| 1 | 1 | Earthwork in excavation in foundation trenches in ordinary and hard soil ( vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M, including all lifts, levelling,ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I | BI01010001010000000000000515BI0100001112 | 564.27 | M3 |
|---|
| 2 | 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including rammIing and watering in layers not exceeding 150mm thick wiih all leads and lifts including cost of all rnaterials, labour, royalty and taxes all complete as per building specrfication and direction of E/l ( Mode of measurement compacted volume). | BI01010001010000000000000515BI0100001113 | 282.135 | M3 |
|---|
| 3 | 3 | Supplying and laying (properly as per design and drawing ) rip-rap with good quality of boulders duly packed including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | BI01010001010000000000000515BI0100001114 | 282.135 | M3 |
|---|
| 4 | 4 | Providing P.C.C. M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, striking, curing, taxes and royalty all complete as per building specification and direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001115 | 282.135 | M3 |
|---|
| 5 | 5 | Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches withtn a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | BI01010001010000000000000515BI0100001116 | 376.18 | M3 |
|---|
| 6 | 6 | CARRIAGE OF MATERIALS\n\nCEMENT, LEAD 20 K.M. | BI01010001010000000000000515BI0100001117 | 47.8 | MT |
|---|
| 7 | 6.01 | SAND, LEAD 20 K.M. | BI01010001010000000000000515BI0100001118 | 205.26 | M3 |
|---|
| 8 | 6.02 | STONE CHIPS, LEAD 20 K.M. | BI01010001010000000000000515BI0100001119 | 127.4 | M3 |
|---|
| 9 | 6.03 | BOULDER, LEAD 20 K.M. | BI01010001010000000000000515BI0100001120 | 141.56 | M3 |
|---|
| 10 | 7 | GST @ 12% | BI01010001010000000000000515BI0100001121 | 2.20993e+06 | Rs. |
|---|
| 11 | 8 | Labour cess @ 1% | BI01010001010000000000000515BI0100001122 | 2.47512e+06 | Rs. |
|---|