Central Coalfields Limited has published Planning , Design , Supply , Erection , Construction , Installation , Testing And Commissioning Of 5 . 62 Km ( Approx . ) Double Circuit 33 Kv Overhead Transmission Line For Feeding Power To Proposed 2X 16Mva 33/6 . 6Kv Project Substations-Ie Of . Submission Date for this Tender is 09-11-2020. Transmission Line Tenders in AMRAPALI OCP, PO-TANDWA, DIST-CHATRA, JHARKHAND Jharkhand. Bidders can get complete Tender details and download the document.
Name of the Work / Contract No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | A. WORK & SERVICES | |||
2 | 2 | Detailed route survey of over head transmission line ,Soil exploration as required & submission of report (complete as per tender document) | 1 | LS | |
3 | 3 | Bush cutting & cleaning along the route of over head transmission line | 22460 | Sq.M | |
4 | 4 | B. CIVIL & STRUCTURAL WORKS | |||
5 | 5 | Earth work in excavation in all kinds of soil and rock | 243.94 | Cu.M | |
6 | 6 | Earth work in filling with all kinds of soil in layers | 133.79 | Cu. M | |
7 | 7 | P.C.C. ( 1 : 2 : 4 ) at all level and as per system requirement | 116.19 | Cu.M | |
8 | 8 | Painting of steel structure / electrical equipment(including rail pole) (a) Black anti corrosive paint (b) Red -oxide (c) Aluminium paint paint | 2813 | Sq. M | |
9 | 9 | Structural steel for cross arm, bracing and insulator supports of single, double & four pole structurescomplete in all respect and as per scope of work (excluding rail pole) | 12.81 | Mte | |
10 | 10 | Nuts & Bolts | 256 | kg | |
11 | 11 | C. PLANT & MACHINERY ( SUPPLY) | |||
12 | 12 | Supports -Rail Pole - 52 Kg/m, Length -13m | 108 | No. | |
13 | 13 | 33 KV Pin Insulator with pin | 45 | No. | |
14 | 14 | 33 KV Disc/Strain Insulator with hardware | 1170 | No. | |
15 | 15 | 20 mm dia stay set(complete) with 7/12GI Stay wire | 60 | No. | |
16 | 16 | Earthing | |||
17 | 17 | G.I. Pipe earthing earth pit preparation materials all materials including charkole salt cement etc. | 47 | Set | |
18 | 18 | 8 SWG GI wire for continuous earth wire, connection to the metalic parts , connection to metallic support at pole bottom with the earth pit etc. | 1900 | kg | |
19 | 19 | Cradle guards (mat 0.5 X 0.5m) with GI wire | 1 | LS | |
20 | 20 | ACSR ‘ WOLF ‘ Conductor( 95 sq mm Cu ) with 3% sag | 34.7 | KM | |
21 | 21 | Binding wire (Aluminium Conductor) for insulator | 1 | LS | |
22 | 22 | 30 kV Lightning arrestor complete with bracket etc. | 8 | Set | |
23 | 23 | 22 kV XLPE 500 sq.mm single core armored Al cable | 800 | m | |
24 | 24 | Accessories like jointing sleeves, danger plate, crossing number plate, anticlimbing devices etc. and painting of circuit number and location of pole. | 1 | LS | |
25 | 25 | C1. ERECTION, INSTALLATION & COMMISSIONING | |||
26 | 26 | Erection of electrical and other equipment | 1 | Lot | |
27 | 27 | Commissioning of the OHTL | 1 | Lot | |
28 | 28 | C2 . OTHERS ITEM | |||
29 | 29 | Any other item left out for completion of the project i.e. Design and Engineering Cost, Insurance, Contingency Cost, Store Cost for maintenance of P&M etc. | 1 | LS | |
30 | 30 | C3 . MAINTENANCE AND TRAINING | |||
31 | 31 | Maintenance of the plant for five year after commissiong | 1 | LS | |
32 | 32 | Training of the employer personnel as per tender document | 1 | As per req. | |
33 | 33 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001130 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy