Cable Route Construction Works For Phase I Nofn Project For Connecting Block Panchayats Of Daregaon Gp On Optical Fibre Cable For Ph1 Block Phulambri In Area Of Aurangabad Ssa Of Bsnl On Behalf Of Bbnl , Excavating Trenches Upto A Depth Of 1 . 65 Mt . And Back Filling The Excavated Trenches After Laying The Hdpe / Plb Pipe With Or Without Protection As Per Tender Specification . , I ) In Kuchcha Soil ( Non-Rocky Soil ) , Ii ) In Pucca Soil ( Soft-Rocky Soil ) , Iii ) In Rocky Soil ( Hard-Rocky Soil ) , Road / Rail Crossing Through Horizontal Boring Method And Inserting 65Mm / 40Mm Dia G . I . Pipes And Pushing Plb Hdpe Pipe / Coil Inside And Drawing 6Mm Pp Rope . , Lying Of Plb Hdpe Duct By Hdd Method At A Depth Of 1 . 65M Or More ( For Single Plb Pipe ) , Laying Of Plb Hdpe Pipe / Gi Pipe / Rcc Pipe / Dwc , Laying Of Single Plb Hdpe Pipes / Coils , Coupled With Coupler , Laying Of Fixing Of G . I . Pipes ( Medium Duty Class Having Inner Diameter Of 50Mm As Per Isi Specifications ) In Trenches With Plb Hdpe Pipes / Coils Inside , Laying And Fixing Of Gi Pipes ( Medium Duty Class Having Inner Diameter Of 50Mm As Per Isi Specifications ) In Trenches On Bridges And Culverts With Plb Hdpe Pipes / Coils Inside , Laying Of Full Round Rcc ( Isi Mark ) / Dwc Pipe ( As Per Existing Tec Gr No . Gr / Dwc-34 / 01 / Sep 2007 With Latest Amendment ) In Trenches Over Plb Hdpe Pipes / Coils On Culverts / Bridges / Nulla And For Cases Where Cable Is Laid At Less Depth ( Wherever Required ) , Laying Of Half- Split Rcc ( Isi Mark ) / Dwc Pipe ( As Per Existing Tec Gr No . Gr / Dwc-34 / 01 / Sep 2007 With Latest Amendment ) In Trenches Over Plb Hdpe Pipes / Coils On Culverts / Bridges / Nulla And For Cases Where Cable Is Laid At Less Depth ( Wherever Required ) , Providing Cement Concrete 1:2:4 At Wheel Guard Of Bridge / Culvert Over The Toe Or In The Trench For Protection , Providing Cement Concrete 1:2:4 Over The Plb Hdpe Pipe With Wire Mesh In The Trenches For Protection , Where The Depth Is Less Than 120 Cms ( Cement Concrete As Per Specification ) , Cable Laying By Pulling / Blowing , Laying Of Of Cable By Pulling / Blowing Method Including Opening Of Manhole . Sealing Of Plb Hdpe Pipes By , Splicing Of Of Cable , Splicing Of Fibres In Existing / New Joint Chambers For Making Straight / Branch Joints On New Routes Or At Fpoi And End To End Testing Of All Fibres After Splicing . The Rates Specified Are Inclusive Of Installation And Splicing Of Splitters Also Wherever App , Splicing Of 24Fibres Cable In The Fiber Termination Box At The Gram Panchayats And In Existing / New Joint Chambers For Making Straight / Branch Joints On New Routes Or At Fpoi And End To End Testing Of All Fibres After Splicing . The Rates Specified Are Inclusive Of Installation And Splicing Of Splitters And Installation / Mounting Of The Ftb As Specified Also Wherever Applicable . , Jointing Chamber , Construction Of Bricks Joints Chamber As Per Specification And The Construction Practice As Specified In The Tender Documents , Construction Of Pre Fabricated Rcc Joints Chamber As Per Specification And The Construction Practice As Specified In The Tender Document , Route Indicator , Supply And Fixing Of Rcc / Stone Route / Joint Indicator By Contractors . Diging Of Pit 1 Mater Towards Jungle Side On Each Manhole / Joint Chamber , For Fixing Of Route / Joint Indicator , Fixing And Concreting Of Routes / Joint Indicator . Painting And Sign Writing Of Route / Joint Indicators . , Restoration And Road Surface , Road Restoration Work With Bituminous Macadam For Semi Grouting 50Mm Thick And Premix Carpet Surfacing 25Mm Thick Over The Grouted Surface ( Total Upto 75Mm Thick ) , Including Supply Of Asphalt Etc . To Evenly Match The Road , Including Consolidation And Rolling As Per Standard Specification Of Dsr 1997 . , Road Restoration Work With Cement Concrete 1:4:8 Mix For Thickness Varying From 150Mm To 225Mm , Including Supply Of Concrete To Evenly Match The Road . , Route Index Diagram , Supply Of Route Index Diagram In Hard As Well As Soft Copy On Cd For Complete Block , Videography Of Route On Which Cable Is Laid ( 6 Set ) , Laying Of Of Cable In Buildings ( Leading In Work ) , Laying And Fixing Of Of Cable In Corridor / Riser / Exchange Premises ( Leading In Work ) , Mounting Of Fdms At Olt Locations , Physical Mounting Of Fdms On Wall At Olt / Exchange Locations , Recovery Of Store , Recovery Of Empty 24F Cable Drum , Miscellaneous / Contingencies For Petty Works @ 5% Of Total Amount Rs 2967708 / -