}

Development Of Tree Park At Sastripuram Colony Park-V, Ward No.58 In Cir-Xi, Charminar Zone, Ubd, Ghmc For The Year 2020-21, HYDERABAD-Telangana

Greater Hyderabad Municipal Corporation-GHMC has published Development Of Tree Park At Sastripuram Colony Park-V, Ward No.58 In Cir-Xi, Charminar Zone, Ubd, Ghmc For The Year 2020-21. Submission Date for this Tender is 22-10-2020. Gardening Tenders in HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

25757188
Development Of Tree Park At Sastripuram Colony Park-V, Ward No.58 In Cir-Xi, Charminar Zone, Ubd, Ghmc For The Year 2020-21
Open Tender
Indian
Telangana
HYDERABAD
22-10-2020

Tender Details

Development Of Tree Park At Sastripuram Colony Park-V, Ward No.58 In Cir-Xi, Charminar Zone, Ubd, Ghmc For The Year 2020-21

Key Value

Document Fees
Refer document
EMD
INR 12163.0 /-
Tender Value
INR 4.86 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Development Misc 1.00 Ls 1.00 37.84
Miscellaneous
2 Development Approved rates 300.00 each 33.00 9900.00
Plant Material: Tall Plants (8"X10")
3 Development GST 1.00 Percent 12.00 51060.23
Add GST 12%
4 Development 82.0 7.56 Each Tanker 3352.30 25343.39
Watering by tanker 25000 liters @ 5 trips of 5000 liters containers 2) Shrubbery area watering March, April & May - 90 waterings June, July, Aug & Sep - 45 waterings Oct,Nov,Dec,Jan &Feb - 75 waterings Total= 210 waterings 100 sqmt X 210 waterings X 5 ltr/ sqmt /25000 =
5 Development 76.0 17.76 Each Tanker 3352.30 59536.85
TALL PLANTS:- Cost and supply of water @ 20 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity (5 trips per day - 25000 Ltrs) total (50 waterings from July 2020 to March 2021) & (24 waterings from April 2021 to June 2021) Total - 74 waterings
6 Development Approved rates 160.00 Cum 252.41 40385.60
Path Ways: Supply & staking of gravel at site to the department gauge for premeasurements and it shall be composed of well garded coars silicious grains shrp & gritty to touch and free from dirt & other deleterious matter exeed 10% passing through 75 micron IS sieve and should have liquid limit and palsticity index not more than 6 as per standard specification no 138 of APSS the cost including of transportation, loading , unloading, stacking at the site including all labour charges taxes & seiniorage chares etc, complete ( 200 sqmt X 0.30 =
7 Development Approved rates 6.00 Each 10700.00 64200.00
Supply of Benches :- Supply of Artistic benches as Fruits / Music instruments / Wooden trees log design log design including cost and conveyance of all materials and labour charges, complete.
8 Development Approved rates 280.00 rmt 227.00 63560.00
Pre Cast ACC Kerbs Path Way:- Supply and fixing of pre cast ACC kerbs with size 100mm (thickness) X 600 mm length X 400mm height , semi batged at top in M30 grade including cost and conveyance to site and labour charges for laying true to allotment and pointing with dement mortor (1: 3 Prop etc)( including spreading of gravel)
9 Development 69 ( C) 300.00 Each 28.00 8400.00
Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
10 Development 69 (b) 300.00 100 Nos 2139.20 6417.60
Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (8"x10" bag plants)
11 Development 65 (b) 300.00 100 Nos 247.46 742.38
Application of FYM including internal distribution in red soil areas
12 Development 65 (a) 300.00 100 Nos 1233.88 3701.64
Application of red soil and FYM including internal distribution 60 cm pit
13 Development 64 (b) 300.00 100 Nos 6761.22 20283.66
TREE PLANTING: Digging of pits 0.60 mt X 0.60 mt X 0.60 mt
14 Development 372 (3) 180.00 100 Sq.mt 4103.11 88627.18
Maintenance of hedge/shurb planting : i) Trimming of hedges/ shrubs once in 15 days ii) Watering hadges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application of fertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.. ( For 12 .months)
15 Development 212 c 1800.00 100 Nos 171.31 3083.58
Planting of bag plants 5?x9?
16 Development 212 b 1800.00 100 Nos 114.21 2055.78
Application of chemicals and fertilizers @ 20gms/dose
17 Development 212 a 72.00 Kg 50.00 3600.00
Cost of chemicals fertilizers @ 20gms/ dose (2 operations)
18 Development 211 a 1800.00 100 Nos 95.18 1713.24
Loading/unloading of bag plants where departmental vehicles are provided.
19 Development 210 a 1800.00 100 Nos 95.18 1713.24
Internal transport of bag plants 5"X9""
20 Development 209 I a 1800.00 100 Nos 379.17 6825.06
Transportation of bag plants from nursery to planting site including loading and unloading upt o a lead of 3 Kms 5"X9""
21 Development 206 a 1800.00 100 Nos 1072.93 19312.74
HEDGE/SHURB PLANTING: Digging of pits 30 cm cube pit
22 Development SSR 2013-14 6.00 Hour 1000.00 6000.00
Engaging of JCB for removal of boulders for improving apperience and cleaning the site for the plantation works
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail