Topography Survey Work At Numaligarh Refinery , Assam , Conducting Topographical Ground / Land Survey & Carrying Out Spot Levels At Grid , ( Including Constructing Of Grid Pillar As Per Specifications ) In The Specified Area Indicated By Conventional / Gps Or Any Other Standard Method , Covering Details As Specified In The Plot Plan /Scope Of Work/Sketches/As-Built Markup And Elsewhere In Tender Document And Directions Of Engineer-In-Charge Including Submitting Hard Copies Of Drawing / Map And Supply Of Electronic Files . The Rate Shall Includes Mobilizing Tools Tackles , Personnel For Specific Purpose Of Carrying Out The Field Work , Contour Surveying , Locating The Plant Boundaries , Limits , Calculating Reduced Levels For Surveying At Site , Establishing Hfl ( High Flood Level ) , Locating And Construction Of New Bench Mark Pillars ( 15 Nos . ) And Also , Clearing And Stripping Of The Areas , Removing Shrubs , Grass , Bushes , Vegetation Growth And Other Objectionable Materials , Trees Up To And Inclusive Of A Girth Of 30Cms ( Girth Measured At A Height Of One Meter From Ground Level ) Including Uprooting Of Roots , Etc . For Taking Spot Levels , Disposing All Materials Out Side Boundary Limit All Complete As Per Specifications And Directions Of Engineering-In Charge . Refer Attachment - 1For The Proposed Locations And Battery Limits Inside The Refinery . , Description As Same As Point 1 Above But , Conducting Topographical Ground / Land Survey In Strip Of Land , Outside Battery Limits Of Plant Boundary , Along The Existing Raw Water Pipe Line Route , Specified Width 5M On Either Side Of Routing ( 10M Wide Strip ) , For The Proposed New Rw Pipe Line Construction , All Complete As Per Specifications And Directions Of Engineering-In Charge . Refer Attachement-2 For The Routing And Attachment-3 For Coordinates . , Description As Same As Point 1 Above But , Conducting Topographical Ground / Land Survey In Raw Water Intake Well Area On Bank Of River Which Is Outside The Plant Battery Limits With Two Bench Mark Piller , All Complete As Per Specifications And Directions Of Engineering-In Charge . Refer Attachement-4 For The Proposed Location And Battery Limits . , Description As Same As Point 1 Above But , Conducting Topographical Ground / Land Survey In Strip Of Land , Outside Battery Limits Of Plant Boundary , Along The Proposed Lpg Product Line Coordinates Or Pipe Line Routes , ( Approximate Width Of 25M ) From The Nrl Plant To The Proposed Bottling Plant / Bullet Storage Facilities / Lpg Gantry Area , Which Is Located Approximately 25Km ( Dabidubi ) Away From The Existing Nrl Refinery Plant , All Complete As Per Specifications And Directions Of Engineering-In Charge . The Location / Boundary / Battery Limits Will Be Confirmed By Owner / Consultant / Engineer-In-Charge By Mar 2021 , To Start The Activities . , Description As Same As Point 1 Above But , Conducting Topographical Ground / Land Survey In Proposed Bottling Plant / Bullet Storage Facilities / Lpg Gantry Area , Which Is Located Approximately 25Km Away From The Existing Nrl Refinery Plant ( Dabidubi ) , With Five Bench Mark Pillers , All Complete As Per Specifications And Directions Of Engineering-In Charge . The Location / Boundary / Battery Limits Will Be Confirmed By Owner / Consultant / Engineer-In-Charge By Mar 2021 , To Start The Activities .