Construction Of Rcc Tank Near Dg Building , Gingle

Key Value

Document Fees
INR 590 /-
EMD
INR 15000.0 /-
Tender Value
INR 7.27 Lakhs /-

BOQ Items

Name of Work: Construction of RCC Tank near DG Building, Gingle
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.: All kinds of soil. 31.99 Cum
2 2 Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. 23.75 Sqm
3 3 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) 2.47 Cum
4 4 Providing and laying in position specified grade of Reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 5.43 Cum
5 5 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centring, shuttering, furnishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 16.2 Cum
6 6 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 3 Cum
7 7 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. 2709.3 Kg
8 8 Centring and shuttering including strutting, propping etc. and removal of form for Foundations: footings, bases of columns etc. for mass concrete. 8.49 Sqm
9 9 Centring and shuttering including strutting, propping etc. and removal of form for wall any thickness including attached pilasters buttresses, plinth and string courses etc. 132.22 Sqm
10 10 Centring and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. 14.79 Sqm
11 11 Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls. Under 20cms wide 18.9 RM
12 12 Supplying and fixing C.l. cover without frame for manholes: 455x610mm rectangular C. I. cover (light duty) the weight of the cover to be not less than 23 kg. 3 Each
13 13 Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. (external work)Providing and fixing G.I. pipes complete with G.I. fittings. 100 mm dia. nominal bore Medium 10 RM
14 14 Providing and fixing C.l. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). 100 mm dia - Class I 2 Each
15 15 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) 49.2 Sqm
16 16 Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and Pointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete 67.76 Sqm
17 17 Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS: 15622 of approved make, laid on 20 mm thick bed of cement mortar 1: 4 ( 1 cement : 4 coarse sand) including pointing the joints with white cement and matching pigment etc., complete. In colour such as White, Ivory, Grey, Fume Red Brown 15.6 Sqm
18 18 Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. (1 kg of water proofing material in 50 kg of cement) 197.04 Kg
19 19 GST@18% 59 1 Lot
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail