Balance Renovation And Decoration Work From 1St Floor To 7 Th Floor In Jkb Building Along With Project Monitoring Room In 4Th Floor Of Jkb Building Sector V Salt Lake Kolkata 700091

Tender Notice

25729921
Balance Renovation And Decoration Work From 1St Floor To 7 Th Floor In Jkb Building Along With Project Monitoring Room In 4Th Floor Of Jkb Building Sector V Salt Lake Kolkata 700091
Indian
West Bengal
15-10-2020
13-11-2020
18-11-2020

Tender Details

Balance Renovation And Decoration Work From 1St Floor To 7 Th Floor In Jkb Building Along With Project Monitoring Room In 4Th Floor Of Jkb Building Sector V Salt Lake Kolkata 700091

Key Value

Document Fees
Refer document
EMD
INR 362866.00 /-
Tender Value
Refer document

BOQ Items

Name of Work: Balance renovation & decoration work from 1st floor to 7 th floor in JKB Building along with Project Monitoring Room in 4th floor of JKB Building , Sector-V, Salt Lake, Kolkata -700091.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Supply & delivery of best quality sofa set (2+1) seater (colour-white/grey/light golden) of Mobel furniture's or similar approved make as per following specification of Engineer-in-charge. Specifications:- seat size L-2'4"x W (per seater)- 2'6"x H-2', Elaborate wooden design in front and back, itallian leather seat with 40 HD foam cuhion complete. 20 seater
2 2 Tab Chair with writing Desk Body. Ply wood covered with black art Leather, Frame. MS with chrome and writing Desk, Plastic 80 each
3 3 Providing, fitting and fixing of 17mm thick high gloss Italian marble of variety Diana/Demartino/Botticino/Perlato/Avorio on the top and side of office table, side and back unit table top making suitable arrangements to hold the stone properly with approved polymerised adhesives (6mm thick) as per ISI specifications. (The rate includes of cost of all materials including taxes, cost of accessories, fitting and fixtures. scaffolding, labour charges and any other incidental charges etc.(Approved rate of SE,North 24 pgs,W/S Circle,PHE Dte dt 28/05/2018) 400 sft
4 4 Supplying delivery and installation of side unit made up of 19mm thick boiling water proof block board conforming to IS 1659-1990 & 12mm, 6mm conforming to IS 303-1989 bonded with phenol formaldehyde resin conforming to IS-848-1974 finished with 3mm thick veneer of variety wenge/sapeli/white koto/cedar etc. of approved make over the ply base including the cost of cealer matt polish with 8 nos drawer including locking arrangement, I cabinet unit finished with 0.8mm laminates inside. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, labour charges and any other incidental charges etc. complete in all respect) 100 sft
5 5 Supplying delivery and installation of back unit made up of 19mm thick boiling water proof block board conforming to IS 1659-1990 & 12mm, 6mm conforming to IS 303-1989 bonded with phenol formaldehyde resin conforming to IS-848-1974 finished with 3mm thick veneer of variety wenge/sapeli/white koto/ cedar etc. of approved make over the ply base including the cost of cealer matt polish with suitable nos drawer including locking arrangement, 1 cabinet unit finished with 0.8mm laminates inside. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, labour charges and any other incidental charges etc. complete in all respect) 190 sft
6 6 Supply , fitting, fixing best quality designed 3-D wallpaper with 100% washable property of approved brand fixing on wall, wooden partition, panelling after surface treatment with paint filler and two coats of approved primer including cutting to requisite sizes as necessary, complete as per approved design, drawing . (The rate includes of cost of all materials including taxes, cost of accessories, fitting and fixtures, labour charges and any other incidental charges etc. complete in all. 1600 sft
7 7 Providing Wall partitioninig with 9mm. Thick boiling water proof ply conforming to IS;303-1989 bonded with phenol formaldehyde synthetic resin conforming to IS:848-1974 on both sides of approved make including the cost of supporting frame work of sal wood (local) section 50mm. X37.5 mm. and teak wood battens/lipping etc. as per approved design, drawing and direction of Engineer-in-Charges. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, scaffolding, labour chages and any other incidental charges etc. complete in all respect) 2000 sft
8 8 Providing wall panelling with 9mm. Thick boiling water proof ply conforming to IS:303-1989 bonded with phenol formaldehyde synthetic resin condorming to IS: 848-1974 on one side of approved make including the cost of supporting frame work of sal wood (local) section 50 mm. X 37.5 mm. and teck wood battens / lipping etc. as per approved design, drawing and direction of Engineer-in-Charge (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, scaffolding, labour chages and any other incidental charges etc. complete in all respect) 7700 sft
9 9 Providing Wall partitioninig with 3 mm. thick veneer of variety wenge/ sapeli/ white koto/ cedar/ moibi etc. of approved make over the ply base including the cost of cealer polish matt finish as per approved design, drawing and direction of Engineer-in-Charge. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, scaffolding, labour chages and any other incidental charges , but excluding the cost of ply and supporting wooden frame work complete in all respect) 4300 sft
10 10 Supplying delivery and installation of table made up of 19 mm thick boiling water proof block board conforming to IS 1659-1990 & 12 mm., 6 mm. conforming to IS 303-1989 bonded with phenol formaldehyde resin conforming to IS 848-1974 finished with 3 mm thick veneer of variety wenge/ sapei/ white koto/ cedar etc. of approved make over the ply base including the cost of cealer matt polish with multiple stone finish highligher in front panel with 3 nos drawer including locking arragement, 1 cabinet unit finished with 0.8 mm laminates inside. (The rate includes of cost of all materials including taxes, cost of accessories, fittings and fixtures, scaffolding, labour chages and any other incidental charges etc.complete in all respect) 90 sft
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2020 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail