}

Sabarimala Devaswom-M M Festivals In 1196 Me-Providing Temporary Illumination To The Temple Structure And Various Building And Providing Temporary Light Arrangements To The Police Shelters And Fire Point Etc At Sabarimala , Kunnar Check Dam ( Retender ), Sabarimala-Kerala

Travancore Devaswom Board-TDB has published Sabarimala Devaswom-M M Festivals In 1196 Me-Providing Temporary Illumination To The Temple Structure And Various Building And Providing Temporary Light Arrangements To The Police Shelters And Fire Point Etc At Sabarimala , Kunnar Check Dam ( Retender ). Submission Date for this Tender is 04-11-2020. Electrification Work Tenders in Sabarimala Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

25850900
Sabarimala Devaswom-M M Festivals In 1196 Me-Providing Temporary Illumination To The Temple Structure And Various Building And Providing Temporary Light Arrangements To The Police Shelters And Fire Point Etc At Sabarimala , Kunnar Check Dam ( Retender )
Open Tender
Indian
Kerala
Sabarimala
04-11-2020

Tender Details

Sabarimala Devaswom-M M Festivals In 1196 Me-Providing Temporary Illumination To The Temple Structure And Various Building And Providing Temporary Light Arrangements To The Police Shelters And Fire Point Etc At Sabarimala , Kunnar Check Dam ( Retender )

Key Value

Document Fees
INR 1750 /-
EMD
INR 21600.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Sabarimala Devaswom- M&M festivals in 1196 ME- providing temporary illumination to the temple structure and various building and providing temporary light arrangements to the police shelters and fire point etc..at Sabarimala and kunnar (Retender)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Appendix-A\nProviding temporary illumination on hire bases to the temple structure Devaswom guest house etc.. at Sabarimala\n
2 2 Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc for first day ie.15.11.2020
3 2.01 Sree dharma sastha temple structure including prasadamandapam by using 300 set. (Rate Quoted should be Set/Day) 300 set
4 2.02 Malikapuram devi temple structure including prasadamandapam and gopuram by using 175set. (Rate Quoted should be Set/Day) 175 set
5 2.03 Devaswom book stall at sannidhanam by using 70 set. (Rate Quoted should be Set/Day) 70 set
6 2.04 Tree in the lower thirumuttom by using 95set.(Rate Quoted should be Set/Day) 95 set
7 2.05 Publicity and information office building by using 25set.(Rate Quoted should be Set/Day) 25 set
8 2.06 Devaswom guest house by using 100set (Rate Quoted should be Set/Day) 100 set
9 2.07 Accommodation office building by using 25set. (Rate Quoted should be Set/Day) 25 set
10 2.08 Maramath complex by using 75set. (Rate Quoted should be Set/Day) 75 Set
11 3 Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc for additional 65 days from 16.11.2020 to 19.01.2021
12 3.01 Sree dharma sastha temple structure including prasadamandapam by using 300 set/day for 65days.(300x65days=19500sets) (Rate Quoted should be Set/Day) 19500 Set
13 3.02 Malikapuram devi temple structure including prasadamandapam and gopuram by using 175set/day for 65 days.(175x65=11375set) (Rate Quoted should be Set/Day) 11375 set
14 3.03 Devaswom book stall at sannidhanam by using 70 set/day for 65days (70x65days=4550set).(Rate Quoted should be Set/Day) 4550 set
15 3.04 Tree in the lower thirumuttom by using 95set/day for 65days(95x65day=6175set) (Rate Quoted should be Set/Day) 6175 set
16 3.05 Publicity and information office building by using 25set/day for 65days(25x65day=1625set) (Rate Quoted should be Set/Day) 1625 set
17 3.06 Devaswom guest house by using 100set/day for 65day(100x65day=6500set) (Rate Quoted should be Set/Day) 6500 set
18 3.07 Accommodation office building by using 25set/day for 65days (25x65days=1625set) (Rate Quoted should be Set/Day) 1625 set
19 3.08 Maramath complex by using 75set/day for 65days(75x65day=4875set) (Rate Quoted should be Set/Day) 4875 set
20 4 Appendix B\nProviding temporary light arrangements on hire bases to the police shelters and fire points etc. in the various locations at Sabarimala.
21 4.01 Hire and labour charge for providing wiring light/fan point inside the shed using 1sq.mm PVC insulated copper wire through 20mm dia PVC conduit and accessories and ceiling rose for first day ie:15.11.2020 468 nos
22 4.02 Do …. do for additional 65days from 16.11.2020to19.01.2021.(468x65=30420nos) (Rate Quoted should be Each per Day) 30420 nos
23 4.03 Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie: on 15.11.2020 (Rate Quoted should be Each per Day) 55 nos
24 4.04 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 3375 nos
25 4.05 Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for first day ie;on 15.11.2020. (Rate Quoted should be Each per Day) 18 nos
26 4.06 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 1170 nos
27 4.07 Hire and labour charges for providing 1x40W patties type fluresent fittings with all accessories and tubes for first dayie;15.11.2020 (Rate Quoted should be Each per Day) 317 nos
28 4.08 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 20605 nos
29 4.09 Hire and labour charges for providing 1200mm sweep ceiling fan and giving connection for first day ie;15.11.2020 (Rate Quoted should be Each per Day) 151 nos
30 4.1 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 9815 nos
31 4.11 Hire and labour charges for providing 20mm PVC pipe with accessories for Ist day ie;on 15.11.2020. (Rate Quoted should be Metre per Day) 680 m
32 4.12 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 44200 m
33 4.13 Hire and labour charges for providing 2x3/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2020. (Rate Quoted should be Meter per Day) 425 m
34 4.14 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meters per Day) 27625 m
35 4.15 Hire and labour charges for providing 4x3/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2020. 175 m
36 4.16 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 11375 m
37 4.17 Hire and labour charges for providing 2x7/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2020. (Rate Quoted should be Meter per Day) 144 m
38 4.18 Do …. do for additional 65days from 16.11.2020to 19.01.2021 (Rate Quoted should be Meter per Day) 9360 m
39 4.19 Hire and labour charges for providing 3 phase 4 way MCB DB with 40A 4 pole isolator and giving connection for Ist day ie;15.11.2020. (Rate Quoted should be Each per Day) 30 nos
40 4.2 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 1950 nos
41 4.21 Hire and labour charges for providing ordinary type meter board consists of 3nos 63A HRC cut out with fuse link and 1no 63A 2 way neutral link for Ist day ie; 15.11.2020 30 nos
42 4.22 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 1950 m
43 4.23 Hire and labour charges for providing ordinary pipe earthing as required for Ist day ie; 15.11.2020 (Rate Quoted should be Each per Day) 30 nos
44 4.24 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 1950 nos
45 4.25 Hire and labour charges for providing drawing No 10 SWG base copper conductor and giving connection for Ist day ie; 15.11.2020. (Rate Quoted should be Meter per Day) 180 m
46 4.26 Do …. do for additional 65days from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 11700 m
47 5 Appendix-C.Tempoary light arrangements in kunnar dam site.
48 5.01 Hire and labour charge for providing 10KVA DG set complete including conveyance posting of duty staff for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 2 nos
49 5.02 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 130 nos
50 5.03 Running charges for10KVA DGset including supply of fuels etc: (Rate Quoted should be per Hour) 780 Hrs
51 5.04 Hire and labour charges for providing 3 phase 4way MCB DB with 40A 4 pole isolator ELCB and giving connection for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 1 nos
52 5.05 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 65 nos
53 5.06 Hire and labour charge for providing ordinary pipe earthing as required ie:15.11.2020 (Rate Quoted should be Each per Day) 3 nos
54 5.07 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 195 nos
55 5.08 Hire and labour charge for providing 20mm PVC pipe with accessories for Ist day ie:15.11.2020 (Rate Quoted should be Meter per Day) 74 m
56 5.09 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 4810 m
57 5.1 Hire and labour charge for providing 2x3/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2020 (Rate Quoted should be M per Day) 75 m
58 5.11 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 4875 m
59 5.12 Hire and labour charge for providing 2x7/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2020 (Rate Quoted should be Meter per Day) 15 m
60 5.13 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 975 m
61 5.14 Hire and labour charge for providing pattes type fluresent tube fittings complete with tube in position and giving connection as required for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 15 nos
62 5.15 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 975 nos
63 5.16 Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2020. (Rate Quoted should be Each per Day) 5 nos
64 5.17 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 325 nos
65 5.18 Hire and labour charge for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 5 nos
66 5.19 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 325 nos
67 6 Appendix-D.Tempoary light arrangements in check dam site
68 6.01 Hire and labour charge for providing 10KVA DG set complete including conveyance posting of duty staff for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 2 nos
69 6.02 Do. do. for the remaining 65 days during the period from 16.11.2020to 19.01.2021 (Rate Quoted should be Each per Day) 130 nos
70 6.03 Running charges for10KVA DGset including supply of fuels etc: (Rate Quoted should be per Hour) 780 Hrs
71 6.04 Hire and labour charges for providing 3 phase 4way MCB DB with 40A 4 pole isolator ELCB and giving connection for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 1 nos
72 6.05 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 65 nos
73 6.06 Hire and labour charge for providing ordinary pipe earthing as required ie:15.11.2020 (Rate Quoted should be Each per Day) 3 nos
74 6.07 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 195 nos
75 6.08 Hire and labour charge for providing 20mm PVC pipe with accessories for Ist day ie:15.11.2020 (Rate Quoted should be Meter per Day) 74 m
76 6.09 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 4810 m
77 6.1 Hire and labour charge for providing 2x3/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2020 (Rate Quoted should be M per Day) 75 m
78 6.11 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 4875 m
79 6.12 Hire and labour charge for providing 2x7/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2020 (Rate Quoted should be Meter per Day) 15 m
80 6.13 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Meter per Day) 975 m
81 6.14 Hire and labour charge for providing pattes type fluresent tube fittings complete with tube in position and giving connection as required for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 15 nos
82 6.15 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 975 nos
83 6.16 Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2020. (Rate Quoted should be Each per Day) 5 nos
84 6.17 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 325 nos
85 6.18 Hire and labour charge for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie:15.11.2020 (Rate Quoted should be Each per Day) 5 nos
86 6.19 Do. do. for the remaining 65 days during the period from 16.11.2020 to 19.01.2021 (Rate Quoted should be Each per Day) 325 nos
87 7 Appendix-E Conveyance charges
88 7.01 To and fro conveyance charges of equipments accessories etc: from Sabarimala to kunnar and check dam site. 1 Job
89 7.02 Additional conveyance charges for fuels and engine oil from Sabarimala to kunnar and check dam site as per the requirement during the course of festival period as directed by the department officer. 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail