Manning/Operation Of Pump House No 11 , 08 And 03 And Manning Operation And Maintenance Of Swimming Pool At Af Station Jammu

Tender Notice

25760966
Manning/Operation Of Pump House No 11 , 08 And 03 And Manning Operation And Maintenance Of Swimming Pool At Af Station Jammu
Indian
Jammu And Kashmir
17-10-2020
09-11-2020
11-11-2020

Tender Details

Manning / Operation Of Pump House No 11 , 08 And 03 And Manning Operation And Maintenance Of Swimming Pool At Af Station Jammu

Key Value

Document Fees
INR 500 /-
EMD
INR 51500.00 /-
Tender Value
INR 25.75 Lakhs /-

BOQ Items

Name of Work: MANNING/OPERATION OF PUMP HOUSE NO 11, 08 & 03 AND MANNING OPERATION & MAINTENANCE OF SWIMMING POOL AT AF STATION JAMMU
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Outsourcing of Services for Manning and operation of following Plants installed at water Tube well No.8, 3 and 11 at 23 wing AF station Jammu in two Shifts per day including Sundays and Holidays from 0500Hrs to 1300Hrs & 1300Hrs to 2100Hrs by deploying minimum 01 (One) Skilled Fitter General Mechanic (FGM) per shift:\nPLANTS INSTALLED AT TUBE WELL NO. 11 AT 23 WING AF STATION JAMMU:\n(i) Submersible motor pump set of capacity 33 HP - 01 No. \n(ii) Diesel engine driven Generator Set of capacity 100 KVA for providing Stand by power supply. -01 No.\n(iii) Altoc Dosing Pump for chlorination -01 No.
2 1.01 PLANTS INSTALLED AT TUBE WELL NO. 3 AT 23 WING AF STATION JAMMU:\ni) VT pumpset of capacity 25 HP - 01 No. \nii) Altoc Dosing Pump for chlorination -01 No.\n(iii) Voltage Stabilizer 100 KVA-01 No.\nPLANTS INSTALLED AT TUBE WELL NO. 08 AT 23 WING AF STATION JAMMU:\n(i) Submersible motor pump set of capacity 33 HP - 01 No. \n(ii) Diesel engine driven Generator Set of capacity 100 KVA with APFC panel for providing Stand by power supply. -01 No.\n(iii) Altoc Dosing Pump for chlorination -01 No.\n(iv) Voltage Stabilizer-100 KVA
3 1.02 Rates required to be quoted by the bidders for execution of work as described in serial item No 1.00 and 1.01 here-in-before for the following components:
4 1.03 Minimum fiar wages for Fitter General Mechanic (FGM) per shift as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
5 1.04 Employer's Contribution towards Employee Provident Fund (EPF) as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
6 1.05 Contribution towards Employee State Insurance Corporation (ESIC) as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
7 1.06 Employer's Contribution towards Bonus as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
8 1.07 Contribution towards Bonus as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
9 1.08 Over Head Charges and profit as desired by bidder as per relevant note of Schedule 'A' Notes (It should not be less than or equal to zero) 668 Per Person Per shift
10 1.09 Good and Service Tax (GST) as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
11 1.1 Labour Welfare Cess as per relevant note of Schedule 'A' Notes 668 Per Person Per shift
12 1.11 Note for Item No 1.00, 2.00 and 5.00:\n(a)The personnel deployed by the Contractor must have technically qualified having Govt approved ITI with minimum two years experience/ A person having SSC qualification with seven years experience in the relavent trade / Ex servicemen of the relavent trade (Fitter General Mechanic/Pump Operator/DG Set Operator as the case may be) and shall have adequate knowledge of operation and maintenence of DG Set/Pump Sets and other Electrical Machinery. (b) Persons employed must have Aadhar number and linked bank account. (c) Contractor shall install & Maintain digital Bio-metric attendance systems at the installation as required to record the attendance of the personnel and authorised admin for Bio matric machine will be the concern JE E/M Incharge of the installation all as directed by Engineer-in-charge. Expenditure to this effect shall be included in quoted rate.\n
13 1.12 (d) It is an express condition of the contract that payment of wages to tradesmans/workers deployed at site of work shall be made through bank account of individuals only. The contractor deposit/ distribute the payment in first week of every month and will confirm to Engineer-in-Charge by submitting the bank transaction document from bank. The salary paid to the trademen /worker shall not be less than minimum wages/fair wages as notified by Govt. time to time by the Govt.\n(e) The unit rate quoted shall be be deemed to include cost of consumable items such as cotton, waste cloth, Hessain cloths, T & P required for maintenance, nuts, bolts, washers, grease, oil, battery terminals, stationery for log book sheet, attendance register (in addition to Biometric attendance), Fist Aid Box, Operator dress and other minor items.
14 1.13 (f) In case of Non deployment of operator on duty, non rectification of defects / cleaning of installation, non maintenance of log sheets and other records in the installation on particuar day, it shall be considered that operator are absent on duty and recovery at double cost of basic rate quoted (i.e. minimum fair wages) by contractor under ser item No 1.03 here-in-before shall be deducted by the Engineer-In-Charge from the dues without any notice to the Firm. (h) Contractor shall provide proper uniform to the operator as approved by Engineer-in-charge. Operator without approved uniform will treated as absent and liable for panel recovery as stated above. \n
15 1.14 (j) No claim whatsoever shall be admissible regarding distance between plants/installation and location of plant/installation to be kept operational under above items. Rate quoted are deemed to be inclusive of this aspect. (k) On acceptance of the agreement, contractor shall produce the copies of educational qualifications and experience certificates of tradesmen being deployed in the work and the same shall be verified by the Engineer-in-charge. (l) The contractor on acceptance will acquire valid entry passes from AF Security Section for entering in restricted area through Engineer-in-charge. (m) The contractor shall engage the requisite manpower in the manner so as to give adequate rest to the working personnel already deployed.
16 2 Material and labour for Cleaning of silt, sludge mud accumulated at bottom of drain all around swimming pool (passing water of suction sweeper) by removing concrete covers over drain and refixing to the entire satisfaction of Engineer-in- charge. 1 Each Job
17 3 Supply only hard wire teeth brush for cleaning of swimming pool of size 30 cm length and width not less than 10 cms complete all as specified and as directed by Engineer-in-Charge. 1 Each
18 4 Material and labour for Servicing of DG set of capacity 100 KVA installed at Pump House No 11 & 8 at 23 Wing AF Jammu including carrying out maintenance check alongwith following repairs:\n(a) Drain out the lubricating oil from sump and refilling after proper cleaning.\n(b) Check tightness of all nuts and bolts.\n(c) Check adjustment of V belt for driving engine water pump and alternator.\n(d) Assembling complete old serviceable parts\n(e) Testing of DG set after servicing to entire satisfaction of Engineer-in-Charge.\n(f) Cleaning of air cleaner filter and renew after period of hrs run as specified by manfacturers manual. (Labour only)\n 4 Each Job of one GD set
19 4.01 Note: (i). Any minor parts such as screws, washers, split pins, clips etc shall be supplied by the firm and rate for the same shall be deemed to be included in the unit rate quoted.\n(ii) The job shall be carried out after two hundred hrs run of DG set and shall be measured and paid separately no. of times carried out during the entire period of contract.\n(iii) Any parts other than mentioned in above Note (i) required to be replaced during servicing of engine shall be measured and paid for separately as "Supply only".
20 5 Supply only following provisional items to be incorporated in the work against relevant item of this BOQ here in before for DG set of capacity 100 KVA.
21 5.01 Oil filter Catridge with 'O' rings / gasket. 8 Each
22 5.02 Fuel filter Catridge with 'O' rings / gasket. 8 Each
23 5.03 Air cleaner filter Catridge with 'O' rings / gasket. 8 Each
24 6 Material and labour for Repair/ servicing to battery charging alternator 12 Volt by repllacing worn out required parts to be supplied by the firm and testing as directed by Engr-in-Charge. 2 Each
25 7 Material and labour for Servicing / repair to self starter 12 volts by replacing burnt out field coil and other worn out parts such as carbon bush, spring etc as required, assembling with serviceable and new parts including taking out from engine and refixing at its original position after repair suitable for any type of Engine. 2 Each\n Job
26 8 Supply and fixing fan belt for any size of the Engine as per existing for DG set 100 KVA capacity including taking down of old unserviceable fan belt complete all as specified and as directed. 2 Each
27 9 Material and labour for synthetic insulating Mat of size 2 m x 1m x 19 mm thick suitable for 1100 volts, complete all as specified and directed by Engr-in-charge. 4 Each
28 10 Excavation in trenches n.exc 1.5 M wide and n.exc. 1.5 M in depth and getting out in soft/loose soil all as directed by Engr-in-Charge 110 Cubic Metre
29 11 Returning filling in including spreading levelling and well ramming in n.exc. 25 Cum complete all as directed by Engr-in-Charge. 90 Cubic Metre
30 12 Removing the excavated material n.exc. 50m and depositing where directed at & level n.exc. 1.5m above the starting point all as directed by Engr-in-charge. 20 Cubic Metre
31 13 Supply , laying, jointing & testing of DI Type K-7 pipe, 150mm dia, with socket & spigot ends, with cement morter zinc coated out side as per IS 8329/2000 in standard length suitable for and including push on tyton joints with rubber rings, laid in trenches, including taking up or down old unserviceable water mains (including all fittings), of any type including burning out joints incliding turning water OFF or ON as necessary and taking off and refixing covers, access doors etc.complete all as specified and directed by Engr in charge. \n 120 Running metre
32 14 Supply , laying, jointing & testing of DI Type K-7 pipe, 100mm dia, with socket & spigot ends, with cement morter zinc coated out side as per IS 8329/2000 in standard length suitable for and including push on tyton joints with rubber rings, laid in trenches, including taking up or down old unserviceable water mains (including all fittings), of any type including burning out joints incliding turning water OFF or ON as necessary and taking off and refixing covers, access doors etc.complete all as specified and directed by Engr in charge. \n 170 Running metre
33 15 S & F Pressure gauge 4" dial 0-21 kgs rating with taking down old u/s pressure gauge of any type\n 3 Each
34 16 Plain Cement concrete in foundations, filling and mass concrete Type C2 1:3:6 (using 40 mm graded crushed stone aggregates) complete all as specified and as directed. 10 Cubic Metre
35 17 Dismantling of existing unserviceable/rusted panle and supply, fixing, fabrication, installation, testing and commissioning of Panel box, double door, totally closed, consists of 3 compartments having front shutters with floor and wall mounting provisions, dust and vermin proof, having dimensions 120cm (height) x 80mm (width) x 25cm (depth) fabricated, suitable for 440 Volt 3 phase 4 wire system, made out of 3.0mm thick CRCA sheet and built upon regid frame work of angle iron of size 50x50x6mm and having front doors with neoprence rubber gasket including danger plate, earthing strip point at side, ventilation louvers at the side, bottom detachable gland plate complete with suitable size of Zinc plated nuts, bolts and washers etc. The pannel shall be powder coated and the power and control circuit diagram shall be accompany the eqpt and circuit wiring with colour code solid conductor copper cable for easy identification including incomming/ outgoing cable holes at the bottom. The Panel shall be emmbeded with 50 x 6 mm MS channel and 30 cm above the normal ground level complete with PCC foundation (1:2:4 ) type B2 incl all connections of lugs complete including taking down old panel all as specified and directed. Size of panel should be with provisions and to accomodate the following items: -\n 1 Each\n Job
36 17.01 (a) Aluminium bus bar of suitable size for RYB (live) and neutral ass main bus bar.\n(b) Aluminium bus bar of suitable size for RYB and neutral as down links/connectivity to LT MCCBs.\n(c) Digital Ammeter and voltmeter for Incoming.\n(d) LED Indication lamps for RYB for Incoming Indication\n(e) ON load front operated change over switch\n(f) MCCBs as Existing capacity as Incomer\n(g) MCCBs Existing capacity as out going
37 18 Supply and Fixing MCCB 200 Amps 4 pole 36 KA with thermal magnetic release, fixed in repairs complete all as specified and directed. \nMake: Legrand (DPX³) Cat Part No 4202 48 or equal approved in Siemens (3VL)/Schneider (NSX)/L&T (D-Sine) 3 Each
38 19 Supply and fixing MCCB 160 Amps 4 pole 25 KA with adjustable thermal and fixed magnetic setting fixed in repairs complete all as specified and directed. \nMake: Legrand (DPX³) Cat Part No 4200 57 or equal approved in Siemens (3VL)/Schneider (NSX)/L&T (D-Sine) 3 Each
39 20 Supply and Fixing MCCB 63 Amps 4 pole 25 KA with adjustable thermal and fixed magnetic setting, fixed in repairs complete all as specified and directed. \nMake: Legrand (DPX³) Cat Part No 4200 53 or equal approved in Siemens (3VL)/Schneider (NSX)/L&T (D-Sine) 2 Each
40 21 Supply and Fixing MCCB 32/40 Amps 4 pole 16 KA with adjustable thermal and fixed magnetic setting, fixed in repairs complete all as specified and directed. \nMake: Legrand (DPX³) Cat Part No 4200 02 or equal approved in Siemens (3VL)/Schneider (NSX)/L&T (D-Sine) 6 Each
41 22 Supply and fixing in repairs change over switch in sheet metal enclosure, 200 A rating, four pole, LT heavy duty, 415 volts, 50 Hz with side handle complete all as specified and as directed by Engineer-in-Charge.\nMake: IHBFFE0200 (HSD Code 8536) of Havells or equal approved in Standard/C&S 3 Each
42 23 Supply and fix digital 3Ph Ammeter, 5A, Class 1 flush mounting of size 96x96mm, suitable for input voltage 17-520V AC (P-P) with inbuilt selector swith and CT/PT of suitable capacity Cat No WDS301FCA00, Make: L&T/HPL/SIEMENS including taking down old unserviceable existing meter of any type 8 Each
43 24 Supply and fix digital 3Ph Voltmeter Class 1 flush mounting of size 96x96mm, suitable for input voltage 17-520V AC (P-P) with inbuilt selector swith and CT/PT of suitable capacity Cat No WDS301FEV00, Make: L&T/HPL/SIEMENS including taking down old unserviceable existing meter of any type 8 Each
44 25 Supply and fixing LED Indication lamp for LT Panel board RED/YELLO/BLUE, Surface Mounted Device LED technology Low Power consumption < 0.6W Low Voltage Glow Protection (LVGP) Cat No: SIL 240A-240V AC Make: L&T or HPL/Havells 20 Each
45 26 Supply and fixing aluminium bus bar of rating 200A to 400A including bending and drilling of holes as required and fixing in LT panels including taking down unserviceable aluminium bus bar complete all as specified and as directed by Engineer-in-Charge. 360 Kilogram
46 27 Control panel wiring with 1.50 sqmm multistranded, PVC insulated copper conductor cable between voltmeter, Ammeter and their selector switch complete with CTs including taking down unserviceable wiring complete all as specified and as directed by Engineer-in-Charge.\nMAKE: L&T / FINOLEX / GRANDPLAY / ANCHOR / POLYCAB\n 4 Each Job
47 28 50 sqmm copper conductor (HRFR) PVC insulated (unsheathed) flexible single core cable for power panel wiring between bus bar to MCCB of different capacity, fixed in repairs, complete all as specified and as directed by Engineer-in-Charge.\nMAKE: L&T / FINOLEX / GRANDPLAY / ANCHOR / POLYCAB 15 Running metre
48 29 Supply and fixing copper lugs suitable for 50 sqmm single core copper conductor cable, fixed in repairs, complete all as specified and as directed by Engineer-in-Charge. 60 Each
49 30 Supply and fixing single phase preventor 230 volts, 50 cycles, fixed in repairs, complete all as specified and as directed by Engineer-in-Charge.\nMake: Minilec 4 Each
50 31 Removing of existing filter media from the pressure filteration plant and cleaning of pressure filter tank by removing of sand, stone, mud, sludge and broken stainer etc and supply and fixing of new stainer approx 50 Nos and supply and filling of new filter media of the following size: -\n(a) 25-15 mm natural pabbles = 15 cubic feet\n(b) 15-10 mm natuarl pabbles = 15 cubic feet\n(c) 8-16 mm mesh size sand = 25 cubic feet\n(d) 16-32 mm mesh size sand = 100 cubic feet and \n(e) testing of filter including applying of existing synthetic enamel paint two coats over a coat of red oxide primer complete all as specified and specified. 2 Each\n Job
51 32 Taking down unserviceable water level indicator and supply, install, testing and commissioning of wall mounting solid state water level indicator cum controller AC & DC driven with 5 stage LED indication system (20, 40, 60, 80 & 100%) with following specifications: -\nMake: GUATDIAN of Model:LL-C2\n(a) AC&DC diven with 6V battery backup to support the display electronic circuit in case of the power failure.\n(b) An Electric isolation system to isolate the level sensing probe signal voltage/power from the main power supply line.\n(c) High speed steel sensor probes (6 Nos) for the purpose of sensing water levels.\n(d) The system should have provision to trip off the motor in case of the empty tank status with motor on and off LED indication. 1 Each\n Job
52 33 Supply and fixing of wirinf using flexible copper cable of size 6 core 14/0.006 along with GI support wire including taking down unserviceable wiring complete all as specified and as directed by Engineer-in-Charge.\nMAKE: L&T / FINOLEX / GRANDPLAY / ANCHOR / POLYCAB\n 200 Running metre
53 34 Supply and installation in repairs 12 volts 150 AH lead acid wet maintenance free batteries including initial charging with necessary material connecting with battery lead of DG set at site and setting aside including connecting with battery lead of generator complete. MAKE: EXIDE/AMARON/OKAYA 2 Each
54 35 Dismantling of existing unserviceable/rusted panle and supply, fixing, fabrication, installation, testing and commissioning of Panel box, double door, totally closed, consists of 3 compartments having front shutters with floor and wall mounting provisions, dust and vermin proof, having dimensions 120cm (height) x 80mm (width) x 25cm (depth) fabricated, suitable for 440 Volt 3 phase 4 wire system, made out of 3.0mm thick CRCA sheet and built upon regid frame work of angle iron of size 50x50x6mm and having front doors with neoprence rubber gasket including danger plate, earthing strip point at side, ventilation louvers at the side, bottom detachable gland plate complete with suitable size of Zinc plated nuts, bolts and washers etc. The pannel shall be powder coated and the power and control circuit diagram shall be accompany the eqpt and circuit wiring with colour code solid conductor copper cable for easy identification including incomming/ outgoing cable holes at the bottom. The Panel shall be emmbeded with 50 x 6 mm MS channel and 30 cm above the normal ground level complete with PCC foundation (1:2:4 ) type B2 incl all connections of lugs complete including taking down old panel all as specified and directed. Size of panel should be with provisions and to accomodate the following items: -\n 1 Each\n Job
55 35.01 (a) Solid state fault analyzer-cum-controller (CB-4SA) - 01 No\n(b) Air Break 3 pole power contactors MNX-50-3 Nos (for star-delta auto starter)\n(c) Bakelite connection strips - 04 Nos\n(e) Copper cable jumpers - 06 Nos\n(f) Digital Ammere Meter - 01 No.\n(g) Digital Voltmeter - 01 No\n(h) Rotary selector switch - 02 Nos\n(j) Current transformers - 06 Nos\n(k) Solid state signal amplifier required for underground cabling
56 36 Disconnecting and taking out old unserviceable gaseous chlorination system and supply, installation, testing and commisioning of chemical dosing system suitable for inject solution up to 25 LPH, complete with strainer, stroke controllet, FRP tank of 150 litres capacity, Inlet and outlet piping and comprising of Electrically operated dosing pump and agitator coupled with three phase 415 volts, 50 Hz, 0.50Hp, 1440 RPM motor with starter, agitators blade shall be made up of stainless steel with anticorrosive paint including addition and alteration, taping of existing CI/DI pipe and making connections for Injection of Chlorine and making electrical connections and as directed by Engineer-in-Charge.\nMAKE: Satya Sai Aqua Pura services or Equal approved make by E-in-C's branch 1 Each\n Job
57 37 Material & labour for Earthing using galvanised iron earth plate electrode of size 60cm X 60cm X 6mm thick burried directly in ground vertically at a depth not less than 2.25 mtr below normal ground level with top edge of earth plate at a depth not less than 1.5 mtr below normal ground level, earth plate surrounded from all sides by 15 cm thick and packed layer of charcoal dust and common salt filling in alternate layers including refilling with good earth as specified and electrode connections by using galvanised iron strip of size 32x6mm by means of bolts, nuts, check nuts and washers made of GI and provision of GI pipe medium grade 40 mm dia for protection of earthing lead and 20mm dia for watering arrangement including funnel, wire mesh, CI pit cover and PCC chamber pit with PCC 1:2:4 type B-2 (including necessary excavation and earth work disposal of surplus soil to a distance not exceeding 50 mtr all as specified and shown on plate No 5 of SSR Part-I 2009. 6 Each\n Set
58 38 Supply only Altoc GP Calcium Based granular Disinfectant (Aqua fit) in 45kg packaging plastic dram for water treatment complete all as specified and as directed by Engineer-in-Charge.\nMake: Purichlor or equivalent E-in-C's approved make. 1000 Kilogram
59 39 Supply and fixing current transformer (CT) of 200/160/63/32/5 Amps ratio resin cast type wound CT on LT panel board and connections to secondary terminals to ammeter including taking down old unserviceable CT complete all as specified and as directed by Engineer-in-Charge.\nMAKE: GE/KAPPA/RISHAB 42 Each\n Set
60 40 Mild steel framed work with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work con- forming to Fe.290.Gde-E-165, including applying two coats of synthetic enamel paint over a coat of red oxide primer including taking down of old mild steel framed work complete all as specified and as directed by Engineer-in-Charge 100 Kilogram
61 41 SCHEDULE 'A' PART-II (Schedule of credit) Credit amount of Rs (Refer schedule of credit) for retrieved material mentioned in Sch 'A' Part-II of Tender documents in PDF form will be deducted offline during acceptance of tender of lowest bidder.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2020 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail