Outsourcing Services For Operation Of Water Supply Installation And Electric Supply Installation Under Ge ( C ) Kolkata Outsourcing Services For Operation Of Water Supply Installation And Electric Supply Installation At Bm Camp Area And Map Phase-Ii Comm

Tender Notice

25850688
Outsourcing Services For Operation Of Water Supply Installation And Electric Supply Installation Under Ge ( C ) Kolkata Outsourcing Services For Operation Of Water Supply Installation And Electric Supply Installation At Bm Camp Area And Map Phase-Ii Comm
Indian
West Bengal
28-10-2020
16-11-2020
18-11-2020

Tender Details

Outsourcing Services For Operation Of Water Supply Installation And Electric Supply Installation Under Ge ( C ) Kolkata Outsourcing Services For Operation Of Water Supply Installation And Electric Supply Installation At Bm Camp Area And Map Phase-Ii Commissiariate Road , Od Alipore And Raspunja Area Under Ge ( C ) Kolkata

Key Value

Document Fees
INR 1000 /-
EMD
INR 229000.00 /-
Tender Value
Refer document

BOQ Items

Nature of Work: OUTSOURCING SERVICES FOR OPERATION OF VARIOUS PUMPING INSTALLATIONS AND DG SETS AT TURF VIEW, HQ BENGAL AREA COMPLEX, OLD IMH COMPLEX, GOKHALE ROAD AND ZRO UNDER GE(A) KOLKATA
Sl. No. Item Description Item Code / Make Quantity Units
1 1 NOTE :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates.\n In case the overall quoted rates are less than to the overall minimum wages as mention in SCh 'A' notes and such quoted bid shall be consider as a non-bonafide bids and same shall be rejected during financial evaluation. The tenderers should keep in mind while quoting their offer. However contractor/bidder shall not be entitled to any compensation whatsoever for rejection of financial bids.\n\n\n\n\n
2 2 Outsourcing of 08 hrs Fitter General Mechanic(Skilled) operation of various type Pump, DG Set, water treatment, equipment/machinery etc per day per month including reliever on Sundays & holidays for day to day operation of group of following E/M installations under GE(C) and daily maintenance including cleaning entire installation area and daily maintenance of necessary records & documents all as specified here-in-after:- \nQty- {01 no FGM x (02 shifts ( Moring shift & Evening Shift) x 11 Nos Location(Pump House / DG Set)+01 shifts ( Moring shift ) x 2Nos Location(Pump House)} x11 Month = 264 Each calendar month per 08 hours service.\n\n\n
3 2.01 Wages including Variable Dearness Allowance BI0F2021E18R0C01I001 264 Each calender month
4 2.02 EPF Contribution liability of employer BI0F2021E18R0C01I002 264 Each calender month
5 2.03 ESIC Contribution of employer BI0F2021E18R0C01I003 264 Each calender month
6 2.04 Bonus Contribution of employer BI0F2021E18R0C01I004 264 Each calender month
7 2.05 Labous Welfare cess BI0F2021E18R0C01I005 264 Each calender month
8 2.06 GST BI0F2021E18R0C01I006 264 Each calender month
9 2.07 Contractors overhead & profit BI0F2021E18R0C01I007 264 Each calender month
10 2.08 Total quoted unit rate of above item.\n
11 3 Outsourcing of 08 hrs Mate Fitter General Mechanic(Semi Skilled) operation of various type Pump, DG Set, water treatment, equipment/machinery etc per day per month including reliever on Sundays & holidays for day to day operation of group of following E/M installations in various pump house at Turf View Area, HQ BA Area, Gokhale Road, Old IMH Complex as per direction of Engg-in-Charge’s/GE and daily maintenance including cleaning entire installation area and daily maintenance of necessary records & documents all as specified here-in-after:-\nQty- 01 no FGM x 01 shifts ( Night Shift) x 07 Nos Location(Pump House / DG Set) x11 Month = 77 Each calendar month per 08 hours service.\n\n\n
12 3.01 Wages including Variable Dearness Allowance BI0F2021E18R0C01I008 77 Each calender month
13 3.02 EPF Contribution of employer BI0F2021E18R0C01I009 77 Each calender month
14 3.03 ESIC Contribution of employer BI0F2021E18R0C01I010 77 Each calender month
15 3.04 Bonus Contribution of employer BI0F2021E18R0C01I011 77 Each calender month
16 3.05 Labous Welfare cess BI0F2021E18R0C01I012 77 Each calender month
17 3.06 GST BI0F2021E18R0C01I013 77 Each calender month
18 3.07 Contractors overhead & profit BI0F2021E18R0C01I014 77 Each calender month
19 3.08 Total quoted unit rate of above item.\n
20 4.01 Note for item no 2 &3(including sub items):\nDetails of tentative Group of Installations / Pump House /DG Sets:-\n(A) BM Camp Area\n(i) Pump House No 1 at BMC Area:- Consisting of booster pump set 04 Nos (coupled with 75 HP motor 2 Nos & 12.5 HP motor 02 Nos) and DG Set 100 KVA 01 No (Moring Shift + Evening Shift)\n(ii) Pump House No 6 & 8 at BMC Area :- Consisting of booster pump set 04 Nos (coupled with 5 HP motor 2 Nos & 10 HP motor 02 Nos) and DG Set 25 KVA - 01 No, 82.5 KVA - 01 No, 31.25 KVA (Moring Shift + Evening Shift)\n(iii) Pump House No 7 & 4 at BMC Area:- Consisting of booster pump set 06 Nos (coupled with 7.5 HP motor 4 Nos & 5 HP motor 02 Nos) and DG Set 125 KVA - 02 No, 100 KVA - 01 No, 62.5 KVA and Pump House for JCO's / OR's MS Accn Map Accn consisting of centrifugal booster pump set, fresh water 30 HP -02 Nos, DG Set - 160 KVA (Moring Shift + Evening Shift)\n(v) Pump House No NP1& NP2 at BMC area:- Cnsisting of booster pumping set - 04 Nos (coupled with 10 HP motor-02 Nos & 7.5 HP motor-02 Nos) (Only Morning shift per day)\n(vi) Pump House No NP3 & NP4 at BMC area:- Consisting of booster pumping set - 04 Nos (coupled with 10 HP motor-02 Nos & 7.5 HP motor-02 Nos) (Morning & Night shift per day)\n(vii) Air force Pump House at BMC Area:- Consisting of centrifugal booster pump set freah water 15 HP - 02 Noss Submersible pump set 10 HP - 02 Nos Liquid Chlorine Pump Set -01 No, DG Set 160 KVA (Moring Shift + Evening Shift+ Night Shift)\n(viii) Pump House No 3 at BMC Area:- Consisting of centrifugal booster pump set fresh water 7.5 Hp -02 Nos monoblock pump set 5 HP - 01 No, Pump Set 2HP-02 Nos, DG Set 7.5 KVA - (Moring Shift + Evening Shift+ Night Shift)\n(ix) Pump House No 5and sewage Pump House at BMC Area:- consisting of booster pump set (monoblock centrifugal) coupled with 5HP motor -02 Nos and DG Set 62.5 KVA 01 No (Moring Shift + Evening Shift+ Night Shift)
21 4.02 (B) Commissiriate Road:-\n(i) Commissiriate Road Pump House :- Consisting of (a) Anti chlorinition tank (b) Anti scalent Tank (c) One RO Plant 2000 LPH (d) One ultra violet lamp (e) Two motor pump set (Moring Shift + Evening Shift)\n(C) Hastings Road:-\n(i) Hastings Road Pump House consisting of (a) Anti chlorinition tank (b) Anti scalent Tank (c) One RO Plant 2000 LPH (d) One ultra violet lamp (e) Two motor pump set(Moring Shift + Evening Shift) And One operater for night shift for both area (B) &(C) of above.\n(D) Rashpunja:-\n(i) Pump House for MAP PH-II Rashpunja area :-Consisting of (a) Anti chlorinition tank (b) Anti scalent Tank (c) One RO Plant 2000 LPH (d) One ultra violet lamp (e) Two motor pump set (Moring Shift + Evening Shift+ Night Shift)\n(ii) Sewage Pump House at rashpunja Military Camp (Sewage Treatment Plant at site C-II)(Moring Shift + Evening Shift+ Night Shift)\n(E) Sahapore:-Nil\n(F) OD Alipore:-(i) Pump Houses for MAP Ph-II & other PH at OD Alipore Are :-Consisting of (a) Booster Pump, Submersible Pimp, Centrifugal Pump, RO Plant DG Set & Iron removal plant (b) Anti scalent Tank (c) One RO Plant 2000 LPH (d) One ultra violet lamp (e) Two motor pump set (Moring Shift + Evening Shift)\nNote:-A normal all above Group of Installations / Pump House /DG Sets shall be operated in three shift per day. However, GE/Engg-in-Charge at his discretion may change the Group of Installations / Pump House /DG Sets as per requirements at site.
22 5 Outsourcing of day to day electrician(Skilled) services for attended the complained and ratifying defects of internal/external electrical for one shift of 08 hrs per day per month including reliever on Sundays & holidays at BM Camp Area, MAP Phae-II, Commissariate Road, OD ALipore and Raspunja Area as under or as per direction of Engg-in-Charge’s/GE and daily maintenance of necessary records & documents all as specified here-in-after:- \nQty- 01 no electrician(skilled) x 05 shifts per day x11 Month =55 Each calendar month per 08 hours service.\nDetails of location:-\n(A) BM Camp Area:- Internal / External Electrical maintenance of MD Accn, OTM Accn & Other buildings etc (Moring Shift + Evening Shift)\n(B) Commissiriate Road:-Internal / External Electrical maintenance of MAP PH-II & New Building MRS (Moring Shift + Evening Shift)\n(C) Hastings Road:- Nil\n(D) Rashpunja:- Nil\n(E) Sahapore:-Internal / External Electrical maintenance of MD Accn & OTM Accn (Moring Shift)\n(F) OD Alipore:- Nil\n\n\n\n\n\n\n\n\n
23 5.01 Wages including Variable Dearness Allowance BI0F2021E18R0C01I015 55 Each calender month
24 5.02 EPF Contribution of employer BI0F2021E18R0C01I016 55 Each calender month
25 5.03 ESIC Contribution of employer BI0F2021E18R0C01I017 55 Each calender month
26 5.04 Bonus Contribution of employer BI0F2021E18R0C01I018 55 Each calender month
27 5.05 Labous Welfare cess BI0F2021E18R0C01I019 55 Each calender month
28 5.06 GST BI0F2021E18R0C01I020 55 Each calender month
29 5.07 Contractors overhead & profit BI0F2021E18R0C01I021 55 Each calender month
30 5.08 Total quoted unit rate of above item.\n
31 6.01 Notes for item no 2 to 5.08:- (a) Amount of bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e proof of account payment. Similarly items/sub-items of ‘contribution towards EPF’ and ‘contribution towards ESIC’ shall also be payable after submission of valid & authentic document in support of proof of payment.\n(b) Irrespective of quoted rate against wage here-in-above , the tenderer/bidder shall be liable to pay unit quoted wage or minimum wages (as mention in Sch ‘A’note) whichever is higher to employee. Similarly the tenderer/bidder shall be liable to deposite/pay employer contribution towards EPF , employer contribution towards ESIC, Bonus quoted rate or liable amount as per Govt notification whichever is higher.
32 6.02 (c) DUTY TIME :- A normal working time of 08 hour shift as mentioned in PS. However, GE/Engg-in-Charge at his discretion may change the shift timings as per requirements and 1 shift or 2 shift installation may be late-night hours. The shift of 08 hours shall be continuous. The quoted rate shall be deemed to take into account such situations.B34\n(d) Operator will take all preventive measures as per code of practise of EI Rules as well as they should be insured for accident as per labour laws. The Department will not be responsible for any type of incident.\n(e) All the safety equipments and tools related to workmanship shall be provided by contractor without any extra cost. Contractor shall be provide T & P such as (Pipe wrench, pliers, line tester, test lamp, clamp meter) two set of uniforms to every operator, one No first aid box, cotton waste, wipping cloths to each installation under contract schedule, required log sheets of pumping sets and DG sets of all installations and sweeping instruments and the cost thereof deemed to be included in above quoted rate.\n(f) FGM & FGM Mate shall be Skilled & Semi Skilled respectively.\n(g) The term & condition as specified in Sch 'A' Note & PS of tender document. Accordingly bidder should quoting their offer.\n(h) Unit rate shall be quoted one Fitter General Mechanic / Fitter General Mechanic Mate/Electrician per 08 hour service per Day for one calendar month.\n(i)The operator should have own conveyance and communication system like mobile etc.\n
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2020 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail