}

Supply Installation Testing And Commissioning Of Audio , Video Recording Equipments In Interrogation Room At New Building Of Anti Corruption Bureau Jaipur ., Ajmer-Rajasthan

Rajasthan Police Housing & Construction Corporation Limited has published Supply Installation Testing And Commissioning Of Audio , Video Recording Equipments In Interrogation Room At New Building Of Anti Corruption Bureau Jaipur .. Submission Date for this Tender is 26-10-2020. Audio Conferencing System Tenders in Ajmer Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

25799596
Supply Installation Testing And Commissioning Of Audio , Video Recording Equipments In Interrogation Room At New Building Of Anti Corruption Bureau Jaipur .
Open Tender
Indian
Rajasthan
Ajmer
26-10-2020

Tender Details

Supply Installation Testing And Commissioning Of Audio , Video Recording Equipments In Interrogation Room At New Building Of Anti Corruption Bureau Jaipur .

Key Value

Document Fees
INR 500 /-
EMD
INR 8800.0 /-
Tender Value
INR 8.80 Lakhs /-

BOQ Items

Name of Work :
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 1 100 P.Cum.
2 2 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 2 100 P.Cum.
3 3 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 3 100 P.Cum.
4 4 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 4 100 P.Cum.
5 5 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 5 100 P.Cum.
6 6 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 6 100 P.Cum.
7 7 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 7 100 P.Cum.
8 8 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 8 100 P.Cum.
9 9 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 9 100 P.Cum.
10 10 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 10 100 P.Cum.
11 11 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 11 100 P.Cum.
12 12 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 12 100 P.Cum.
13 13 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 13 100 P.Cum.
14 14 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 14 100 P.Cum.
15 15 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 15 100 P.Cum.
16 16 Earth work in filling of Excavated earth except back cotton soil with watering and compaction of spreaded earth in 15-30 cm layers leveled and neatly dressed as per requirement of site and direction of engineer in charge, work includes cost of earth with taxes, loading , unloading, transporation labour, water and T&P etc. complete with all lead and lift 16 100 P.Cum.
17 17 lifting of existing door lintel up to a required height with care by applying scaffolding to hold the stone patties etc, load of building or wall and refixing of stone lintel excluding the cost of stone lintel & making the same good with dismentling of existing chhajjas & stone chhajjas be paid separately including the grooves for some chhajjas and any holes etc. required with T&P, labour, all scaffolding complete as per direcation of Engineer incharge. 17 4 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail