| 1 | 1 | Labour charges for erection of structures as per drawing issued by the Engineer (Light section weight below 14 Kg/m) | Item1 | 0.425 | MT |
|---|
| 2 | 2 | Labour charges for erection of 11 KV VCB using crane including fixing of Tandem rod, alignment & support structure providing holes. | Item2 | 1 | No. |
|---|
| 3 | 3 | Labour charges for erection of 11 KV CT | Item3 | 3 | No. |
|---|
| 4 | 4 | Supply of CT Jn box out of 14 SWG (2mm) M.S.Sheet box shall be vermin proof with sturdy hinges for mounting Terminal blocks (40x30x15 cm) | Item4 | 1 | No. |
|---|
| 5 | 5 | Labour for erection of CT Jn box including fabrication of clamps | Item5 | 1 | No. |
|---|
| 6 | 6 | Labour for erection of Isolators /AB Switches with proper alignments including accessories | Item6 | 2 | No. |
|---|
| 7 | 7 | Labour charges for Erection of stung bus and related hardwares, fitting, clamps including meggering, hoisting of lrn insulators and other consumables. (11 KV Single Zebra ACSR conductor Stung Bus/Phase) | Item7 | 3 | No. |
|---|
| 8 | 8 | Labour charges for erection of bus bat with appropriate machineries and consumables including suitable modifications of end clamps, providing of holes etc.( Using 50 mm IPS aluminium tube without making bend) | Item8 | 15 | MT |
|---|
| 9 | 9 | Labour charges for erection of single jumpers and droppers using Moose/Zebra/Panther conductors including suitable modifications of end clamps, providing holes etc., wherever necessary | | | |
|---|
| 10 | 10 | Upto height of 6m to 10m from ground level | Item9 | 6 | No. |
|---|
| 11 | 11 | Upto height of 6m from ground level | Item10 | 9 | No. |
|---|
| 12 | 12 | Supply of power connectors as per IS code | Item11 | 6 | No. |
|---|
| 13 | 13 | Tension fitting clamp 4 bolted for zebra | Item12 | 6 | No. |
|---|
| 14 | 14 | Switch end clamp for single zebra | Item13 | 3 | No. |
|---|
| 15 | 15 | Switch end clamp for 2'' bus bar | Item14 | 3 | No. |
|---|
| 16 | 16 | Switch end clamp for Mink | Item15 | 6 | No. |
|---|
| 17 | 17 | T clamp for Single Zebra to Single zebra | Item16 | 3 | No. |
|---|
| 18 | 18 | T clamp for 2\" Bus bar | Item17 | 3 | No. |
|---|
| 19 | 19 | Coronal Bell 50 mm | Item18 | 3 | No. |
|---|
| 20 | 20 | Labour charges for cable core end termination | Item19 | 100 | No. |
|---|
| 21 | 21 | Labour charges for erection of cable in cable duct/Trench/clamping on structures and fixing at uniform intervals | | | |
|---|
| 22 | 22 | Upto 8 core | Item20 | 0.2 | Km |
|---|
| 23 | 23 | Above 8 core | Item21 | 0.15 | Km |
|---|
| 24 | 24 | Supply of PVC stickers for breakers, panels as required by the Engineer | Item22 | 10 | sq. m |
|---|
| 25 | 25 | Fixing of PVC stickers for breakers, panels and other works as required by the field Engineer | Item23 | 10 | sq. m |
|---|
| 26 | 26 | Labour charges for painting of structures with Aluminium paint | Item24 | 50 | sq. m |
|---|
| 27 | 27 | Labour charges for End Termination of Cable | Item25 | 2 | No. |
|---|
| 28 | 28 | Labour charges for Straight Joint of cable. | Item26 | 1 | No. |
|---|
| 29 | 29 | Sub Total | Item54 | 1 | Each |
|---|
| 30 | 30 | EPF @ 13.00% | Item55 | 1 | Each |
|---|
| 31 | 31 | ESI @ 3.25% | Item56 | 1 | Each |
|---|
| 32 | 32 | SGST % | Item57 | 1 | Each |
|---|
| 33 | 33 | CGST % | Item58 | 1 | Each |
|---|
| 34 | 34 | IGST % | Item59 | 1 | Each |
|---|