Public Health Engineering Department-PHED has published Nuh- Laying Of Sewer Lines In Balance Left Out Streets And Upgradation Of Existing 3 . 60 Mld Stp By Territory Treatment Upgradation Of Sewage Treatment Plant ( Stp ) Of 3 . 60 Mld Capacity Based On Moving Bed Bio Reactor ( Mbbr ) Technology , Operat. Submission Date for this Tender is 09-11-2020. Reactor Tenders in NUH Haryana. Bidders can get complete Tender details and download the document.
Name of work:- Nuh- Laying of sewer lines in balance left out streets and Upgradation of existing 3.60 MLD STP by territory treatment "Upgradation of Sewage Treatment Plant (STP) of 3.60 MLD capacity based on Moving Bed Bio Reactor (MBBR) Technology, Operation and Maintenance for 5 years including 1 year defect liability period after 3 months trial run period and all other works contingent thereto" located at Nuh town to 3.60 MLD capacity | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Lump Sum cost for construction, oreration and maintenance, trial run and other maintenance of STP & other inrastructure including maintenance of existing STP during construction. | 1 | Lump Sum | |
2 | 2 | Guaranteed Power Consumption -Electric Power consumption per year for Ist Year ( Units to be entered) | 1 | Per Year KWH | |
3 | 3 | Guaranteed Power Consumption -Electric Power consumption per year for 2nd Year ( Units to be entered) | 1 | Per Year KWH | |
4 | 4 | Guaranteed Power Consumption -Electric Power consumption per year for 3rd Year ( Units to be entered) | 1 | Per Year KWH | |
5 | 5 | Guaranteed Power Consumption -Electric Power consumption per year for 4thYear ( Units to be entered) | 1 | Per Year KWH | |
6 | 6 | Guaranteed Power Consumption -Electric Power consumption per year for 5th Year ( Units to be entered) | 1 | Per Year KWH |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail