| 1 | 1 | PART-I OPERATION AND MAINTENANCE OF E/M INSTALLATIONS | | | |
|---|
| 2 | 2 | Operation and Maintenance of sewage Treatment plant at Arjan vihar STP of capacity 800 KLD by deploying experienced qualified one skilled operator/staff, round the clock including Sunday and holidays in three shifts per day of 08 hours each ( Ist shift from 0600 to 1400 hours,IInd shift from 1400 to 2200 hours and IIIrd shift from 2200 to 0600 hours) complete inclusive of daily, weekly , monthly, quarterly, Half yearly & Yearly maintenance of equipments. scope of work as described in notes given below complete all as specified and as directed . | | | |
|---|
| 3 | 3 | Operation and Maintenance of sewage Treatment plant at Kabul Line STP of capacity 300 KLD by deploying experienced qualified one skilled operator/staff, round the clock including Sunday and holidays in three shifts per day of 08 hours each ( Ist shift from 0600 to 1400 hours,IInd shift from 1400 to 2200 hours and IIIrd shift from 2200 to 0600 hours) complete inclusive of daily, weekly , monthly, quarterly, Half yearly & Yearly maintenance of equipments. scope of work as described in notes given below complete all as specified and as directed . | | | |
|---|
| 4 | 4 | Rates required to be quoted for executing the work as describrd in Srl.No. 2 to 3 here-in-before:- | | | |
|---|
| 5 | 4.01 | Worker's wage per person as per existing rules \n | | 1980 | Per Shift |
|---|
| 6 | 4.02 | Employees Provident Fund as mentioned in the tender documents | | 1980 | Per Shift |
|---|
| 7 | 4.03 | Employees State Insurance Contribution as mentioned in the tender documents\n | | 1980 | Per Shift |
|---|
| 8 | 4.04 | Contribution of Bonus as mentioned in the tender documents \n | | 1980 | Per Shift |
|---|
| 9 | 4.05 | Over head & profit on srl No 3.01 to 3.04\n | | 1980 | Per Shift |
|---|
| 10 | 4.06 | LWC as mentioned in the tender documents \n | | 1980 | Per Shift |
|---|
| 11 | 5 | Notes for Srl No. 2 to 3 :- The quoted rate against EPF, ESIC and Bonus shall be considered for payment on actual basis. Contribution towards EPF, ESIC and Bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount to the workmen, ie proof of payment | | | |
|---|
| 12 | 6 | Scope of Work for srl no. 2 to 3 comprises:-\n(i) Stacking the sludge cakes properly\n(ii) Cleaning the blockages in any pump/pipe line\n(iii) Supplying/distributing the treated water regularly as per the directions.\n(iv) Complete cleaning of grits and channels daily.\n(v) Brooms and cleaning materials will be arranged by the contractor \n(vi) During the cleaning safety equipments will be supplied/arranged by the contractor. | | | |
|---|
| 13 | 7 | (vii) POL will be collected from MES store yard under Sch B free for use ,by the contractor at his own arrangements.For record purposes PRRB shall be maintained.\n(viii) Removing the algae/ sludge in the tube settler and keeping the surrounding area clean daily and removing vegetations etc failing which recovery of Rs. 200/- per day shall be made.\n(ix) Mixing of the chemicals as directed . | | | |
|---|
| 14 | 8 | Notes for srl No 2 to 3 :- EQUIPMENTS TO BE MAINTAINED :- (i) Bar screen chamber (ii) MBBR reactor (iii) Air blower (iv) Tube settler (v) Filter feed Pump (vi) Filteration system (vii) Feed pump and raw water sewage pump (viii) Inter connecting pipes (ix) Chlorine contact tank/ hypo Dosing tank (x) Valves (xi) Sludge drying bed (xii) Electrical system and DB/ panel (xiii) Oil and grease trap (xiv) Raw water collection sump (xv) Installed machinary for treated water supply (xvi) Treated water tank installed with STP (xvii) Mixing of chemical as reqd (xviii) Sewage well with pump.(xviii) DG Set | | | |
|---|
| 15 | 9 | Notes for srl No 2 to 3 :-\nMaintaining the following records :- (i) Record of chemical consumption.\n(ii) Record of treated water and electricity consumption (log sheet)\n(iii) Record of DG set daily running (log sheet)\n(iv) Record of water meter reading | | | |
|---|
| 16 | 10 | Notes for srl No 2 to 3:- (i) The Plant shall be run by the skilled operator minimum qualification ITI/ matric with minimum three year experience. Non submission of police verification with ID proof of operator(s), a panel recovery of Rs. 1000/- per person per month shall be made. | | | |
|---|
| 17 | 11 | (ii) (a) Working hours of a particular team of workers shall not exceed 08 hrs per day and no workmen shall be allowed to work beyond 08 hrs per day.\n(b) In case the contractor fails to deploy requisite numbers of workmen, the operator / workmen against defficiency shall be deployed at risk and cost of the contractor through SPOT QUOTATION and no payment shall be made to the contractor for the shift involved.\n(c) In addition to above a recovery of Rs. 500 per shift per workman shall be made from contractor's dues as and when becomes due.\n(d) Duty roster of manpower deployed shall be displayed otherwise recovery of Rs 500/- per installation per day shall be made. | | | |
|---|
| 18 | 12 | (iii) All the provisions of contract labour Act 1970 shall be strictly adhered to.\n(iv) For payment of minimum wages to the workers provisions of particular specifications shall be strictly adhered to.\n(v) Log sheet for records shall be supplied by the contractor after approval of format by GE/Engineer-in-charge. | | | |
|---|
| 19 | 13 | (vii) Chemicals, Diesel and engine oil for DG set shall be issued under Sch 'B' as free for Use . | | | |
|---|
| 20 | 14 | (viii) Contractor shall ensure that treated sewage water shall confirm to the following characteristics:-\n (i) TSS : < 10 mg/litre\n (ii) BOD : < 10 mg/litre\n (iii) COD : < 150 Mg/litre\n (iv) ph : 6.5 - 8.5\n (v) Total Coliform : < 100 MPN/100 ml (desired nil)\n (vi) Residual CI < 1 mg/litre\n | | | |
|---|
| 21 | 15 | Notes for srl No 2 to 3 :- (A) The rate quoted by the contractor shall also deemed to be included for all the aspects mentioned here-in-after.\n(B) (i) The tenderer shall upload and submit original copy of MOU executed / made with OEM such as M/s Hydrotech paryavaran India Pvt Ltd or M/s ION Exchange or M/s Fontus or M/s Thermax or M/s SIMA Labs Pvt Ltd or any other E-in-C’s approved firm in the office of GE(U) water supply, Delhi Cantt-10 before the scheduled bid opening date. \n(ii) The MOU shall be executed / made as per specimen MOU given at srl No 15 here-in-after.\n(iii) Please note that in absense of MOU executed as per specimen MOU, price bid will not be opened. | | | |
|---|
| 22 | 16 | Specimen of MOU (For srl No 2 & 3) \n We, M/s [Name of the OEM] do hereby undertake the followings:- \n (i) STP will be operated and maintained under guidance & supervision of our experts and it will be ensured that plant is run by skilled workmen.\n (ii) We will inspect the plant monthly and submit the report for the efficient functioning of the plant.\n (iii) We will ensure that the test result of the treated water comply with the paramenters given in the contract agreement.\n (iv) We will provide commited technical support in the advert of any requirement of the same and proper operator training will be provided in order to run the plant effectively.\n (v) We will provide the details/ estimates of the chemicals required for the sewage treatment plant.\nNote :-\n (a) Inspection report of OEM shall be enclosed with each payment details, failing which no payment shall be made to the contractor.\n (b) The contractor's rates shall be deemed to be included for above aspect. Nothing extra shall be paid on this account. | | | |
|---|
| 23 | 17 | PART-II REPAIR OF VARIOUS STP's UNDER AGE (U) W/S-II | | | |
|---|
| 24 | 18 | Carrying samples for Testing of treated water of STP ,submission of detailed test report to the office of the Engineer-in-charge and testing in NABL approved laboratory as approved by GE.\nDetails are as under :-\n (a) Carrying out minimum essential testing of water as per IS 10500 of 1991 mandatory for chemicals, colour, odour, PH value, TSS, BOD, COD, Total residual chlorine, total Nitrogen, Sulphate, oil and grease , Ammonical Nitrogen (NH3-N) and Bacteriological total coliform organisms per 100 ml (MPN) and E colliie in 100 ml.\n(i) TDS: < 2100 Mg/ ltrs\n(ii) BOD : < 10 Mg/ ltrs\n(iii) COD :< 150 mg / Ltrs\n(iv) Ph : 6.5-8.5\n(v) Total coliform : ,< 100 MPN/100 Ml (desired Nil)\n(vi) Residual CI > 1 mg/ Ltr\n(vii) oil and grease : < 10 Mg/Ltrs\n(viii) Turbidity :< 2 NTU\n(ix) colour less and odour less \nRest of the charatoristics of the treated water shall be as per IS : 10500-1991\nNote:- Rate quoted shall deemed to be included for :-\n(i) Cost of sterilised bottle as required\n(ii) To and fro transportation charges for collection of sample\n | | 22 | Each |
|---|
| 25 | 19 | Testing of Sewage water as per relevant IS of STP , submission of detailed test report to the office of the Engineer-in-charge and testing in NABL approved laboratory as approved by GE\n Details are as under :-\n(a) Carrying out minimum essential testing of sewage water as per revlevant IS mandatory for chemical, odour, PH Value, TSS, BOD,COD total nitrogen, sulphate, oil and grease ammonical Nitrogen (NH3-N) and Bacteriological total collifrom organisms and other charaterstics as per relevant IS of sewage water.\nNote:- Rate quoted shall deemed to be included for :-\n(i) Cost of sterilised bottle as required\n(ii) To and fro transportation charges for collection of sample | | 22 | Each |
|---|
| 26 | 20 | Supply and installation of flanged ends Water Meter woltman type, Class 'B' of following sizes including testing and making good connection with flanged ends, with gasket rubber sheet and nut & \nbolts etc ISI Marked fixing in horizontal/inclind/vertical position, including taking out unserviceable water meter complete all as directed at site by the Engineer-in-Charge. \n\n | | | |
|---|
| 27 | 20.01 | (a) 50 mm bore | | 1 | EACH |
|---|
| 28 | 20.02 | (b) 100 mm bore | | 1 | EACH |
|---|
| 29 | 20.03 | (c) 150 mm bore | | 1 | EACH |
|---|
| 30 | 21 | Material and labour for painting on steel and iron surfaces with one coat of synthetic enamel paint as per existing colour scheme or pattern after preperation of old painted surface of any description over 10cm in width or girth complete all as specified and directed. | | 100 | SQM |
|---|
| 31 | 22 | Periodical Cleaning of Sewage and removing of settled down Sewage sludge cum mud/De-Silting etc STP for Equalization tank of capacity upto 270 CUM complete all as specified and as directed. \n | | 4 | EACH \nJOB |
|---|
| 32 | 23 | Periodical Cleaning of Sewage well and removing of settled down Sewage sludge cum mud/De-Silting etc of Sewage Well of size 7.5 mtr deep x 5 mtr dia complete all as specified and as directed. \n | | 4 | EACH \nJOB |
|---|
| 33 | 24 | Notes for srl item Nos 22 & 23 :- Rate quoted shall include the aspects:- \n(i) Diesel Driven Pump Set of appropriate capacity not less than 5/7.5 HP with operator including necessary POL required at site for De-Watering of Sewage septic water including PVC heavy duty flexible hose pipe for suction and delivery purposes .\n(ii) Tractor mounted storage tank of appropriate capacity not less than 1 KL with driver directly collected from the soak well and disposing the same to the location where approved by the Delhi Canttonment Board/PCB .\n(iii) Sewage Sludge disposable tractor/truck with driver and POL required for the same (duly covered with necessary tarpaline ) and disposing the same to the location where approved by the Delhi Canttonment Board/PCB | | | |
|---|
| 34 | 25 | (iv) Labour element and T&P required for removal of settled down sewage sludge/mud inside the sewage tank for scooping out from inside and below the septic/staining sewage water inside the well and lifting the same and deposited on top and near by the sewage tank where directed and further to removal the same where approved by the Delhi Canttonment Board/PCB.\n(v) Appropriate qty of Phenyle required at site for Sterilization of sewage sludge being collected in the Sewage tank as directed. \n(vi) Necessary Oxygen Mask, Gloves, Gum Boot and all other safety aspects and including necessary Phawda, Steel Bucket, Manila rope etc. required at site as directed. | | | |
|---|
| 35 | 26 | Material and labour for cleaning of treated water tank of storage capacity 300000 ltrs, filter feed tank of capacity 69 Cum, chlorine contract tank of capacity 17 Cum thoroughly by removing mud, grits etc from STP complete all as specified and as directed..\nLoc:- Baird place, Arjan Vihar, Kabul line,\nNote:- (a) Cleaning inner surface of tank complete by scraping with steel wire brush and removing mud and sludge collected inside the tank manually at a distance not exceeding 50 mtr all as directed.\n (b) Washing with clean water and bleaching powder complete tank internally and removel of left out sludge if any at site at a distance not exceeding 50mtr all as directed. | | 4 | EACH \nJOB |
|---|
| 36 | 27 | Taking down existing LED street light fitting, model SLE UL, 90 Watts IP 66 LXN for servicing, calliberation and repair of CC LED driver (PCB) with input voltage 240 V AC 50 Hz and output voltage 21-36 V DC, 2.30 amp and refixing in position by providing LED 90 watts to make it fully functional complete all as specified and as directed.\n | | 6 | EACH \n |
|---|
| 37 | 28 | Supply and fixing LED tube light fitting integral type suitable for 1 x 18 watts, 230 volts, connector block etc with all accessories internally prewired and including connecting with twin core flexible copper cable of suitable size including taking down/out fitting as existing at site complete all as specified and directed.\n | | 10 | EACH \n |
|---|
| 38 | 29 | PART-III Sch of Credit to be quoted by Contractor | | | |
|---|
| 39 | 30 | Old U/S water Meter 50 mm | | 1 | EACH \n |
|---|
| 40 | 31 | Old U/S water Meter 100mm | | 1 | EACH \n |
|---|
| 41 | 32 | Old U/S water Meter 150mm | | 1 | EACH \n |
|---|
| 42 | 33 | Old u/s LED Driver | | 6 | EACH \n |
|---|
| 43 | 34 | Old u/s LED Fittings | | 10 | EACH \n |
|---|
| 44 | 35 | Notes for srl No. 30 to 34 :- Rate quoted in column 6 shall not be less than the estimated cost inserted by MES under column 5. In case bidder quotes rates less than the corresponding rate under column 5, the rate quoted shall be amended as per column 5 and total amount shall be amended accordingly. | | | |
|---|