South East Central Railway-SECR has published Improvement Of Platform Surface Of Tilda Goods Shed (Shunting Neck) To Control Dust Pollution.. Submission Date for this Tender is 29-10-2020. Platform Construction Tenders in Chhattisgarh. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item Code | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit |
1 | Schedule A-Execution of all works connected with the above work covered under USSOR\r2010 of SEC Railway. (Except Item No.033063 & 045016) | 13835848.64 | Above/\rBelow/Par | ||||||
2 | 01 | 011011 | 5688.00 | cum | 88.16 | 501454.08 | AT Par | 501454.08 | |
3 | Description:- Earth work in excavation as per approved drawings and dumping at embankment site or spoil\rheap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of\rexcavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in\rlayers of 1.5m each, including incidental work, as per specifications-in All kinds of soils | ||||||||
4 | 02 | 012040 | 2438.00 | cum | 19.60 | 47784.80 | AT Par | 47784.80 | |
5 | Description:- Filling, watering and ramming earth in 15 cm layers in floors and foundations with surplus earth\rfrom foundations including 50m lead and 1.5m lift | ||||||||
6 | 03 | 031012 | 813.00 | cum | 1539.01 | 1251215.13 | AT Par | 1251215.13 | |
7 | Description:- Providing and laying in position cement concrete of specified proportion excluding cost of cement,\rcentering and shuttering - All works upto Plinth level : 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm\rnominal size) | ||||||||
8 | 04 | 033130 | 10727.00 | Kg | 87.15 | 934858.05 | AT Par | 934858.05 | |
9 | Description:- Supplying & mixing high range poly carboxylate ether base water reducing admixture Plast Super-\rC700 conforming to IS:9103-1999 (to be added @ 1% by weight of cement) for CC & RCC work for controlling\rwater cement ratio and for gaining early strength | ||||||||
10 | 05 | 041011 | 2496.00 | cum | 1974.71 | 4928876.16 | AT Par | 4928876.16 | |
11 | Description:- Providing and laying in position M 20 Grade concrete for reinforced concrete structural elements\rbut excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per\rIS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as\rper direction of Engineer in charge All work upto plinth level, including raft foundation of washable aprons, HS\rtank, pile cap, footings of FOB, and Platform shelter etc. | ||||||||
12 | 06 | 042011 | 530.00 | Sqm | 120.70 | 63971.00 | AT Par | 63971.00 | |
13 | Description:- Centering and shuttering including strutting, propping etc. and removal of form for : Foundations,\rfootings, bases of columns, raft foundation of washable aprons, Pile caps, Footings of FOB etc. | ||||||||
14 | 07 | 042012 | 390.00 | Sqm | 206.50 | 80535.00 | AT Par | 80535.00 | |
15 | Description:- Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any\rthickness) including attached plasters, buttresses, plinth and string courses etc. |