South Central Railway has published Guntakal Division -Renigunta-Guntakal Section -Through Formation Treatment (Tftr):- Rehabilitation Weak Formation With Blanketing Material To Rdso-Ge-0014 Specifications Along With Geo Textile For A Length Of 4.10 Km Between Regadipalli And Juturu Statins. Submission Date for this Tender is 19-11-2020. Track Work Tenders in Andhra Pradesh. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item Code | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding Unit |
1 | Schedule A-USSR | 1484102.43 | Above/\rBelow/Par | ||||||
2 | 01 | 013140 | 13035.00 | cum | 74.36 | 969282.60 | AT Par | 969282.60 | |
3 | Description:- Removal of excavated/slip earth/ debris/ malba from the site of works to any other place outside\rRailway land/premises, including all excavations, handling, re-handling, loading, unloading and leading, etc. all\rlabour and material as a complete job. Removal of Earth (all kinds of soils)/ROCKS, BOULDERS including\rmud/slush, slipped earth in catch water drains, side drains, over berms in cutting, water way of bridges, over\rcoping of toe/breast/retaining walls etc. including crossing of nallah, railway tracks, making/repairing approach\rroads if required, all lead, lift, ascent, descents, or any other obstruction. Earth spoils to be dumped outside the\rcutting or railway embankments as per direction of Engineer in charge | ||||||||
4 | 02 | 011011 | 49.00 | cum | 100.28 | 4913.72 | AT Par | 4913.72 | |
5 | Description:- Earth work in excavation as per approved drawings and dumping at embankment site or spoil\rheap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of\rexcavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in\rlayers of 1.5m each, including incidental work, as per specifications-in All kinds of soils | ||||||||
6 | 03 | 031012 | 49.00 | cum | 1865.68 | 91418.32 | AT Par | 91418.32 | |
7 | Description:- Providing and laying in position cement concrete of specified proportion excluding cost of cement,\rcentering and shuttering - All works upto Plinth level : 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm\rnominal size) | ||||||||
8 | 04 | 222030 | 77.00 | cum | 701.70 | 54030.90 | AT Par | 54030.90 | |
9 | Description:- Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift,\rtools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer incharge in\rcase loose slush is encountered at site of foundation before casting the foundation or before laying the filtering\rmedia | ||||||||
10 | 05 | 014110 | 4100.00 | Metre | 86.00 | 352600.00 | AT Par | 352600.00 | |
11 | Description:- Providing and removing barricading with the help of portable fencing along the running track where\rthe work is to be done in close vicinity of the track. Fencing shall consist of self supporting steel angles of size 50\rx50x6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23x0.23x0.23M placed\rat c/c distance of 2.0 M along the track. 12 mm dia rods in three horizontal layers tack welded with the angle\rposts including providing Retro-reflective tapes in Horizontal & vertical direction. Note : Released material will be\rthe property of the contractor after the completion of work. Cost of cement to be paid separately. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy