| 1 | 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and low laying areas etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m including supply of all labour,T&P etc required asdirected by Engineer-in-Charge for proper completion of work. | BI01010001010000000000000515BI0100001113 | 20 | M3 |
|---|
| 2 | 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001114 | 3000 | M2 |
|---|
| 3 | 3 | Preparation of ground by cutting of earth in layers not exceeding 20cm in depth, consolidating each deposited layer lead up to 50 m and lift upto 1.5 m 100 mm depth and also Filling pits by available excavated earth (excluding rock) and cutting of grass with Pharsa (Spade) where required including watering, rolling with heavy and light hand roller, making the surface smooth as directed by the Engineer-In- Charge including cost of all materials, labour,T&P etc required for proper completion of work. | BI01010001010000000000000515BI0100001115 | 200 | M2 |
|---|
| 4 | 4 | Supply and stacking of Cow dung Manure at specified location, including carriage, loading , unloading & stacking up to any lead as directed by the Engineer-In- Charge required for proper completion of work. | BI01010001010000000000000515BI0100001116 | 15 | M3 |
|---|
| 5 | 5 | Surface dressing of ground including removing vegetation and in equalities not exceeding 50 cm and disposal of rubbish lead upto 50 meter and lift 1.5 meter. | BI01010001010000000000000515BI0100001117 | 4500 | M2 |
|---|
| 6 | 6 | Supply and stacking of sandy soil in play grounds at specified location, including carriage, loading , unloading & stacking up to any lead (measured stacks will be reduced by 20% for payment). as directed by the Engineer-In- Charge required for proper completion of work. | BI01010001010000000000000515BI0100001118 | 20 | M3 |
|---|
| 7 | 7 | Supply and stacking of Bhassi (Stone dust) from quarry within 4 Km including spreading, compaction, rolling with hand roller watering and smoothening etc including cost of all materials, labour,T&P etc required for proper completion of work . as directed by the Engineer-In- Charge | BI01010001010000000000000515BI0100001119 | 6 | M3 |
|---|
| 8 | 8 | Demarking of field boundary by repairing and painting with one coat of white lime. | BI01010001010000000000000515BI0100001120 | 1200 | R.M |
|---|
| 9 | 9 | Preparation of athletics track including volley ball field by cleaning the ground with khurpee to removal of grasses, muds and kankar, cleaning with brush and finishing the entire area with paste of screened cow dung in 3 mm thickness including making of track line with screened lime powder or chalk powder paste including all materials, labour, T&P etc including maintenance of track for 7 days by providing 6 labour per day. | BI01010001010000000000000515BI0100001121 | 1500 | M2 |
|---|
| 10 | 10 | Supply and stacking of good quality marble dust for lining in ground in sports complex including cost of all materials, labour,T&P etc required for proper completion of work . | BI01010001010000000000000515BI0100001122 | 10 | Per bag of 30kg |
|---|
| 11 | 11 | Providing and applying special type of hard putty on wooden court as directed by the Engineer-In- Charge including cost of all materials, labour,T&P etc required for proper completion of work. | BI01010001010000000000000515BI0100001123 | 185 | M2 |
|---|
| 12 | 12 | Polishing two coats on wooden court of Badminton including its preparation with chapra, cand-kua, yellow clay and special fine thinner of approved quality as per direction of the Engineer-In- Charge including cost of all materials, labour,T&P etc required for proper completion of work . | BI01010001010000000000000515BI0100001124 | 185 | M2 |
|---|
| 13 | 13 | Varnishing with varnish of approved brand and manufacture : Two or more coats glue sizing with spar varnish or an under coat of flatting varnish | BI01010001010000000000000515BI0100001125 | 185 | M2 |
|---|
| 14 | 14 | Rubbing down with sand paper of required No. on wooden court of badminton as per direction of the Engineer-In- Charge including cost of all materials, labour,T&P etc required for proper completion of work | BI01010001010000000000000515BI0100001126 | 185 | M2 |
|---|
| 15 | 15 | Painting of 40 mm wide lines in badminton / basket ball field with ready mix synthetic enamel paint including supply of all materials, labour,T&P etc required for proper completion of work . | BI01010001010000000000000515BI0100001127 | 300 | R.M |
|---|
| 16 | 16 | Providing and fixing if 8 mm thick shisham wood planks fully seasoned in badminton court including smoothing to mach the surface of the court and removing old planks also including cost of all necessary nails, materials, labour,T&P etc. required for proper completion of work . | BI01010001010000000000000515BI0100001128 | 3 | M2 |
|---|
| 17 | 17 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | BI01010001010000000000000515BI0100001129 | 25 | M3 |
|---|
| 18 | 18 | Shifting of furniture and other materials for various places as and when required for organizing function of the Nigam by Tractor trolley including loading, unloading and properly keeping the materials as directed by the Engineer-In- Charge | BI01010001010000000000000515BI0100001130 | 20 | Per trip |
|---|
| 19 | 19 | Supply of black Cotton soil of approved quality including cartage of soil from a distance of 160 km from Obra crushing of soil by 8 /10 Ton roller and then screening to make the soil free from all waste materials and re-rolling to pulverize the soil including stacking in proper covered area as per direction of Engineer-In-Charge. | BI01010001010000000000000515BI0100001131 | 3 | M3 |
|---|
| 20 | 20 | Rolling of ground with 8 Ton road roller including providing diesel as required and filling to sandy soil in depressed portion to make smooth leveled surface of ground excluding cost of sandy soil but including cost of hire charges of road roller with cost of labour ,T&P etc. required for proper completion of work | BI01010001010000000000000515BI0100001132 | 10 | Per hour |
|---|
| 21 | 21 | Cleaning of roof at all elevation filled approx. 10 Cm. with ash, Coal dust and other waste materials including its disposal into dustbin at specified place including cost of all labour, T&P etc. required for proper completion of work. | BI01010001010000000000000515BI0100001133 | 500 | M2 |
|---|
| 22 | 22 | Routine maintenance of Nursery and its keep by providing adequate labour including cleaning of wild vegetation, preparation of flower/seed beds, growing plants and flowers etc. by filling earth in small polythene bags and putting seed into it, its watering and transferring it into nursery and other work related to development of Nursery (Minimum 2 labour shall be engaged daily, excluding Sunday and holiday). | BI01010001010000000000000515BI0100001134 | 12 | Job Per Month |
|---|
| 23 | 23 | Maintenance of Lawns, approaches and other areas of V.I.P. Guest House, Rest House etc. by daily cleaning cutting of grass of lawns etc. as and when required watering and growing the plant dressing and cutting of hedges, shrubs and ornamental plants including cost of all material, labour T&P etc. require for completion of work, Lawn mover and rubber hose pipe shall be provided by department free of cost other T&P such as spade, baskets, scissors, cutters etc. shall be arranged by contractor at his own cost. Work shall be carried out daily including Sunday and holidays, (minimum 4 labours shall be engaged). | BI01010001010000000000000515BI0100001135 | 12 | Job Per Month |
|---|
| 24 | 24 | Supplying and planting of following ornamental plants with making pits of size 600mm dia. at Top and 400mm dia. and at Bottom and 450mm deep including mixing of approved quality cow dung and soil including cost of all labour, materials, T&P etc. required for proper completion of work. Exclusive cost of cow dung. | BI01010001010000000000000515BI0100001136 | | |
|---|
| 25 | 24.01 | Morpankhi | BI01010001010000000000000515BI0100001137 | 15 | Nos. |
|---|
| 26 | 24.02 | Double Boganvellia of different shapes. | BI01010001010000000000000515BI0100001138 | 15 | Nos. |
|---|
| 27 | 24.03 | Rose of different shades. | BI01010001010000000000000515BI0100001139 | 50 | Nos. |
|---|
| 28 | 24.04 | Krotens of different variety. | BI01010001010000000000000515BI0100001140 | 20 | Nos. |
|---|
| 29 | 24.05 | Eurocaria, Musanda (Yellow/Red), Mengastra etc. upto 45cm high. | BI01010001010000000000000515BI0100001141 | 20 | Nos. |
|---|
| 30 | 24.06 | Seasonal flower such as double dahalia, guldaudi, marigold of different variety. | BI01010001010000000000000515BI0100001142 | 300 | Nos. |
|---|
| 31 | 24.07 | Supply of earthen pots (gamla) of approved shape upto 12” size. | BI01010001010000000000000515BI0100001143 | 50 | Nos. |
|---|
| 32 | 24.08 | Supply of C.C. posts (gamla) of approved shape upto 12” size. | BI01010001010000000000000515BI0100001144 | 50 | Nos. |
|---|
| 33 | 25 | Supplying of unskilled labours as and when required for misc. work including necessary T&P such as Phawra (Spade) Pick Axe, Khurpa, basket as directed by Engineer in charge. | BI01010001010000000000000515BI0100001145 | 100 | Man days |
|---|
| 34 | 26 | Decoration of field by repairing of existing brick lining and painting with one coat of white snowcem. | BI01010001010000000000000515BI0100001146 | 350 | R.M. |
|---|