}

Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reach Ii In Peedikapara Section Of Thamarassery Range Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reac, Peedikapara Tharassery-Kerala

Forest Department-FD has published Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reach Ii In Peedikapara Section Of Thamarassery Range Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reac. Submission Date for this Tender is 20-10-2020. Environmental Decontimination Service Tenders in Peedikapara Tharassery Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

25704508
Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reach Ii In Peedikapara Section Of Thamarassery Range Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reac
Open Tender
Indian
Kerala
Peedikapara Tharassery
20-10-2020

Tender Details

Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reach Ii In Peedikapara Section Of Thamarassery Range Estimate For The Cost Of Construction 28 Nos Cairns At Vfc Item No 133 Sy No 149/3 At Peedikapara Reach Ii In Peedikapara Section Of Thamarassery Range Of Kozhikode Division

Key Value

Document Fees
INR 560 /-
EMD
INR 5050.0 /-
Tender Value
INR 2.02 Lakhs /-

BOQ Items

Name of Work: Estimate for the cost of Construction 28 Nos cairns at VFC Item No 133 sy No 149/3 at Peedikapara Reach II in Peedikapara Section of Thamarassery Range during 2020-2021
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means\nover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil 8.064 M3
2 2 Random rubble masonry with hard stone in superstructure above plinth level with cement mortar 1:6 . (local collection )7.1.1 28.224 M3
3 3 Pointing on stone work with cement mortar 1:3 , (13.3.3) 100.8 M2
4 4 Cement plaster 1:4 12mm thick(13-4-1) 10.08 M2
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail