}

Procurement Of Flame Arrestor, IOCL AOD DIGBOI TINSUKIA ASSAM-Assam

Indian Oil Corporation Limited-IOCL has published Procurement Of Flame Arrestor. Submission Date for this Tender is 31-10-2020. Spare Part Tenders in IOCL AOD DIGBOI TINSUKIA ASSAM Assam. Bidders can get complete Tender details and download the document.




Tender Notice

25738404
Procurement Of Flame Arrestor
Open Tender
Indian
Assam
IOCL AOD DIGBOI TINSUKIA ASSAM
31-10-2020

Tender Details

Procurement Of Flame Arrestor , Design , Engineering , Preparation Of Detailed Manufacturing Drawing , Raw Material Procurement , Manufacturing , Assembly , Inspection , Testing , Packing And Supply Of Detonation Flame Arrestor ( Dfa-A/B ) Including All AccessoriesFor Detail , Please Refer ToMechanical Datahsheet For Flame Arrestor:Iocd-Mes-Dst-14-002-002 Date : 28 . 08 . 2020 Rev : 2Process Data Sheet For Detonation Flame Arrestors: Iocd-Prc-Dst-14-002-005 Date : 21 . 08 . 2020 Rev : R0Technical Specification For Flame Arrester: Iocd-Prj-Tdr-14-002-002 Date : 28 . 08 . 2020 Rev : 0Quality Assurance Plan For Flame Arresters:Iocd-Prj-Tdr-14-002-003 Date : 28 . 08 . 2020 Rev : 0Operating Conditions:Fluid: Volatile Organic Compound ( Voc ) + Air Mixture , ContinuousOperating Flow: 1000 M3/Hr ( Normal ) : 1500 M3/Hr ( Rated ) Normal Pressure ( Mm Wc ) :1100Design Pressure ( Mm Wc ) :1375Pressure Drop ( Mm Wc ) :100Design Temperature ( C ) :300Flame Arrester Shall Be Suitable For Prevention Of Flame Travel From Either Side . , Spare: 1 Set Gasket For One No . Of Flame Arrestor Only . Unit Each ( Ea ) Indicates Set . Moc: PtfeFor Detail , Please Refer To Mechanical Datahsheet For Flame Arrestor:Iocd-Mes-Dst-14-002-002 Date : 28 . 08 . 2020 Rev : 2Process Data Sheet For Detonation Flame Arrestors: Iocd-Prc-Dst-14-002-005 Date : 21 . 08 . 2020 Rev : R0Technical Specification For Flame Arrester: Iocd-Prj-Tdr-14-002-002 Date : 28 . 08 . 2020 Rev : 0Quality Assurance Plan For Flame Arresters:Iocd-Prj-Tdr-14-002-003 Date : 28 . 08 . 2020 Rev : 0 , Spare: 1Set Flame Filter Element For 1 No . Of Flame Arrestor OnlyUnit Each ( Ea ) Indicates Set . Moc: Ss316 TiFor Detail , Please Refer ToMechanical Datahsheet For Flame Arrestor:Iocd-Mes-Dst-14-002-002 Date : 28 . 08 . 2020 Rev : 2Process Data Sheet For Detonation Flame Arrestors: Iocd-Prc-Dst-14-002-005 Date : 21 . 08 . 2020 Rev : R0Technical Specification For Flame Arrester: Iocd-Prj-Tdr-14-002-002 Date : 28 . 08 . 2020 Rev : 0Quality Assurance Plan For Flame Arresters:Iocd-Prj-Tdr-14-002-003 Date : 28 . 08 . 2020 Rev : 0 .

Key Value

Document Fees
Refer document
EMD
INR 46044.0 /-
Tender Value
Refer document

BOQ Items

Name of Supply: PROCUREMENT OF FLAME ARRESTOR AS PER TENDER SPECIFICATION AT DIGBOI REFINERY
Sl. No. Item Description Item Code / Make Quantity Units
1 10 Design, Engineering, Preparation of detailed manufacturing drawing, Raw material procurement, Manufacturing, Assembly, Inspection, Testing, Packing and Supply of Detonation Flame Arrestor (DFA-A/B) including all accessories\n\nFor detail,please refer to\n\nMECHANICAL DATAHSHEET FOR FLAME ARRESTOR:IOCD-MES-DST-14-002-002 Date : 28.08.2020 Rev : 2\nPROCESS DATA SHEET FOR DETONATION FLAME ARRESTORS: IOCD-PRC-DST-14-002-005 Date : 21.08.2020 Rev : R0\nTECHNICAL SPECIFICATION FOR FLAME ARRESTER: IOCD-PRJ-TDR-14-002-002 Date : 28.08.2020 Rev : 0\nQUALITY ASSURANCE PLAN FOR FLAME ARRESTERS:IOCD-PRJ-TDR-14-002-003 Date : 28.08.2020 Rev : 0\n\nOPERATING CONDITIONS:\n\nFluid: Volatile Organic Compound (VOC) + Air mixture,continuous\nOperating Flow: 1000 m3/hr (Normal): 1500 m3/hr (Rated)\nNormal Pressure (mm WC):1100\nDesign Pressure (mm WC):1375\nPressure drop (mm WC):100\nDesign Temperature(c):300\n\nFlame Arrester shall be suitable for prevention of flame travel from either side. Item 1 2 EA
2 20 Spare: 1 Set Gasket for one no. of Flame arrestor only.\nUnit EACH(EA) indicates "SET".\nMOC: PTFE\nFor detail,please refer to MECHANICAL DATAHSHEET FOR FLAME ARRESTOR:IOCD-MES-DST-14-002-002 Date : 28.08.2020 Rev : 2\nPROCESS DATA SHEET FOR DETONATION FLAME ARRESTORS: IOCD-PRC-DST-14-002-005 Date : 21.08.2020 Rev : R0\nTECHNICAL SPECIFICATION FOR FLAME ARRESTER: IOCD-PRJ-TDR-14-002-002 Date : 28.08.2020 Rev : 0\nQUALITY ASSURANCE PLAN FOR FLAME ARRESTERS:IOCD-PRJ-TDR-14-002-003 Date : 28.08.2020 Rev : 0\n Item 2 1 EA
3 30 Spare: 1set FLAME FILTER ELEMENT for 1 no. of flame arrestor only\nUnit EACH(EA) indicates "SET".\nMOC: SS316 TI\nFor detail,please refer to\nMECHANICAL DATAHSHEET FOR FLAME ARRESTOR:IOCD-MES-DST-14-002-002 Date : 28.08.2020 Rev : 2\nPROCESS DATA SHEET FOR DETONATION FLAME ARRESTORS: IOCD-PRC-DST-14-002-005 Date : 21.08.2020 Rev : R0\nTECHNICAL SPECIFICATION FOR FLAME ARRESTER: IOCD-PRJ-TDR-14-002-002 Date : 28.08.2020 Rev : 0\nQUALITY ASSURANCE PLAN FOR FLAME ARRESTERS:IOCD-PRJ-TDR-14-002-003 Date : 28.08.2020 Rev : 0. Item 3 1 EA
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail