0.5 M Long with Back Clamps | item19.32 | 1 | Nos |
|---|
| 111 | 19.33 | Cross Arm 1.25 M Long with Back Clamps | item19.33 | 1 | Nos |
|---|
| 112 | 19.34 | Cross Arm 2.2 M Long with Back Clamps | item19.34 | 1 | Nos |
|---|
| 113 | 19.35 | Cross Arm 2.8 M Long with Back Clamps | item19.35 | 1 | Nos |
|---|
| 114 | 19.36 | V Cross Arms for HT with Back Clamps | item19.36 | 1 | Nos |
|---|
| 115 | 19.37 | Pole Top Bracket for HT with Back Clamps | item19.37 | 1 | Nos |
|---|
| 116 | 19.38 | Angle Cross Brace Sets for H Structure with Clamps | item19.38 | 1 | Nos |
|---|
| 117 | 19.39 | Angle Brace Sets for Pole Straight X Arms or Transformer Bed with Clamps | item19.39 | 1 | Nos |
|---|
| 118 | 19.4 | Cross Arm Bed for Placement of Transfromer | item19.4 | 1 | Nos |
|---|
| 119 | 20 | Fixing of PVC Cable with Crimping of Thimbles for LT Complete Circuit with 44 Mts of Cable for size | | | |
|---|
| 120 | 20.01 | 25 sqmm to 75 sqmm | item20.01 | 1 | Ckt |
|---|
| 121 | 20.02 | 70 sqmm to 185 sqmm | item20.02 | 1 | Ckt |
|---|
| 122 | 20.03 | Above 185 sqmm | item20.03 | 1 | Ckt |
|---|
| 123 | 21 | Painting of Poles and Allied Items with 1 coat of Red Oxide and 2 coats of Aluminium Paint of good quality | | | |
|---|
| 124 | 21.01 | Steel Tublar Poles (1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) | item21.01 | 1 | Nos |
|---|
| 125 | 21.02 | Cross Arms, Clamps, Nuts, Bolts Etc | item21.02 | 1 | Nos |
|---|
| 126 | 22 | Excavation of Earthing Pits, fixing of earthing electrode through GI Strip/wire with Nuts, Bolts and Clamps, refilled with earth enhancement materials (and earthing chamber made of brick masonary with RCC Slab Cover when required) (as per req REC/IS Standards ) | | | |
|---|
| 127 | 22.01 | Rod Earthing (2.5 M x 20mm GI Rod) | item22.01 | 1 | Nos |
|---|
| 128 | 22.02 | Pipe Earthing (2.5 M x 40mm GI Pipe) | item22.02 | 1 | Nos |
|---|
| 129 | 22.03 | Spiral Coil Earthing (8 SWG GI Wire) | item22.03 | 1 | Nos |
|---|
| 130 | 22.04 | Plate Earthing (6mm Plate) | item22.04 | 1 | Nos |
|---|
| 131 | 22.05 | Chemical Earthing (2.5 M Electrode) | item22.05 | 1 | Nos |
|---|
| 132 | 23 | Cement Pad for Transformer of 1:2:4 mix including frame work plaster and curing of concrete. | item23 | 1 | Cum |
|---|
| 133 | 24 | Chain Link Fencing with GI Mesh and MS/GI Channel/Pipe for restricting access to transformers. | item24 | 1 | Mtrs |
|---|
| 134 | 25 | Transformers: Unloading by Manual/Mechanical means, Verification. | | | |
|---|
| 135 | 25.01 | 630 KVA Distrb Transformer | item25.01 | 1 | No's. |
|---|
| 136 | 25.02 | 400 KVA Distrb Transformer | item25.02 | 1 | No's. |
|---|
| 137 | 25.03 | 250 KVA Distrb Transformer | item25.03 | 1 | No's. |
|---|
| 138 | 25.04 | 100 KVA Distrb Transformer | item25.04 | 1 | No's. |
|---|
| 139 | 25.05 | 63 KVA Distrb Transformer | item25.05 | 1 | No's. |
|---|
| 140 | 25.06 | 25 KVA Distrb Transformers | item25.06 | 1 | No's. |
|---|
| 141 | 26 | Transformer: Dragging/Carriage by Manual/Mechanical for first 50 mtrs | | | |
|---|
| 142 | 26.01 | 630 KVA Distrb Transformer | item26.01 | 1 | No's. |
|---|
| 143 | 26.02 | 400 KVA Distrb Transformer | item26.02 | 1 | No's. |
|---|
| 144 | 26.03 | 250 KVA Distrb Transformer | item26.03 | 1 | No's. |
|---|
| 145 | 26.04 | 100 KVA Distrb Transformer | item26.04 | 1 | No's. |
|---|
| 146 | 26.05 | 63 KVA Distrb Transformer | item26.05 | 1 | No's. |
|---|
| 147 | 26.06 | 25 KVA Distrb Transformers | item26.06 | 1 | No's. |
|---|
| 148 | 27 | Transformer: Dragging/Carriage by Manual/Mechanical for every additional 10mtrs after first 50 mtrs | | | |
|---|
| 149 | 27.01 | 630 KVA Distrb Transformer | item27.01 | 1 | No's. |
|---|
| 150 | 27.02 | 400 KVA Distrb Transformer | item27.02 | 1 | No's. |
|---|
| 151 | 27.03 | 250 KVA Distrb Transformer | item27.03 | 1 | No's. |
|---|
| 152 | 27.04 | 100 KVA Distrb Transformer | item27.04 | 1 | No's. |
|---|
| 153 | 27.05 | 63 KVA Distrb Transformer | item27.05 | 1 | No's. |
|---|
| 154 | 27.06 | 25 KVA Distrb Transformers | item27.06 | 1 | No's. |
|---|
| 155 | 28 | Transformer: Loading by Manual/Mechanical means into trucks and verification. | | | |
|---|
| 156 | 28.01 | 630 KVA Distrb Transformer | item28.01 | 1 | No's. |
|---|
| 157 | 28.02 | 400 KVA Distrb Transformer | item28.02 | 1 | No's. |
|---|
| 158 | 28.03 | 250 KVA Distrb Transformer | item28.03 | 1 | No's. |
|---|
| 159 | 28.04 | 100 KVA Distrb Transformer | item28.04 | 1 | No's. |
|---|
| 160 | 28.05 | 63 KVA Distrb Transformer | item28.05 | 1 | No's. |
|---|
| 161 | 28.06 | 25 KVA Distrb Transformers | item28.06 | 1 | No's. |
|---|
| 162 | 29 | Transformer: Mounting and Fixing of Transformer on Transformer Bed Complete Job | | | |
|---|
| 163 | 29.01 | 630 KVA Distrb Transformer | item29.01 | 1 | No's. |
|---|
| 164 | 29.02 | 400 KVA Distrb Transformer | item29.02 | 1 | No's. |
|---|
| 165 | 29.03 | 250 KVA Distrb Transformer | item29.03 | 1 | No's. |
|---|
| 166 | 29.04 | 100 KVA Distrb Transformer | item29.04 | 1 | No's. |
|---|
| 167 | 29.05 | 63 KVA Distrb Transformer | item29.05 | 1 | No's. |
|---|
| 168 | 29.06 | 25 KVA Distrb Transformers | item29.06 | 1 | No's. |
|---|
| 169 | 30 | Transformer: Dismantling of Transformer from Transformer Bed Complete Job | | | |
|---|
| 170 | 30.01 | 630 KVA Distrb Transformer | item30.01 | 1 | No's. |
|---|
| 171 | 30.02 | 400 KVA Distrb Transformer | item30.02 | 1 | No's. |
|---|
| 172 | 30.03 | 250 KVA Distrb Transformer | item30.03 | 1 | No's. |
|---|
| 173 | 30.04 | 100 KVA Distrb Transformer | item30.04 | 1 | No's. |
|---|
| 174 | 30.05 | 63 KVA Distrb Transformer | item30.05 | 1 | No's. |
|---|
| 175 | 30.06 | 25 KVA Distrb Transformers | item30.06 | 1 | No's. |
|---|
| 176 | 31 | Line Material: Unloading by Manual/Mechanical means, and Verification. | item31 | 1 | Qtls |
|---|
| 177 | 32 | Line Material:Dragging/Carriage by Manual/Mechanical for first 100 mtrs | item32 | 1 | Qtls |
|---|
| 178 | 33 | Line Material: Dragging/Carriage by Manual/Mechanical for every additional 50 mtrs after fisrt 100 mtrs. | item33 | 1 | Qtls |
|---|
| 179 | 34 | Line Material: Loading by Manual/Mechanical means into trucks and verification. | item34 | 1 | Qtls |
|---|
| 180 | 35 | Service Line: Fixing Charges of Service Lines with support wire and spool insulators for length | | | |
|---|
| 181 | 35.01 | upto 10 mtr | item35.01 | 1 | Nos |
|---|
| 182 | 35.02 | 10-20 Mtr | item35.02 | 1 | Nos |
|---|
| 183 | 35.03 | 21-30 Mtr | item35.03 | 1 | Nos |
|---|
| 184 | 36 | Fabrication of Structure Materials | | | |
|---|
| 185 | 36.01 | Guy Rods complete with turn buckle and stand screw from Round Iron and MS Angle Iron. | item36.01 | 1 | Kgs |
|---|
| 186 | 36.02 | Clamps: U Clamps, Mucky Clamps, Cross Clamps, Brace Clamps, Guy Clamps, Others from MS Flat Iron. | item36.02 | 1 | Kgs |
|---|
| 187 | 36.03 | Channel Cross Arms from MS Channel Iron | item36.03 | 1 | Kgs |
|---|
| 188 | 36.04 | Angle Brace from MS Angle Iron | item36.04 | 1 | Kgs |
|---|
| 189 | 36.05 | V Cross Arm of Channel 75x 40x 6mm | item36.05 | 1 | Nos |
|---|
| 190 | 36.06 | 11 kV Poles Top Bracket | item36.06 | 1 | Nos |
|---|
| 191 | 36.07 | Drilling of Holes | item36.07 | 1 | Nos |
|---|
| 192 | 37 | Providing of Unskilled Labour for Watch and Ward, Carriage, Collection and T&P Works (Rate per Day for 01 No Labour) | item37.00 | 1 | Nos |
|---|