| 1 | 1 | Labour to be engaged for site clearance by way of removal of malba and drain clearance before execution of work. | | 12 | No. |
|---|
| 2 | 2 | Earth work in excavation in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. incl. disposal of surplus excavated earth incl. all leads, lifts & carriage of material by MT / H.L. | | 25 | Cum |
|---|
| 3 | 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering including all leads, lifts and carriage of material by MT / H.L. - All work upto plinth level. 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded crushed stone agg. 20 mm nominal size) | | 17 | Cum |
|---|
| 4 | 4 | Providing and laying damp proof course 40 mm thick with cement concrete 1 : 2 : 4 ( 1 cement : 2 coarse sand : 4 graded crushed stone aggregate 12.5 mm nominal size) including all leads, lifts and carriage of material by MT / H.L \n | | 22 | Sqm |
|---|
| 5 | 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) | | 2 | Cum |
|---|
| 6 | 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars all complete | | 140 | Kg |
|---|
| 7 | 7 | Centring and shuttermg including strutting, propping etc. and removal of formwork for· | | | |
|---|
| 8 | 7.01 | Foundations, footings, bases of columns etc. for mass concrete. | | 76 | Sqm |
|---|
| 9 | 7.02 | Suspended floors, roofs, landings, balconies and access platform. | | 7 | Sqm |
|---|
| 10 | 8 | Providing and laying dry stone agg. using 40mm nominal size incl. spreading, levelling,sand grouting, watering, ramming, etc all complete including all leads, lifts & carriage of material by MT / H.L. | | 26 | Cum |
|---|
| 11 | 9 | Providing and laying 75mm (15% Red, 15% Yellow & 70% grey) thick factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with cement sand 1:4 mix and watering etc. all complete as per direction of Engineer-in-charge.including all leads, lifts & carriage of material by MT / H.L | | 335 | Sqm |
|---|
| 12 | 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) including all leads, lifts & carriage of material by MT / H.L. | | 1.3 | Cum |
|---|
| 13 | 11 | 12 mm cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) including all leads, lifts & carriage of material by MT/H.L.\n | | 56 | Sqm |
|---|
| 14 | 12 | Providing and fixing sign board (Iron Made) with both legs embedded in cement concrete block incl. painting and writing & all leads, lifts and carriages of material by MT/HL | | 1 | No. |
|---|