| 1 | 1 | Earth work in 1.excavation by manual means over areas (exceeding 30cm and up to 1.5 mtr in depth,1.5 mtr in width as well as 10 sqm on plan) Including disposal of excavated earth up to 1mtr.from cutting edge, disposed earth is to be leveled and neatly dressed in All kinds of soils | | 2.04 | Cum |
|---|
| 2 | 2 | Providing & laying in position cement concrete of specified grade excluding the cost of centring & shuttering -All work up to plinth level. 1:5:10 Cement: 5 Coarse sand: 10graded stone agg. 40mm nominal size).. Crushed | | 0.12 | Cum |
|---|
| 3 | 3 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. | | 126.07 | Kg |
|---|
| 4 | 4 | Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work up to plinth level.1:2:4(1Cement: 2 Coarse sand: 4 graded stone agg. 20mm nominal size). | | 1.06 | Cum |
|---|
| 5 | 5 | Providing under layer including preparation of ground 75mm thick (un compacted) layer of dry stone aggregate & grouted with sand. (Complete Job). | | 3.01 | Cum |
|---|
| 6 | 6 | Providing & laying in position cement concrete of specified grade excluding the cost of centring & shuttering -All work up to plinth level. 1:3:6(1 Cement: 3 Coarse sand: 6graded stone agg. 20mm nominal size) Crushed | | 6.37 | Cum |
|---|
| 7 | 7 | Brick work with common burnt clay F.P.S (non – modular) bricks of class designation 75 in Foundations & plinth in cement mortar 1:6 (1 cement: 6 coarse sand).\nExtra for brick work in super structure above plinth level up to floor V level(by manual means)\n | | 7.97 | Cum |
|---|
| 8 | 8 | Providing & laying RCC M-15 grade concrete with 20 mm Agg size including covering but excluding from work. | | 1.27 | Cum |
|---|
| 9 | 9 | Centring & shuttering (form work ) including strutting propping etc. & removal of form for:foundations, footings, bases of columns etc for mass concrete | | 46.28 | Sqm |
|---|
| 10 | 10 | Centring and shuttering including strutting propping etc. and removal of form work for ; \n• Columns, piers, abutments, pillars, posts and struts.\n | | 11.15 | Sqm |
|---|
| 11 | 11 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | | 25.06 | Sqm |
|---|
| 12 | 12 | 12mm Cement plaster of mix. 1:6 (1cement :6Fine sand) | | 151.21 | Sqm |
|---|
| 13 | 13 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand :4 graded stone aggregate 20mm nominal size). Crushed | | 39.45 | Sqm |
|---|
| 14 | 14 | Steel work welded in built up section / framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. Ingratings, frames, guard bar, ladders, railing, brackets, gates and similar works | | 122.5 | Kg |
|---|
| 15 | 15 | Providing & fixing & hoisting of name board including writing & painting (completed job) | | 34 | Sft |
|---|
| 16 | 16 | Providing & fixing G.I pipe complete with G.I fittings and clamps including cuttings and make good the walls etc (external Work\n15 mm dia nominal bore (medium) \n | | 20 | Mtr |
|---|
| 17 | 17 | providing &fixing of brass bib cock of approved quality\n15mm nominal bore\n\n | | 6 | No. |
|---|
| 18 | 18 | Providing and fixing of innaugration stone complete job as per direction engineer-in charge. | | 1 | No. |
|---|
| 19 | 19 | Carriage of materials by mechanical transport including loading / unloading & stacking complete \n? Sand for an average distance of 5 kms.\n | | 10 | Cum |
|---|
| 20 | 20 | Carriage of materials by mechanical transport including loading / unloading & stacking complete \n\n? Stone aggregate below 40mm Nominal size Crushed for an average distance of 10 kms.\n | | 8.45 | Cum |
|---|
| 21 | 21 | Carriage of materials by mechanical transport including loading / unloading & stacking complete \n\n? Brick for an average distance of 15 kms\n | | 3785 | No. |
|---|