Schedule A-Execution of all works connected with the above work covered under USSOR\r2010 of SEC Railway. (Except Item No.033063 & 045016)
13835848.64
Above/\rBelow/Par
2
01
011011
5688.00
cum
88.16
501454.08
AT Par
501454.08
3
Description:- Earth work in excavation as per approved drawings and dumping at embankment site or spoil\rheap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of\rexcavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in\rlayers of 1.5m each, including incidental work, as per specifications-in All kinds of soils
4
02
012040
2438.00
cum
19.60
47784.80
AT Par
47784.80
5
Description:- Filling, watering and ramming earth in 15 cm layers in floors and foundations with surplus earth\rfrom foundations including 50m lead and 1.5m lift
6
03
031012
813.00
cum
1539.01
1251215.13
AT Par
1251215.13
7
Description:- Providing and laying in position cement concrete of specified proportion excluding cost of cement,\rcentering and shuttering - All works upto Plinth level : 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm\rnominal size)
8
04
033130
10727.00
Kg
87.15
934858.05
AT Par
934858.05
9
Description:- Supplying & mixing high range poly carboxylate ether base water reducing admixture Plast Super-\rC700 conforming to IS:9103-1999 (to be added @ 1% by weight of cement) for CC & RCC work for controlling\rwater cement ratio and for gaining early strength
10
05
041011
2496.00
cum
1974.71
4928876.16
AT Par
4928876.16
11
Description:- Providing and laying in position M 20 Grade concrete for reinforced concrete structural elements\rbut excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per\rIS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as\rper direction of Engineer in charge All work upto plinth level, including raft foundation of washable aprons, HS\rtank, pile cap, footings of FOB, and Platform shelter etc.
12
06
042011
530.00
Sqm
120.70
63971.00
AT Par
63971.00
13
Description:- Centering and shuttering including strutting, propping etc. and removal of form for : Foundations,\rfootings, bases of columns, raft foundation of washable aprons, Pile caps, Footings of FOB etc.
14
07
042012
390.00
Sqm
206.50
80535.00
AT Par
80535.00
15
Description:- Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any\rthickness) including attached plasters, buttresses, plinth and string courses etc.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.