}

Major Maintenance Of Ash Handling Plant Unit 1 To 6 And Bottom Ash System Of Unit 9 And 10 . , CPP, NALCO, ANGUL-Odisha

National Aluminium Company Limited-NALCO has published Major Maintenance Of Ash Handling Plant Unit 1 To 6 And Bottom Ash System Of Unit 9 And 10 . . Submission Date for this Tender is 17-11-2020. Ash Handling Machine Tenders in CPP, NALCO, ANGUL Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

25782064
Major Maintenance Of Ash Handling Plant Unit 1 To 6 And Bottom Ash System Of Unit 9 And 10 .
Open Tender
Indian
Odisha
CPP, NALCO, ANGUL
17-11-2020

Tender Details

Major Maintenance Of Ash Handling Plant Unit 1 To 6 And Bottom Ash System Of Unit 9 And 10 .

Key Value

Document Fees
INR 500 /-
EMD
INR 80000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: MAJOR MAINTENANCE OF ASH HANDLING PLANT UNIT #1 TO 6 AND BOTTOM ASH SYSTEM OF UNIT #9 AND 10.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 SCRAPPER CONVEYOR CHANGE, AS PER SCOPE OF WORK. 1 each
2 2 RETURN IDLER/HEAD SHAFT ASSY MAINTENANC, AS PER SCOPE OF WORK. 1 SET
3 3 TAIL GUIDE /GUIDE WHEEL ASSY MAINTENANCE, AS PER SCOPE OF WORK. 1 each
4 4 REPLACEMENT OF C.I LINER OF S.C, AS PER SCOPE OF WORK. 1 each
5 5 S.C CHAIN & CHAIN CONNECTOR MAINTENANCE, AS PER SCOPE OF WORK. 1 each
6 6 REPLACEMENT OF TOTAL LINK CHAINS OF S.C, AS PER SCOPE OF WORK. 1 each
7 7 REPLACEMENT OF SCRAPPER BAR, AS PER SCOPE OF WORK. 1 each
8 8 REPLACEMENT OF SPROCKET TEETH, AS PER SCOPE OF WORK. 1 each
9 9 O.H OF S.C/C.G/3 RD PUMP /GEAR BOX, AS PER SCOPE OF WORK. 1 each
10 10 S.C SPRAY HEADER MAINTENANCE, AS PER SCOPE OF WORK. 1 each
11 11 S.C BASE WHEEL MAINTENANCE, AS PER SCOPE OF WORK. 1 each
12 12 S.C SIDE DOORS MAINTENANCE, AS PER SCOPE OF WORK. 1 each
13 13 BREAK DOWN MAINTENANCE OF S.C, AS PER SCOPE OF WORK. 1 each
14 14 C.G BEARINGS & GLAND HOUSING MAINT, AS PER SCOPE OF WORK. 1 each
15 15 C.G ROLLERS & LINERS REPLACEMENT, AS PER SCOPE OF WORK. 1 SET
16 16 C.G CHOCKING REMOVAL, AS PER SCOPE OF WORK. 1 each
17 17 C.G ASSEMBLY REPLACEMENT, AS PER SCOPE OF WORK. 1 each
18 18 S C / C G PREVENTIVE MAINT, AS PER SCOPE OF WORK. 1 Times
19 19 REPLACEMENT OF BIFURCATING CHUTE OF C.G, AS PER SCOPE OF WORK. 1 each
20 20 REPAIR OF BIFURCATING CHUTE, AS PER SCOPE OF WORK. 1 each
21 21 M. D/R.P /F.C OF S.C/C.G REPLACEMENT, AS PER SCOPE OF WORK. 1 SET
22 22 F.C.U SERVICING (SIZE :10.5/11.5), AS PER SCOPE OF WORK. 1 each
23 23 P M OF B.A.H DISCHARGE GATE, AS PER SCOPE OF WORK. 1 each
24 24 REPLACEMENT OF DISCHARGE GATE, AS PER SCOPE OF WORK. 1 SET
25 25 QUENCHING NOZZLE MAINTENANCE, AS PER SCOPE OF WORK. 1 each
26 26 SEAL TROUGH CLEANING, AS PER SCOPE OF WORK. 1 each
27 27 TRENCH JETTING NOZZLE BODY MAINT, AS PER SCOPE OF WORK. 1 each
28 28 S. C /TRENCH CHOKING REMOVAL, AS PER SCOPE OF WORK. 1 each
29 29 B.A.H CHOCKING REMOVAL / CLEANING, AS PER SCOPE OF WORK. 1 each
30 30 REPLACEMENT F. A (ESP & APH), AS PER SCOPE OF WORK. 1 each
31 31 REPAIR OF FLUSHING APPARATUS, AS PER SCOPE OF WORK. 1 each
32 32 FAB.& ERE. OF DISCHARGE PIPE, AS PER SCOPE OF WORK. 1 each
33 33 OVERHAULING OF R.V. FEEDER, AS PER SCOPE OF WORK. 1 each
34 34 P M OF R V FEEDER, AS PER SCOPE OF WORK. 1 each
35 35 REPLACEMENT OF RV FEEDERS CHAIN, AS PER SCOPE OF WORK. 1 each
36 36 BEARING POINT GREASING OF R V F/S W P, AS PER SCOPE OF WORK. 1 SET
37 37 GASKET/‘O’RING CHANGING OF RV FEEDER, AS PER SCOPE OF WORK. 1 SET
38 38 FOREIGN MATERIALS REMOVAL FROM R.V.F, AS PER SCOPE OF WORK. 1 each
39 39 GASKET PACKING REPLACEMENT, AS PER SCOPE OF WORK. 1 each
40 40 EXPANSION BELLOW REPLACEMENT, AS PER SCOPE OF WORK. 1 each
41 41 REPLACEMENT OF RV FEEDERS SPROCKET WHEEL, AS PER SCOPE OF WORK. 1 each
42 42 LEAKAGE ARREST OF ESP, AS PER SCOPE OF WORK. 1 SET
43 43 F. BOX L.P PIPE LINE 2 LOOP FAB/ERE, AS PER SCOPE OF WORK. 1 each
44 44 F. BOX L.P PIPE LINE 3 LOOP FAB/ERE, AS PER SCOPE OF WORK. 1 each
45 45 NOZZLE TIP CHECKING, AS PER SCOPE OF WORK. 1 each
46 46 FLUSHING APPARATUS CLEANING, AS PER SCOPE OF WORK. 1 each
47 47 TRENCH CLEANING, AS PER SCOPE OF WORK. 1 each
48 48 PLATE VALVE SERVICING (ESP/ECO/APH), AS PER SCOPE OF WORK. 1 each
49 49 PLATE VALVE CLOSING/OPENING, AS PER SCOPE OF WORK. 1 each
50 50 ECO HOPPER F A REPLACEMENT, AS PER SCOPE OF WORK. 1 each
51 51 O H OF HP/LP PUMP, AS PER SCOPE OF WORK. 1 each
52 52 P M OF HP/LP PUMP, AS PER SCOPE OF WORK. 1 each
53 53 GLAND PACKING REPLACEMENTOF PUMPS, AS PER SCOPE OF WORK. 1 each
54 54 O H ASH SLURRY PUMP, AS PER SCOPE OF WORK. 1 each
55 55 PM OF ASH SLURRY PUMP, AS PER SCOPE OF WORK. 1 each
56 56 DE/NDE OIL SEAL REPLACEMENT A.S P, AS PER SCOPE OF WORK. 1 each
57 57 V-BELTS REPLACEMENT/TIGHTENING OF A.S.P, AS PER SCOPE OF WORK. 1 each
58 58 BUILT UP OF WORN OUT PARTS OF A S P, AS PER SCOPE OF WORK. 1 Kilogram
59 59 PUMP PULLEY BOLT TIGHTENING & ALIGNMENT, AS PER SCOPE OF WORK. 1 each
60 60 PUMP PULLEY BOLT TIGHTENING, AS PER SCOPE OF WORK. 1 each
61 61 A S P SUCTION BEND CHOCKING REMOVAL, AS PER SCOPE OF WORK. 1 each
62 62 OIL CHANGE OF PUMPS/G.BOX/FC/OIL TANK, AS PER SCOPE OF WORK. 1 each
63 63 OVERHAULING OF SUMP PUMP, AS PER SCOPE OF WORK. 1 each
64 64 SUMP PUMP'S PIT CLEANING, AS PER SCOPE OF WORK. 1 each
65 65 S.W.P PUMP OVERHAULING, AS PER SCOPE OF WORK. 1 each
66 66 S.W.P BRG & SLEEVE REPLACEMENT, AS PER SCOPE OF WORK. 1 each
67 67 ASH SLURRY SUMP PIT CLEANING, AS PER SCOPE OF WORK. 1 each
68 68 M.S./C.I. BEND/LATERAL/Y PIECE REPLACEME, AS PER SCOPE OF WORK. 1 each
69 69 MAINT OF VALVES OF ASH SLURRY LINE, AS PER SCOPE OF WORK. 1 each
70 70 CLOSE/OPEN OF SLURRY LINE PLATE VALVE, AS PER SCOPE OF WORK. 1 each
71 71 SLEEVE COUPLING MAINT, AS PER SCOPE OF WORK. 1 each
72 72 FLOAT LEVEL INDICATOR MAINT, AS PER SCOPE OF WORK. 1 each
73 73 SUMP ISOLATION PLUG VALVE SERVICING, AS PER SCOPE OF WORK. 1 each
74 74 SUCTION SPOOL PIPE REPLACEMENT OF ASP, AS PER SCOPE OF WORK. 1 each
75 75 DUMMY PLATE CHANGE OVER, AS PER SCOPE OF WORK. 1 each
76 76 ASPH SUCTION LINE DUMMY PLATE FITTING, AS PER SCOPE OF WORK. 1 each
77 77 SERVICING OF OVER HEAD CRANE, AS PER SCOPE OF WORK. 1 each
78 78 FABRICATION & ERECTION OF PIPING SYSTEM, AS PER SCOPE OF WORK. 1 Meter
79 79 DISMANTLING & REMOVAL OF PIPING SYSTEM, AS PER SCOPE OF WORK. 1 Meter
80 80 VALVES REPAIR/REPLACEMENT, AS PER SCOPE OF WORK. 1 each
81 81 REPLACEMENT OF VALVE & NRV, AS PER SCOPE OF WORK. 1 each
82 82 WELDING, AS PER SCOPE OF WORK. 1 Meter
83 83 GAS CUTTING, AS PER SCOPE OF WORK. 1 Meter
84 84 PAINTING WITH SYNTHETIC ENAMEL PAINT, AS PER SCOPE OF WORK. 1 Square meter
85 85 PAINTING WITH CHLORO RUBBER PAINT, AS PER SCOPE OF WORK. 1 Square meter
86 86 REFRACTORY WORK AT BOTTOM ASH HOPPERS, AS PER SCOPE OF WORK. 1 Metric Tonne
87 87 ASSISTANCE IN THICKNESS MEASUREMENT, AS PER SCOPE OF WORK. 1 each
88 88 REPLACEMENT OF EYE BOLT & FLY NUT, AS PER SCOPE OF WORK. 1 SET
89 89 PAINTING OF EQUPTS, STRUCTURES AND PIPES, AS PER SCOPE OF WORK. 1 Square meter
90 90 P.M CHECKING OF ALL RUNNING S.C.s AND C., AS PER SCOPE OF WORK. 1 Times
91 91 MAN POWER ASSISTANCE, AS PER SCOPE OF WORK. 1 each
92 92 PATCH WELDING OF FLUSHING BOX/PIPE LINE, AS PER SCOPE OF WORK. 1 each
93 93 HYDRAULIC COUPLING TO GEAR BOX ALIGNMENT, AS PER SCOPE OF WORK. 1 each
94 94 HYDRAULIC COUPLING TO MOTOR ALIGNMENT, AS PER SCOPE OF WORK. 1 each
95 95 GEAR BOX TO PUMP ALIGNMENT, AS PER SCOPE OF WORK. 1 each
96 96 HYDRAULIC COUPLING TUBE SERVICING, AS PER SCOPE OF WORK. 1 each
97 97 HYDRAULIC COUPLING OIL REPLACEMENT, AS PER SCOPE OF WORK. 1 each
98 98 HYDRAULIC COUPLING SERVICING/OVERHAULING, AS PER SCOPE OF WORK. 1 each
99 99 FILTER/VALVE/COOLER /SERVICE/CLEANING, AS PER SCOPE OF WORK. 1 each
100 100 OIL SEAL CHANGE OF 3RD STAGE PUMP(NDE), AS PER SCOPE OF WORK. 1 each
101 101 OIL SEAL CHANGE OF 3RD STAGE PUMP(DE), AS PER SCOPE OF WORK. 1 each
102 102 ASH SLURRY HEADER INSPECTION, AS PER SCOPE OF WORK. 1 Times
103 103 ASSISTANCE IN SUB STORE ACTIVITIES, AS PER SCOPE OF WORK. 1 each
104 104 O.H OF HYD. DISCHARGE GATE SYSTEM, AS PER SCOPE OF WORK. 1 each
105 105 PREVENTIVE CHECKING OF PUMPS/EQPTS, AS PER SCOPE OF WORK. 1 Times
106 106 ASH HANDLING SHIFT MAINT JOBS, AS PER SCOPE OF WORK. 1 Shift
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail