National Aluminium Company Limited-NALCO has published Major Maintenance Of Ash Handling Plant Unit 1 To 6 And Bottom Ash System Of Unit 9 And 10 . . Submission Date for this Tender is 17-11-2020. Ash Handling Machine Tenders in CPP, NALCO, ANGUL Odisha. Bidders can get complete Tender details and download the document.
Name of Work: MAJOR MAINTENANCE OF ASH HANDLING PLANT UNIT #1 TO 6 AND BOTTOM ASH SYSTEM OF UNIT #9 AND 10. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | SCRAPPER CONVEYOR CHANGE, AS PER SCOPE OF WORK. | 1 | each | |
2 | 2 | RETURN IDLER/HEAD SHAFT ASSY MAINTENANC, AS PER SCOPE OF WORK. | 1 | SET | |
3 | 3 | TAIL GUIDE /GUIDE WHEEL ASSY MAINTENANCE, AS PER SCOPE OF WORK. | 1 | each | |
4 | 4 | REPLACEMENT OF C.I LINER OF S.C, AS PER SCOPE OF WORK. | 1 | each | |
5 | 5 | S.C CHAIN & CHAIN CONNECTOR MAINTENANCE, AS PER SCOPE OF WORK. | 1 | each | |
6 | 6 | REPLACEMENT OF TOTAL LINK CHAINS OF S.C, AS PER SCOPE OF WORK. | 1 | each | |
7 | 7 | REPLACEMENT OF SCRAPPER BAR, AS PER SCOPE OF WORK. | 1 | each | |
8 | 8 | REPLACEMENT OF SPROCKET TEETH, AS PER SCOPE OF WORK. | 1 | each | |
9 | 9 | O.H OF S.C/C.G/3 RD PUMP /GEAR BOX, AS PER SCOPE OF WORK. | 1 | each | |
10 | 10 | S.C SPRAY HEADER MAINTENANCE, AS PER SCOPE OF WORK. | 1 | each | |
11 | 11 | S.C BASE WHEEL MAINTENANCE, AS PER SCOPE OF WORK. | 1 | each | |
12 | 12 | S.C SIDE DOORS MAINTENANCE, AS PER SCOPE OF WORK. | 1 | each | |
13 | 13 | BREAK DOWN MAINTENANCE OF S.C, AS PER SCOPE OF WORK. | 1 | each | |
14 | 14 | C.G BEARINGS & GLAND HOUSING MAINT, AS PER SCOPE OF WORK. | 1 | each | |
15 | 15 | C.G ROLLERS & LINERS REPLACEMENT, AS PER SCOPE OF WORK. | 1 | SET | |
16 | 16 | C.G CHOCKING REMOVAL, AS PER SCOPE OF WORK. | 1 | each | |
17 | 17 | C.G ASSEMBLY REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
18 | 18 | S C / C G PREVENTIVE MAINT, AS PER SCOPE OF WORK. | 1 | Times | |
19 | 19 | REPLACEMENT OF BIFURCATING CHUTE OF C.G, AS PER SCOPE OF WORK. | 1 | each | |
20 | 20 | REPAIR OF BIFURCATING CHUTE, AS PER SCOPE OF WORK. | 1 | each | |
21 | 21 | M. D/R.P /F.C OF S.C/C.G REPLACEMENT, AS PER SCOPE OF WORK. | 1 | SET | |
22 | 22 | F.C.U SERVICING (SIZE :10.5/11.5), AS PER SCOPE OF WORK. | 1 | each | |
23 | 23 | P M OF B.A.H DISCHARGE GATE, AS PER SCOPE OF WORK. | 1 | each | |
24 | 24 | REPLACEMENT OF DISCHARGE GATE, AS PER SCOPE OF WORK. | 1 | SET | |
25 | 25 | QUENCHING NOZZLE MAINTENANCE, AS PER SCOPE OF WORK. | 1 | each | |
26 | 26 | SEAL TROUGH CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
27 | 27 | TRENCH JETTING NOZZLE BODY MAINT, AS PER SCOPE OF WORK. | 1 | each | |
28 | 28 | S. C /TRENCH CHOKING REMOVAL, AS PER SCOPE OF WORK. | 1 | each | |
29 | 29 | B.A.H CHOCKING REMOVAL / CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
30 | 30 | REPLACEMENT F. A (ESP & APH), AS PER SCOPE OF WORK. | 1 | each | |
31 | 31 | REPAIR OF FLUSHING APPARATUS, AS PER SCOPE OF WORK. | 1 | each | |
32 | 32 | FAB.& ERE. OF DISCHARGE PIPE, AS PER SCOPE OF WORK. | 1 | each | |
33 | 33 | OVERHAULING OF R.V. FEEDER, AS PER SCOPE OF WORK. | 1 | each | |
34 | 34 | P M OF R V FEEDER, AS PER SCOPE OF WORK. | 1 | each | |
35 | 35 | REPLACEMENT OF RV FEEDERS CHAIN, AS PER SCOPE OF WORK. | 1 | each | |
36 | 36 | BEARING POINT GREASING OF R V F/S W P, AS PER SCOPE OF WORK. | 1 | SET | |
37 | 37 | GASKET/‘O’RING CHANGING OF RV FEEDER, AS PER SCOPE OF WORK. | 1 | SET | |
38 | 38 | FOREIGN MATERIALS REMOVAL FROM R.V.F, AS PER SCOPE OF WORK. | 1 | each | |
39 | 39 | GASKET PACKING REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
40 | 40 | EXPANSION BELLOW REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
41 | 41 | REPLACEMENT OF RV FEEDERS SPROCKET WHEEL, AS PER SCOPE OF WORK. | 1 | each | |
42 | 42 | LEAKAGE ARREST OF ESP, AS PER SCOPE OF WORK. | 1 | SET | |
43 | 43 | F. BOX L.P PIPE LINE 2 LOOP FAB/ERE, AS PER SCOPE OF WORK. | 1 | each | |
44 | 44 | F. BOX L.P PIPE LINE 3 LOOP FAB/ERE, AS PER SCOPE OF WORK. | 1 | each | |
45 | 45 | NOZZLE TIP CHECKING, AS PER SCOPE OF WORK. | 1 | each | |
46 | 46 | FLUSHING APPARATUS CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
47 | 47 | TRENCH CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
48 | 48 | PLATE VALVE SERVICING (ESP/ECO/APH), AS PER SCOPE OF WORK. | 1 | each | |
49 | 49 | PLATE VALVE CLOSING/OPENING, AS PER SCOPE OF WORK. | 1 | each | |
50 | 50 | ECO HOPPER F A REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
51 | 51 | O H OF HP/LP PUMP, AS PER SCOPE OF WORK. | 1 | each | |
52 | 52 | P M OF HP/LP PUMP, AS PER SCOPE OF WORK. | 1 | each | |
53 | 53 | GLAND PACKING REPLACEMENTOF PUMPS, AS PER SCOPE OF WORK. | 1 | each | |
54 | 54 | O H ASH SLURRY PUMP, AS PER SCOPE OF WORK. | 1 | each | |
55 | 55 | PM OF ASH SLURRY PUMP, AS PER SCOPE OF WORK. | 1 | each | |
56 | 56 | DE/NDE OIL SEAL REPLACEMENT A.S P, AS PER SCOPE OF WORK. | 1 | each | |
57 | 57 | V-BELTS REPLACEMENT/TIGHTENING OF A.S.P, AS PER SCOPE OF WORK. | 1 | each | |
58 | 58 | BUILT UP OF WORN OUT PARTS OF A S P, AS PER SCOPE OF WORK. | 1 | Kilogram | |
59 | 59 | PUMP PULLEY BOLT TIGHTENING & ALIGNMENT, AS PER SCOPE OF WORK. | 1 | each | |
60 | 60 | PUMP PULLEY BOLT TIGHTENING, AS PER SCOPE OF WORK. | 1 | each | |
61 | 61 | A S P SUCTION BEND CHOCKING REMOVAL, AS PER SCOPE OF WORK. | 1 | each | |
62 | 62 | OIL CHANGE OF PUMPS/G.BOX/FC/OIL TANK, AS PER SCOPE OF WORK. | 1 | each | |
63 | 63 | OVERHAULING OF SUMP PUMP, AS PER SCOPE OF WORK. | 1 | each | |
64 | 64 | SUMP PUMP'S PIT CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
65 | 65 | S.W.P PUMP OVERHAULING, AS PER SCOPE OF WORK. | 1 | each | |
66 | 66 | S.W.P BRG & SLEEVE REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
67 | 67 | ASH SLURRY SUMP PIT CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
68 | 68 | M.S./C.I. BEND/LATERAL/Y PIECE REPLACEME, AS PER SCOPE OF WORK. | 1 | each | |
69 | 69 | MAINT OF VALVES OF ASH SLURRY LINE, AS PER SCOPE OF WORK. | 1 | each | |
70 | 70 | CLOSE/OPEN OF SLURRY LINE PLATE VALVE, AS PER SCOPE OF WORK. | 1 | each | |
71 | 71 | SLEEVE COUPLING MAINT, AS PER SCOPE OF WORK. | 1 | each | |
72 | 72 | FLOAT LEVEL INDICATOR MAINT, AS PER SCOPE OF WORK. | 1 | each | |
73 | 73 | SUMP ISOLATION PLUG VALVE SERVICING, AS PER SCOPE OF WORK. | 1 | each | |
74 | 74 | SUCTION SPOOL PIPE REPLACEMENT OF ASP, AS PER SCOPE OF WORK. | 1 | each | |
75 | 75 | DUMMY PLATE CHANGE OVER, AS PER SCOPE OF WORK. | 1 | each | |
76 | 76 | ASPH SUCTION LINE DUMMY PLATE FITTING, AS PER SCOPE OF WORK. | 1 | each | |
77 | 77 | SERVICING OF OVER HEAD CRANE, AS PER SCOPE OF WORK. | 1 | each | |
78 | 78 | FABRICATION & ERECTION OF PIPING SYSTEM, AS PER SCOPE OF WORK. | 1 | Meter | |
79 | 79 | DISMANTLING & REMOVAL OF PIPING SYSTEM, AS PER SCOPE OF WORK. | 1 | Meter | |
80 | 80 | VALVES REPAIR/REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
81 | 81 | REPLACEMENT OF VALVE & NRV, AS PER SCOPE OF WORK. | 1 | each | |
82 | 82 | WELDING, AS PER SCOPE OF WORK. | 1 | Meter | |
83 | 83 | GAS CUTTING, AS PER SCOPE OF WORK. | 1 | Meter | |
84 | 84 | PAINTING WITH SYNTHETIC ENAMEL PAINT, AS PER SCOPE OF WORK. | 1 | Square meter | |
85 | 85 | PAINTING WITH CHLORO RUBBER PAINT, AS PER SCOPE OF WORK. | 1 | Square meter | |
86 | 86 | REFRACTORY WORK AT BOTTOM ASH HOPPERS, AS PER SCOPE OF WORK. | 1 | Metric Tonne | |
87 | 87 | ASSISTANCE IN THICKNESS MEASUREMENT, AS PER SCOPE OF WORK. | 1 | each | |
88 | 88 | REPLACEMENT OF EYE BOLT & FLY NUT, AS PER SCOPE OF WORK. | 1 | SET | |
89 | 89 | PAINTING OF EQUPTS, STRUCTURES AND PIPES, AS PER SCOPE OF WORK. | 1 | Square meter | |
90 | 90 | P.M CHECKING OF ALL RUNNING S.C.s AND C., AS PER SCOPE OF WORK. | 1 | Times | |
91 | 91 | MAN POWER ASSISTANCE, AS PER SCOPE OF WORK. | 1 | each | |
92 | 92 | PATCH WELDING OF FLUSHING BOX/PIPE LINE, AS PER SCOPE OF WORK. | 1 | each | |
93 | 93 | HYDRAULIC COUPLING TO GEAR BOX ALIGNMENT, AS PER SCOPE OF WORK. | 1 | each | |
94 | 94 | HYDRAULIC COUPLING TO MOTOR ALIGNMENT, AS PER SCOPE OF WORK. | 1 | each | |
95 | 95 | GEAR BOX TO PUMP ALIGNMENT, AS PER SCOPE OF WORK. | 1 | each | |
96 | 96 | HYDRAULIC COUPLING TUBE SERVICING, AS PER SCOPE OF WORK. | 1 | each | |
97 | 97 | HYDRAULIC COUPLING OIL REPLACEMENT, AS PER SCOPE OF WORK. | 1 | each | |
98 | 98 | HYDRAULIC COUPLING SERVICING/OVERHAULING, AS PER SCOPE OF WORK. | 1 | each | |
99 | 99 | FILTER/VALVE/COOLER /SERVICE/CLEANING, AS PER SCOPE OF WORK. | 1 | each | |
100 | 100 | OIL SEAL CHANGE OF 3RD STAGE PUMP(NDE), AS PER SCOPE OF WORK. | 1 | each | |
101 | 101 | OIL SEAL CHANGE OF 3RD STAGE PUMP(DE), AS PER SCOPE OF WORK. | 1 | each | |
102 | 102 | ASH SLURRY HEADER INSPECTION, AS PER SCOPE OF WORK. | 1 | Times | |
103 | 103 | ASSISTANCE IN SUB STORE ACTIVITIES, AS PER SCOPE OF WORK. | 1 | each | |
104 | 104 | O.H OF HYD. DISCHARGE GATE SYSTEM, AS PER SCOPE OF WORK. | 1 | each | |
105 | 105 | PREVENTIVE CHECKING OF PUMPS/EQPTS, AS PER SCOPE OF WORK. | 1 | Times | |
106 | 106 | ASH HANDLING SHIFT MAINT JOBS, AS PER SCOPE OF WORK. | 1 | Shift |