}

Supply, Installation And Commissioning Of Jacquard Assembly For Silk Power Loom, Power Consumption 2-5 Kw. Machine Type Automatic Number Of Hooks 1344. Max Speed 70-150 Rpm. Advance Design System With All Spare Parts. Aul Electrical Wires Should Be Conc-Himachal Pradesh

Himachal Pradesh General Industries Corporation Limited has published Supply, Installation And Commissioning Of Jacquard Assembly For Silk Power Loom, Power Consumption 2-5 Kw. Machine Type Automatic Number Of Hooks 1344. Max Speed 70-150 Rpm. Advance Design System With All Spare Parts. Aul Electrical Wires Should Be Conc. Submission Date for this Tender is 22-10-2020. Spare Part Tenders in Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

25704369
Supply, Installation And Commissioning Of Jacquard Assembly For Silk Power Loom, Power Consumption 2-5 Kw. Machine Type Automatic Number Of Hooks 1344. Max Speed 70-150 Rpm. Advance Design System With All Spare Parts. Aul Electrical Wires Should Be Conc
Tender
Indian
Himachal Pradesh
22-10-2020

Tender Details

Supply, Installation And Commissioning Of Jacquard Assembly For Silk Power Loom, Power Consumption 2-5 Kw. Machine Type Automatic Number Of Hooks 1344. Max Speed 70-150 Rpm. Advance Design System With All Spare Parts. Aul Electrical Wires Should Be Concealed At Nsm Nurpur

Key Value

Document Fees
Refer document
EMD
INR 5000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail