Supply And Installation Of Coal / Bio-West / Husk Briquate Fired Internal Furnace Steam Boiler , Chimney And Other Accessories .
Tender Overview
Project Description
Supply And Installation Of Coal / Bio-West / Husk Briquate Fired Internal Furnace Steam Boiler , Chimney And Other Accessories . , 500 Kg/Hr Steam Boiler ( Max . Operating Pressure Of 10 . 5 Kg/Cm2 ) Inclusive Of Pressure Vessel & Safety Valve , Steam Stop Valve , Mountings & FittingsOther Inclusions: Fw Pumps , Id Fan , Control Panel , Insulation Of Boiler , Pressure Reducing Station From 10 . 5 Kg/Cm2 To 3 . 5 Kg/Cm2 Inclusive Of Prv , Strainer , Isolating Valves , Pressure Gauge , Releif Valve , Steam-Trap/By Pass , Etc . , Steam Piping With Fitting Viz . Bends , Flanges , Etc . Along With InsulationA ) High Pressure Ibr Steam Piping From Boiler To PrsB ) N-Ibr Steam Piping From Prs To Equipments / Terminal Points , Ms Flue Gas Chimney With Conical Bottom , Guy-Rope Supported Complete With Base Plates , Emission Sample Port , Support Clits , Foundation Bolts Duly Painted With 2 Coats Of Heat Resistant Paint , Bag Filter Including Cage , Filter Bags , Casing , Hopper , Rotary Air Lock Valve With Geared Motor Pneumatic Solenoid Valves Etc And Structural Supports , Other Inclusions : Air Compressor & Air Piping ( Fd Fan & Air Preheater Also Included ) , Ms Flue Gas Ducting From Boiler To Air Preheater To Bag Filter To Id Fan To ChimneyAir Ducting From Fd Fan To Air Preheater To Boiler , Ms Soft-Water Service Tank Complete With Nozzles For Inlet , Outlet , Overflow Drain , Vent Manhole And Level Indicator With Cocks Complete With Saddle Supports , Water Treatment Plant Along With Multi-Media Filter , Water Softener , Ph-Correction Chemical Dosing System , Water Pump & Interconnecting Pipings , Feed Water Piping With Nrv , Valves & All Other FittingsA ) Water Treatment Plant To Soft Water Service Tank To Fw Pumps ( N-Ibr ) B ) Ibr Feed-Line From Fw Pump To Boiler , Drain , Blowdown , Exhaust & Vent Piping , StructuralsA ) Platform With Guards / Ladder For Bag Filter , Boiler , Soft Water Service Tank ChimneyB ) Supports For Ducting , Steam Piping , Water Piping , Pressure Reducing Station , Etc . , Electricals Including Cabling & Earthing Work , Civil Work Including MaterialsA ) Foundation Of Boiler , Chimney , Air Preheater , Bag Filter , Soft Water Service TankB ) Boiler Room Shed With FloorC ) Coal Storage Room Shed With Floor , Boiler Registration Of Ibr Steam & Ibr Feed Line , Placement Of Boiler On Foundation , Erection Of Boiler Mountings & Fittings , Ibr Steam Line & Ibr Feed Line , Other N-Ibr WorkErection Of Chimney , Bag Filter & Air Preheater , Soft Water Tank , Ducting , Water Piping , Drain Piping , N-Ibr Steam Piping , Insulation , Etc
BOQ
| Name of Work: Supply and installation of Coal / Husk Briquette / Bio-West fired Internal Furnace Steam Boiler, Chimney and other accessories at Sukhchar, Sodepur, North 24 Parganas, West Bengal. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | 500 kg/hr Steam Boiler (Max. operating pressure of 10.5 kg/cm2) inclusive of Pressure Vessel & Safety Valve, Steam Stop Valve, Mountings & Fittings\nOther Inclusions: FW Pumps, ID Fan, Control Panel, Insulation of Boiler | 1001 | 1 | Set |
| 2 | 2 | Pressure Reducing Station from 10.5 kg/cm2 to 3.5 kg/cm2 inclusive of PRV, strainer, isolating valves, pressure gauge, releif valve, steam-trap/by pass, etc. | 1002 | 1 | Set |
| 3 | 3 | Steam Piping with fitting viz. bends, flanges, etc. along with insulation\na) High Pressure IBR Steam Piping from Boiler to PRS\nb) N-IBR Steam Piping from PRS to Equipments / Terminal points | 1003 | 1 | Set |
| 4 | 4 | MS Flue Gas Chimney with conical bottom, guy-rope supported complete with base plates, Emission Sample port, support clits,\nFoundation bolts duly painted with 2 coats of heat resistant paint | 1004 | 1 | Set |
| 5 | 5 | Bag Filter including Cage, Filter Bags, Casing, Hopper, Rotary Air Lock Valve with Geared Motor Pneumatic solenoid Valves etc and structural supports,\nOther inclusions : Air Compressor & Air Piping\n(FD Fan & Air Preheater also included) | 1005 | 1 | Set |
| 6 | 6 | MS Flue Gas Ducting from Boiler to Air Preheater to Bag Filter to ID Fan to Chimney\nAir Ducting from FD Fan to Air Preheater to Boiler | 1006 | 1 | Set |
| 7 | 7 | MS Soft-Water Service Tank complete with nozzles for inlet, outlet, overflow drain, vent Manhole and level indicator with cocks complete with saddle supports | 1007 | 1 | Set |
| 8 | 8 | Water Treatment Plant along with Multi-Media Filter, Water Softener, pH-Correction Chemical Dosing system, Water Pump & interconnecting pipings | 1008 | 1 | Set |
| 9 | 9 | Feed Water Piping with NRV, Valves & all other fittings\na) Water Treatment Plant to Soft Water Service Tank to FW Pumps (N-IBR)\nb) IBR Feed-Line from FW Pump to Boiler | 1009 | 1 | Set |
| 10 | 10 | Drain, Blowdown, Exhaust & Vent piping | 1010 | 1 | Set |
| 11 | 11 | Structurals\na) Platform with Guards / Ladder for Bag Filter, Boiler, Soft Water Service Tank Chimney\nb) Supports for Ducting, Steam Piping, Water Piping, Pressure Reducing Station, etc. | 1011 | 1 | Set |
| 12 | 12 | Electricals including Cabling & Earthing work | 1012 | 1 | Set |
| 13 | 13 | Civil work including materials\na) Foundation of Boiler, Chimney, Air Preheater, Bag Filter, Soft Water Service Tank\nb) Boiler Room Shed with floor\nc) Coal Storage Room Shed with Floor | 1013 | 1 | Set |
| 14 | 14 | Boiler Registration of IBR Steam & IBR Feed Line | 1014 | 1 | Set |
| 15 | 15 | Placement of Boiler on foundation, Erection of Boiler Mountings & Fittings, IBR Steam Line & IBR Feed Line | 1015 | 1 | Set |
| 16 | 16 | Other N-IBR work\nErection of Chimney, Bag Filter & Air Preheater, Soft Water Tank, Ducting, Water Piping, Drain Piping, N-IBR Steam Piping, Insulation, etc | 1016 | 1 | Set |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed