| 1 | BOQ | NIL | 105.00 | Sqm | 652.14 | 68474.70 |
| Providing grounting with 1:3:6 prop using 20 mm crushed grainate metal and pointing 12 mm thick in CM (1:3) with cement for the Revetment provided including cost and conveyance of all materials to site etc complete for finished item of work and as directed by the Engineer-in-charge. ( excluding revetment ) |
| 2 | BOQ | MoRT&H specification 2504 (5th revision | 31.50 | Cum | 1477.38 | 46537.47 |
| Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 (5th revision) and as directed by the Engineer-In-Charge for Pitching of slopes |
| 3 | BOQ | NIL | 48.00 | Hour | 1493.58 | 71691.84 |
| Engaging road roller for compaction of Bund for lake complete including cost of diesel, driver batha etc., complete for finsihed item of work and as directed by Engineer In Charge. |
| 4 | BOQ | NIL | 80.00 | Hour | 1050.00 | 84000.00 |
| Engaging JCB Back hoe loader for formation and levelling of bund for lake complete including cost of diesel, driver batha etc., complete for finsihed item of work and as directed by Engineer In Charge. |
| 5 | BOQ | NIL | 10.00 | Nos | 714.31 | 7143.10 |
| Engaging Labour for cleaning of lake debris including transportation, complete for finished item of work and as directed by Engineer In Charge. |
| 6 | BOQ | NIL | 1479.60 | Kg | 126.54 | 187228.58 |
| Supply and fixing of Mild steel railing of approved design including cost of material , cost of fixing fabrication charges stc., all other materials required as per the approved drawing and as directed by the departmental engineers in charge, complete for finished item of work and as directed by Engineer in Charge |
| 7 | BOQ | SS 912 | 344.70 | Sqm | 245.26 | 84541.12 |
| Painting to walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for walls as directed by Engineer-in-charge |
| 8 | BOQ | NIL | 89.02 | Sqm | 270.74 | 24101.27 |
| Plastering 20mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete all taxes except GST for finished item of work . |
| 9 | BOQ | NIL | 6.90 | Cum | 5909.35 | 40774.52 |
| Laying PCC 1:2:4 prop. Using 20 mm Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand coarse agreegate, water etc., to site including on all materials, all taxes, labour charges for manual mixing, laying, concrete for finishing top surface to the required level & curing etc., complete for finished item of work as directed by Engineer-in-Charge for coping |
| 10 | BOQ | NIL | 23.46 | Cum | 16114.50 | 378046.17 |
| Brick Masonry in CM (1:4) with Wire cut Red Bricks including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as directed by Engineer-in-charge for construction of wire-cut red brick benches |
| 11 | BOQ | NIL | 11.30 | Cum | 4412.10 | 49856.73 |
| Providing and laying Plain Cement concrete (1:4:8) using 40 mm metal with hand mixing upto Plinth level including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as directed by Engineer-in-charge for construction of wire-cut red brick benches |
| 12 | BOQ | SS 20B (APSS 308) | 11.90 | Cum | 260.01 | 3094.12 |
| Earthwork Work excavation in all soils and despositing on the banks with initial lead of 10m and lift of 2m including labour charges etc., complete for finished item of work as directed by Engineer-in-charge for construction of wire-cut red brick benches |