| 1 | Construction of steps and laying of Shabad stone flooring | NA | 14.30 | 1 Cum | 1670.59 | 23889.00 |
| Cutting of sheet rock by boring, wedging, chisilling including labour and all other charges. |
| 2 | Construction of steps and laying of Shabad stone flooring | NA | 32.20 | 1 Cum | 1357.63 | 43716.00 |
| Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. with out Paver Finisher |
| 3 | Construction of steps and laying of Shabad stone flooring | NA | 29.19 | 1 Cum | 5074.99 | 148139.00 |
| PCC Grade M20 - Nominal Mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, shuttering curing exculding Seignorage charges, centering, etc.,complete for finished item of work. Restoration |
| 4 | Construction of steps and laying of Shabad stone flooring | NA | 270.30 | 1 Cum | 33.64 | 9093.00 |
| Supply and filling of debris including labour and all other charges complete as per specification. |
| 5 | Construction of steps and laying of Shabad stone flooring | NA | 1222.00 | 1 Sqm | 546.91 | 668324.00 |
| Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of Mud Mortor 12mm thick including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, Cement, Sand, Mud, and Water etc., complete, labour charges for dressing of flooring stones, curing etc., complete for finished item of work, |
| 6 | Construction of steps and laying of Shabad stone flooring | NA | 70.00 | 1 Sqm | 447.16 | 31301.00 |
| Removing and Refixing of S.S. Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of Mud Mortor 12mm thick including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, Cement, Sand, Mud, and Water etc., complete, labour charges for dressing of flooring stones, curing etc., complete for finished item of work, |
| 7 | Construction of steps and laying of Shabad stone flooring | NA | 64.30 | 1 Cum | 174.58 | 11225.00 |
| Carting the excavated earth to a lead of 10 KMS including Labour chargess for loading and unlosding, transportation etc. complete as per specification |
| 8 | Construction of steps and laying of Shabad stone flooring | NA | 72.00 | Each | 651.00 | 46872.00 |
| Engaging labour including all charges complete. |